FieldReported value
AgencyDepartment of Defense
OfficeCOMMANDER
NAICS336992 — Military Armored Vehicle, Tank, and Tank Component Manufacturing
PSC2355 — Combat, Assault, and Tactical Vehicles, Wheeled
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$408.8M
Current contract value$446.3M
Potential contract value / ceiling$456.9M
Start dateNov 24, 2015
Current end dateJun 30, 2028
Potential end dateJun 30, 2028
Latest award activityMar 12, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 720 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 12, 2026P00227$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
Mar 10, 2026P00226$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
Mar 10, 2026P00226$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
Mar 10, 2026P00226$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
Mar 10, 2026P00227$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
Mar 10, 2026P00227$362.0KADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
Mar 10, 2026P00228$0INCORPORATE THE REVISIONS FOR ATTACHMENTS 23, 25, 52, AND 53.
Mar 10, 2026P00228$0INCORPORATE THE REVISIONS FOR ATTACHMENTS 23, 25, 52, AND 53.
Mar 10, 2026P00228$0INCORPORATE THE REVISIONS FOR ATTACHMENTS 23, 25, 52, AND 53.
Mar 10, 2026P00229$0BILATERAL MODIFICATION FOR THE ENGINEERING CHANGE PROPOSAL 0072 - TASK INSTRUCTION 26, CORROSION RESISTANT ALTERNATOR, PROVIDED AS RETROFIT MODIFICATION KITS FOR THE ACV FAMILY OF VEHICLES IN SUPPORT OF SUSTAINMENT AND RELIABILITY EFFORTS.
Mar 10, 2026P00229$731.9KBILATERAL MODIFICATION FOR THE ENGINEERING CHANGE PROPOSAL 0072 - TASK INSTRUCTION 26, CORROSION RESISTANT ALTERNATOR, PROVIDED AS RETROFIT MODIFICATION KITS FOR THE ACV FAMILY OF VEHICLES IN SUPPORT OF SUSTAINMENT AND RELIABILITY EFFORTS.
Mar 10, 2026P00229$0BILATERAL MODIFICATION FOR THE ENGINEERING CHANGE PROPOSAL 0072 - TASK INSTRUCTION 26, CORROSION RESISTANT ALTERNATOR, PROVIDED AS RETROFIT MODIFICATION KITS FOR THE ACV FAMILY OF VEHICLES IN SUPPORT OF SUSTAINMENT AND RELIABILITY EFFORTS.
Mar 10, 2026P00230$0THE PURPOSE OF THIS MEMORANDUM IS TO DOCUMENT A BILATERAL MODIFICATION TO RECORD THE MUTUAL AGREEMENT OF THE PARTIES AS TO THE TERMS AND CONDITIONS CONTAINED WITHIN ATTACHMENT 53, SECT G.27 CORROSION PREVENTION AND MITIGATION AGREEMENT.
Mar 10, 2026P00230$0THE PURPOSE OF THIS MEMORANDUM IS TO DOCUMENT A BILATERAL MODIFICATION TO RECORD THE MUTUAL AGREEMENT OF THE PARTIES AS TO THE TERMS AND CONDITIONS CONTAINED WITHIN ATTACHMENT 53, SECT G.27 CORROSION PREVENTION AND MITIGATION AGREEMENT.
Mar 10, 2026P00230$0THE PURPOSE OF THIS MEMORANDUM IS TO DOCUMENT A BILATERAL MODIFICATION TO RECORD THE MUTUAL AGREEMENT OF THE PARTIES AS TO THE TERMS AND CONDITIONS CONTAINED WITHIN ATTACHMENT 53, SECT G.27 CORROSION PREVENTION AND MITIGATION AGREEMENT.
Mar 10, 2026P00231$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
Mar 10, 2026P00231$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
Mar 10, 2026P00231$0ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS.
Mar 10, 2026P00232$0THE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO INCORPORATE ATTACHMENT 27.5, HEXAVALENT CHROMIUM AND CADMIUM ACV-R PRTVS WAIVER, ATTACHMENT 27.5A, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.5B, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.6, HC MECH FASTENERS ACV-30 PRTVS WAIVER, AND EXTEND CLIN 2009 POP.
Mar 10, 2026P00232$0THE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO INCORPORATE ATTACHMENT 27.5, HEXAVALENT CHROMIUM AND CADMIUM ACV-R PRTVS WAIVER, ATTACHMENT 27.5A, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.5B, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.6, HC MECH FASTENERS ACV-30 PRTVS WAIVER, AND EXTEND CLIN 2009 POP.
Mar 10, 2026P00232$0THE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO INCORPORATE ATTACHMENT 27.5, HEXAVALENT CHROMIUM AND CADMIUM ACV-R PRTVS WAIVER, ATTACHMENT 27.5A, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.5B, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.6, HC MECH FASTENERS ACV-30 PRTVS WAIVER, AND EXTEND CLIN 2009 POP.
Mar 10, 2026P00233$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR BY UPDATING ATTACHMENT 50 SECTION D PACKAGING AND MARKING TO INSERT MISSING VEHICLE NUMBERS 689340-689490 FOR ACV-30 FRP LOTS 5-6.
Mar 10, 2026P00233$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR BY UPDATING ATTACHMENT 50 SECTION D PACKAGING AND MARKING TO INSERT MISSING VEHICLE NUMBERS 689340-689490 FOR ACV-30 FRP LOTS 5-6.
Mar 10, 2026P00233$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR BY UPDATING ATTACHMENT 50 SECTION D PACKAGING AND MARKING TO INSERT MISSING VEHICLE NUMBERS 689340-689490 FOR ACV-30 FRP LOTS 5-6.
Mar 10, 2026P00234$0THIS PURPOSE OF THIS BILATERAL MODIFICATION (P00234) IS TO UPDATE ATTACHMENT 10.2, SCHEDULED GFP (SGFP) LIST, ATTACHMENT 20, ACV CONFIGURATION MANAGEMENT PLAN, AND ATTACHMENT 53, SECTION G ADMINISTRATION.
Mar 10, 2026P00234$0THIS PURPOSE OF THIS BILATERAL MODIFICATION (P00234) IS TO UPDATE ATTACHMENT 10.2, SCHEDULED GFP (SGFP) LIST, ATTACHMENT 20, ACV CONFIGURATION MANAGEMENT PLAN, AND ATTACHMENT 53, SECTION G ADMINISTRATION.
Mar 10, 2026P00234$0THIS PURPOSE OF THIS BILATERAL MODIFICATION (P00234) IS TO UPDATE ATTACHMENT 10.2, SCHEDULED GFP (SGFP) LIST, ATTACHMENT 20, ACV CONFIGURATION MANAGEMENT PLAN, AND ATTACHMENT 53, SECTION G ADMINISTRATION.
Mar 10, 2026P00235$0THIS PURPOSE OF THIS BILATERALLY MOD IS TO RECORD THE MUTUAL SETTLEMENT AGREEMENT BETWEEN BAE AND THE GOVERNMENT TO RESOLVE THE CLAIMS AND ISSUES RAISED BY BAE.
Mar 10, 2026P00235$0THIS PURPOSE OF THIS BILATERALLY MOD IS TO RECORD THE MUTUAL SETTLEMENT AGREEMENT BETWEEN BAE AND THE GOVERNMENT TO RESOLVE THE REA.
Mar 10, 2026P00235$0THIS PURPOSE OF THIS BILATERALLY MOD IS TO RECORD THE MUTUAL SETTLEMENT AGREEMENT BETWEEN BAE AND THE GOVERNMENT TO RESOLVE THE CLAIMS AND ISSUES RAISED BY BAE.
Mar 10, 2026P00236$0THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO DOCUMENT THE FILE FOR THE INCORPORATION OF VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION NO. 30 REVISION 1, FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM (FRACAS) SUSTAINMENT.
Mar 10, 2026P00236$554.3KTHE PURPOSE OF THIS BILATERAL MODIFICATION IS TO DOCUMENT THE FILE FOR THE INCORPORATION OF VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION NO. 30 REVISION 1, FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM (FRACAS) SUSTAINMENT.
Mar 10, 2026P00236$0THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO DOCUMENT THE FILE FOR THE INCORPORATION OF VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION NO. 30 REVISION 1, FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM (FRACAS) SUSTAINMENT.
Mar 10, 2026P00237$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION (TI) NO. 23 REVISION 2, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES
Mar 10, 2026P00237$833.0KINCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION (TI) NO. 23 REVISION 2, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES
Mar 10, 2026P00237$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION (TI) NO. 23 REVISION 2, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES
Mar 10, 2026P00238$0PROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
Mar 10, 2026P00238$134.6KPROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
Mar 10, 2026P00238$0PROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R.
Jan 8, 2026P00225$0INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6B IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6
Jan 8, 2026P00225$0INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6B IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6
Jan 8, 2026P00225$4.2MINCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6B IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6
Dec 22, 2025P00224$0INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6A IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND VARIOUS ADMINISTRATIVE CHANGES
Dec 22, 2025P00224$0INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6A IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND VARIOUS ADMINISTRATIVE CHANGES
Dec 22, 2025P00224$3.7MINCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6A IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND VARIOUS ADMINISTRATIVE CHANGES
Dec 18, 2025P00223$0FRP LOT 6B OPTION EXERCISE
Dec 18, 2025P00223$0FRP LOT 6B OPTION EXERCISE
Dec 18, 2025P00223$195.1MFRP LOT 6B OPTION EXERCISE
Dec 10, 2025P00222$0THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE COMPLETE SETTLEMENT AGREEMENT BETWEEN THE PARTIES AS TO MATTERS DISCUSSED IN, AND DESCRIBED BY, SECTION G.26 CONSIDERATION AGREEMENT FOR NON-CONFORMING PAINT.
Dec 10, 2025P00222$0THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE COMPLETE SETTLEMENT AGREEMENT BETWEEN THE PARTIES AS TO MATTERS DISCUSSED IN, AND DESCRIBED BY, SECTION G.26 CONSIDERATION AGREEMENT FOR NON-CONFORMING PAINT.
Dec 10, 2025P00222$0THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE COMPLETE SETTLEMENT AGREEMENT BETWEEN THE PARTIES AS TO MATTERS DISCUSSED IN, AND DESCRIBED BY, SECTION G.26 CONSIDERATION AGREEMENT FOR NON-CONFORMING PAINT.
Dec 1, 2025P00221$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 6A SLINS 7501AA, 7501AD, 7502AA, 7503AA, 7502AD, AND 7504AA, CHANGE THE PSC CODE FOR SLIN 7501AD, AND UPDATE ATTACHMENT 10.2, SCHEDULED GOVERNMENT FURNISHED PROPERTY (SGFP) LIST.
Dec 1, 2025P00221$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 6A SLINS 7501AA, 7501AD, 7502AA, 7503AA, 7502AD, AND 7504AA, CHANGE THE PSC CODE FOR SLIN 7501AD, AND UPDATE ATTACHMENT 10.2, SCHEDULED GOVERNMENT FURNISHED PROPERTY (SGFP) LIST.
Dec 1, 2025P00221$184.4MTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 6A SLINS 7501AA, 7501AD, 7502AA, 7503AA, 7502AD, AND 7504AA, CHANGE THE PSC CODE FOR SLIN 7501AD, AND UPDATE ATTACHMENT 10.2, SCHEDULED GOVERNMENT FURNISHED PROPERTY (SGFP) LIST.
Sep 10, 2025P00220$0PRODUCTION IMPLEMENTATION OF ECP 0071, HATCH PROXIMITY SENSORS AND RAMP RELIABILITY IMPROVEMENTS (RETROFIT KITS/SPARES) TASK INSTRUCTION NO. 25 AND ADD FUNDING FOR FRP LOT 5C HEDGE LOCK.
Sep 10, 2025P00220$766.4KPRODUCTION IMPLEMENTATION OF ECP 0071, HATCH PROXIMITY SENSORS AND RAMP RELIABILITY IMPROVEMENTS (RETROFIT KITS/SPARES) AND TASK INSTRUCTION NO. 25.
Sep 10, 2025P00220$7.6MPRODUCTION IMPLEMENTATION OF ECP 0071, HATCH PROXIMITY SENSORS AND RAMP RELIABILITY IMPROVEMENTS (RETROFIT KITS/SPARES) TASK INSTRUCTION NO. 25 AND ADD FUNDING FOR FRP LOT 5C HEDGE LOCK.
Sep 2, 2025P00219$0FSR SUPPORT FOR 11TH MEU
Sep 2, 2025P00219$47.4KFSR SUPPORT FOR 11TH MEU
Sep 2, 2025P00219$264.4KFSR SUPPORT FOR 11TH MEU
Aug 26, 2025P00218$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES.
Aug 26, 2025P00218$472.1KINCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES.
Aug 26, 2025P00218$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES.
Aug 21, 2025P00217$0FUNDING FOR TI 30 FACARS SUSTAINMENT.
Aug 21, 2025P00217$543.4KFUNDING FOR TI 30 FACARS SUSTAINMENT.
Aug 21, 2025P00217$0FUNDING FOR TI 30 FACARS SUSTAINMENT.
Jul 31, 2025P00216$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 5C SLINS 7301AC, 7302AC, 7303AC, AND 7304AC PURSUANT TO FAR CLAUSE 52.217-7, OPTION FOR INCREASED QUANTITY, SEPARATELY PRICED LINE ITEM AND ADJUST THE QUANTITY FOR SLIN 7301AC FROM 30 TO 31.
Jul 31, 2025P00216$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 5C SLINS 7301AC, 7302AC, 7303AC, AND 7304AC PURSUANT TO FAR CLAUSE 52.217-7, OPTION FOR INCREASED QUANTITY, SEPARATELY PRICED LINE ITEM AND ADJUST THE QUANTITY FOR SLIN 7301AC FROM 30 TO 31.
Jul 31, 2025P00216$181.1MTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 5C SLINS 7301AC, 7302AC, 7303AC, AND 7304AC PURSUANT TO FAR CLAUSE 52.217-7, OPTION FOR INCREASED QUANTITY, SEPARATELY PRICED LINE ITEM AND ADJUST THE QUANTITY FOR SLIN 7301AC FROM 30 TO 31.
Jul 23, 2025P00215$0BILATERAL MODIFICATION TO UPDATE CLINS 8103, 8104, AND 8105 TO CPFF COMPLETION, DEOBLIGATE $1,311,800.00 OFF OF CLIN 8105, AND UPDATE ATTACHMENTS 2, 10.2, AND 33.
Jul 23, 2025P00215$-1.3MBILATERAL MODIFICATION TO UPDATE CLINS 8103, 8104, AND 8105 TO CPFF COMPLETION, DEOBLIGATE $1,311,800.00 OFF OF CLIN 8105, AND UPDATE ATTACHMENTS 2, 10.2, AND 33.
Jul 23, 2025P00215$0BILATERAL MODIFICATION TO UPDATE CLINS 8103, 8104, AND 8105 TO CPFF COMPLETION, DEOBLIGATE $1,311,800.00 OFF OF CLIN 8105, AND UPDATE ATTACHMENTS 2, 10.2, AND 33.
Jun 3, 2025P00214$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE SECTION G.25, ACV PROPELLER SHAFT ASSEMBLY, TO MEMORIALIZE THE AGREEMENT BETWEEN BAE AND THE GOVERNMENT FOR PROPELLER SHAFT ASSEMBLY.
Jun 3, 2025P00214$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE SECTION G.25, ACV PROPELLER SHAFT ASSEMBLY, TO MEMORIALIZE THE AGREEMENT BETWEEN BAE AND THE GOVERNMENT FOR PROPELLER SHAFT ASSEMBLY.
Jun 3, 2025P00214$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE SECTION G.25, ACV PROPELLER SHAFT ASSEMBLY, TO MEMORIALIZE THE AGREEMENT BETWEEN BAE AND THE GOVERNMENT FOR PROPELLER SHAFT ASSEMBLY.
May 30, 2025P00213$0THIS MOD IS TO DOCUMENT THE INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5B IN ACCORDANCE WITH SECTION G.14, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND TO INCREMENTALLY FUND CLIN 8201, ACV-R MRV, AND CLIN 8203, ACV-R TEST SUPPORT
May 30, 2025P00213$15.2MTHE PURPOSE OF THIS MOD IS TO INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5B IN ACCORDANCE WITH SECTION G.14, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND TO INCREMENTALLY FUND CLIN 8201, ACV-R MRV PHASE 2, AND CLIN 8203, ACV-R PHASE 2
May 30, 2025P00213$2.7MTHIS MOD IS TO DOCUMENT THE INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5B IN ACCORDANCE WITH SECTION G.14, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND TO INCREMENTALLY FUND CLIN 8201, ACV-R MRV, AND CLIN 8203, ACV-R TEST SUPPORT
May 21, 2025P00212$0UPDATED ATTACHMENT 05, ACV FOV IMP, AND ATTACHMENT 27 AAA FRM-02002 -V.3 - CONTRACTOR REQUEST FOR USE OF PROHIBITED MATERIALS, AND INCORPORATE ATTACHMENT 27.4, HC MECH FASTENERS ACV-30 PRTVS.
May 21, 2025P00212$0UPDATED ATTACHMENT 05, ACV FOV IMP, AND ATTACHMENT 27 AAA FRM-02002 -V.3 - CONTRACTOR REQUEST FOR USE OF PROHIBITED MATERIALS, AND INCORPORATE ATTACHMENT 27.4, HC MECH FASTENERS ACV-30 PRTVS.
May 21, 2025P00212$0UPDATED ATTACHMENT 05, ACV FOV IMP, AND ATTACHMENT 27 AAA FRM-02002 -V.3 - CONTRACTOR REQUEST FOR USE OF PROHIBITED MATERIALS, AND INCORPORATE ATTACHMENT 27.4, HC MECH FASTENERS ACV-30 PRTVS.
May 1, 2025P00211$0FRP LOT 5B OPTION EXERCISE
May 1, 2025P00211$0FRP LOT 5B OPTION EXERCISE
May 1, 2025P00211$172.3MFRP LOT 5B OPTION EXERCISE
Apr 18, 2025P00210$0INCORPORATE FUNDING FOR THE FIELD SERVICE REPRESENTATIVE (FSR) GAP BETWEEN FULL RATE PRODUCTION (FRP) LOTS 4B AND 5A FOR CLIN 7203, FIELDING AND SUPPORT COSTS FRP LOT 4, FOR CAMP PENDLETON, CAMP LEJEUNE, AND OKINAWA
Apr 18, 2025P00210$0INCORPORATE FUNDING FOR THE FIELD SERVICE REPRESENTATIVE (FSR) GAP BETWEEN FULL RATE PRODUCTION (FRP) LOTS 4B AND 5A FOR CLIN 7203, FIELDING AND SUPPORT COSTS FRP LOT 4, FOR CAMP PENDLETON, CAMP LEJEUNE, AND OKINAWA
Apr 18, 2025P00210$2.0MINCORPORATE FUNDING FOR THE FIELD SERVICE REPRESENTATIVE (FSR) GAP BETWEEN FULL RATE PRODUCTION (FRP) LOTS 4B AND 5A FOR CLIN 7203, FIELDING AND SUPPORT COSTS FRP LOT 4, FOR CAMP PENDLETON, CAMP LEJEUNE, AND OKINAWA
Mar 31, 2025P00209$0INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5A AND TO UPDATE FAR 52.216-16, INCENTIVE PRICE REVISION-FIRM TARGET, FROM "BY REFERENCE" TO "BY FULL TEXT"
Mar 31, 2025P00209$0INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5A AND TO UPDATE FAR 52.216-16, INCENTIVE PRICE REVISION-FIRM TARGET, FROM "BY REFERENCE" TO "BY FULL TEXT"
Mar 31, 2025P00209$-423.5KINCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5A AND TO UPDATE FAR 52.216-16, INCENTIVE PRICE REVISION-FIRM TARGET, FROM "BY REFERENCE" TO "BY FULL TEXT"
Mar 18, 2025P00208$0THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THIS NO-COST BILATERAL MODIFICATION P00208 FOR CONTRACT M67854-16-C-0006 IS TO UPDATE SECTION I, CONTRACT CLAUSES, TO REMOVE FAR 52.222-21, PROHIBITION OF SEGREGATED FACILITIES, AND FAR 52.222-26, EQUAL OPPORTUNITY.
Mar 18, 2025P00208$0THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THIS NO-COST BILATERAL MODIFICATION P00208 FOR CONTRACT M67854-16-C-0006 IS TO UPDATE SECTION I, CONTRACT CLAUSES, TO REMOVE FAR 52.222-21, PROHIBITION OF SEGREGATED FACILITIES, AND FAR 52.222-26, EQUAL OPPORTUNITY.
Mar 18, 2025P00208$0THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THIS NO-COST BILATERAL MODIFICATION P00208 FOR CONTRACT M67854-16-C-0006 IS TO UPDATE SECTION I, CONTRACT CLAUSES, TO REMOVE FAR 52.222-21, PROHIBITION OF SEGREGATED FACILITIES, AND FAR 52.222-26, EQUAL OPPORTUNITY.
Mar 14, 2025P00207$0ACV-30 FRP LOTS 5-6 (EXERCISE CLINS FOR FRP LOT 5A)
Mar 14, 2025P00207$6.7MACV-30 FRP LOTS 5-6 (EXERCISE CLINS FOR FRP LOT 5A)
Mar 14, 2025P00207$181.8MACV-30 FRP LOTS 5-6 (EXERCISE CLINS FOR FRP LOT 5A)
Mar 3, 2025P00206$0INCREMENTALLY FUND CLIN 8103, ACV-30 PRODUCTION READINESS TEST VEHICLES (PRTV) DESIGN AND DEVELOPMENT PHASE 4
Mar 3, 2025P00206$386.3KINCREMENTALLY FUND CLIN 8103, ACV-30 PRODUCTION READINESS TEST VEHICLES (PRTV) DESIGN AND DEVELOPMENT PHASE 4
Mar 3, 2025P00206$0INCREMENTALLY FUND CLIN 8103, ACV-30 PRODUCTION READINESS TEST VEHICLES (PRTV) DESIGN AND DEVELOPMENT PHASE 4
Jan 31, 2025P00205$0UPDATE THE VALUE AND FUNDING FOR CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR NRE COSTS FOR ECP 65 DESIGN EFFORT, AND INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
Jan 31, 2025P00205$2.9MUPDATE THE VALUE AND FUNDING FOR CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR NRE COSTS FOR ECP 65 DESIGN EFFORT, AND INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
Jan 31, 2025P00205$0UPDATE THE VALUE AND FUNDING FOR CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR NRE COSTS FOR ECP 65 DESIGN EFFORT, AND INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
Dec 20, 2024P00204$0INCREMENTALLY FUNDING CLINS 8201 AND 8203
Dec 20, 2024P00204$5.1MINCREMENTALLY FUND CLINS 8201 AND 8203
Dec 20, 2024P00204$0INCREMENTALLY FUND CLINS 8201 AND 8203
Nov 13, 2024P00203$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR ACV-30 DRAWINGS UPDATE FOR FULL RATE PRODUCTION (FRP) LOTS 5-6, TASK INSTRUCTION (TI) NO. 29 EXTEND THE PERIOD OF PERFORMANCE (POP) ON CLINS 6203AB, FSR 15TH MEU: 1ST FIELD SERVICE REPRESENTATIVE (FSR) DEPLOYMENT, AND 6203AE, FSR 15TH MEU: 2ND FSR DEPLOYMENT AND UPDATE ATTACHMENTS 16, 16.1, AND 16.2, TECHNICAL MANUAL CONTRACT REQUIREMENT (TMCR)
Nov 13, 2024P00203$1.1MINCORPORATE VALUE AND FUNDING UNDER CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR ACV-30 DRAWINGS UPDATE FOR FULL RATE PRODUCTION (FRP) LOTS 5-6, TASK INSTRUCTION (TI) NO. 29 EXTEND THE PERIOD OF PERFORMANCE (POP) ON CLINS 6203AB, FSR 15TH MEU: 1ST FIELD SERVICE REPRESENTATIVE (FSR) DEPLOYMENT, AND 6203AE, FSR 15TH MEU: 2ND FSR DEPLOYMENT AND UPDATE ATTACHMENTS 16, 16.1, AND 16.2, TECHNICAL MANUAL CONTRACT REQUIREMENT (TMCR)
Nov 13, 2024P00203$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR ACV-30 DRAWINGS UPDATE FOR FULL RATE PRODUCTION (FRP) LOTS 5-6, TASK INSTRUCTION (TI) NO. 29 EXTEND THE PERIOD OF PERFORMANCE (POP) ON CLINS 6203AB, FSR 15TH MEU: 1ST FIELD SERVICE REPRESENTATIVE (FSR) DEPLOYMENT, AND 6203AE, FSR 15TH MEU: 2ND FSR DEPLOYMENT AND UPDATE ATTACHMENTS 16, 16.1, AND 16.2, TECHNICAL MANUAL CONTRACT REQUIREMENT (TMCR)
Sep 25, 2024P00202$0INCORPORATE INCREMENTAL FUNDING FOR CLIN 8201, ACV-R POST-CDR DESIGN AND DEVELOPMENT (PHASE 2), AND TO UPDATE DFARS 252.232-7006, WIDE AREA WORKFLOW (WAWF) PAYMENT INSTRUCTIONS.
Sep 25, 2024P00202$256.3KINCORPORATE INCREMENTAL FUNDING FOR CLIN 8201, ACV-R POST-CDR DESIGN AND DEVELOPMENT (PHASE 2), AND TO UPDATE DFARS 252.232-7006, WIDE AREA WORKFLOW (WAWF) PAYMENT INSTRUCTIONS.
Sep 25, 2024P00202$0INCORPORATE INCREMENTAL FUNDING FOR CLIN 8201, ACV-R POST-CDR DESIGN AND DEVELOPMENT (PHASE 2), AND TO UPDATE DFARS 252.232-7006, WIDE AREA WORKFLOW (WAWF) PAYMENT INSTRUCTIONS.
Sep 4, 2024P00201$0UPDATE ATTACHMENT 11, COVER SHEET FOR TEST SCHEDULES AND TEST LOCATIONS, AND ATTACHMENT 11.2, ACV-30 MISSION ROLE VARIANT (MRV) TEST SCHEDULES AND TEST LOCATIONS DRAFT, TO REFLECT REVISED DATES AND SCHEDULE UPDATES.
Sep 4, 2024P00201$0UPDATE ATTACHMENT 11, COVER SHEET FOR TEST SCHEDULES AND TEST LOCATIONS, AND ATTACHMENT 11.2, ACV-30 MISSION ROLE VARIANT (MRV) TEST SCHEDULES AND TEST LOCATIONS DRAFT, TO REFLECT REVISED DATES AND SCHEDULE UPDATES.
Sep 4, 2024P00201$0UPDATE ATTACHMENT 11, COVER SHEET FOR TEST SCHEDULES AND TEST LOCATIONS, AND ATTACHMENT 11.2, ACV-30 MISSION ROLE VARIANT (MRV) TEST SCHEDULES AND TEST LOCATIONS DRAFT, TO REFLECT REVISED DATES AND SCHEDULE UPDATES.
Aug 23, 2024P00200$0UPDATE SECTION D, PACKAGING AND MARKING, AMPHIBIOUS COMBAT VEHICLE PERSONNEL (ACV-P) LOW RATE INITIAL PRODUCTION (LRIP) AND FULL RATE PRODUCTION (FRP) VEHICLE MARKING, TO CORRECT FRP LOT 2A SERIAL NUMBERS
Aug 23, 2024P00200$0UPDATE SECTION D, PACKAGING AND MARKING, AMPHIBIOUS COMBAT VEHICLE PERSONNEL (ACV-P) LOW RATE INITIAL PRODUCTION (LRIP) AND FULL RATE PRODUCTION (FRP) VEHICLE MARKING, TO CORRECT FRP LOT 2A SERIAL NUMBERS
Aug 23, 2024P00200$0UPDATE SECTION D, PACKAGING AND MARKING, AMPHIBIOUS COMBAT VEHICLE PERSONNEL (ACV-P) LOW RATE INITIAL PRODUCTION (LRIP) AND FULL RATE PRODUCTION (FRP) VEHICLE MARKING, TO CORRECT FRP LOT 2A SERIAL NUMBERS
Aug 15, 2024P00199$0INCORPORATE, FUND, AND EXERCISE CLIN 2011, NIWC FSR SUPPORT, TO COVER FSR SUPPORT AT THE NAVAL INFORMATION WARFARE CENTER (NIWC)
Aug 15, 2024P00199$60.0KINCORPORATE, FUND, AND EXERCISE CLIN 2011, NIWC FSR SUPPORT, TO COVER FSR SUPPORT AT THE NAVAL INFORMATION WARFARE CENTER (NIWC)
Aug 15, 2024P00199$0INCORPORATE, FUND, AND EXERCISE CLIN 2011, NIWC FSR SUPPORT, TO COVER FSR SUPPORT AT THE NAVAL INFORMATION WARFARE CENTER (NIWC)
Jul 31, 2024P00198$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2010 FOR FIELD SERVICE REPRESENTATIVE (FSR) SUPPORT AT NAVAL INFORMATION WARFARE CENTER (NIWC) AND INCREMENTALLY FUND CLIN 8201, ACV-R POST-CRITICAL DESIGN REVIEW (CDR) DESIGN AND DEVELOPMENT (PHASE 2)
Jul 31, 2024P00198$2.5MINCORPORATE VALUE AND FUNDING UNDER CLIN 2010 FOR FIELD SERVICE REPRESENTATIVE (FSR) SUPPORT AT NAVAL INFORMATION WARFARE CENTER (NIWC) AND INCREMENTALLY FUND CLIN 8201, ACV-R POST-CRITICAL DESIGN REVIEW (CDR) DESIGN AND DEVELOPMENT (PHASE 2)
Jul 31, 2024P00198$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2010 FOR FIELD SERVICE REPRESENTATIVE (FSR) SUPPORT AT NAVAL INFORMATION WARFARE CENTER (NIWC) AND INCREMENTALLY FUND CLIN 8201, ACV-R POST-CRITICAL DESIGN REVIEW (CDR) DESIGN AND DEVELOPMENT (PHASE 2)
Jul 12, 2024P00197$0BILATERAL MODIFICATION TO INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES
Jul 12, 2024P00197$1.0MINCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES
Jul 12, 2024P00197$0BILATERAL MODIFICATION TO INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES
Jul 3, 2024A00001$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE ADMIN OFFICE AND PAY OFFICE ON MODS ARZ993 AND P00194.
Jul 3, 2024A00002$0THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE QUANTITY, UNIT OF ISSUE, UNIT PRICE FOR CLIN 3005
Jul 3, 2024P00196$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING EFFORT FOR TASK INSTRUCTION NO. 28 FOR FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM SUSTAINMENT.
Jul 3, 2024P00196$533.1KINCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING EFFORT FOR TASK INSTRUCTION NO. 28 FOR FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM SUSTAINMENT.
Jul 3, 2024P00196$0INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING EFFORT FOR TASK INSTRUCTION NO. 28 FOR FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM SUSTAINMENT.
Jun 28, 2024P00195$0CHANGE STRUCTURE OF SLINS UNDER CLIN 6203, FSR SUPPORT FOR THE 15TH MEU AND INCREMENTALLY FUND CLINS 8103, ACV-30 PRTV DESIGN AND DEVELOPMENT PHASE 4 AND 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
Jun 28, 2024P00195$5.4MCHANGE STRUCTURE OF SLINS UNDER CLIN 6203, FSR SUPPORT FOR THE 15TH MEU AND INCREMENTALLY FUND CLINS 8103, ACV-30 PRTV DESIGN AND DEVELOPMENT PHASE 4 AND 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
Jun 28, 2024P00195$0CHANGE STRUCTURE OF SLINS UNDER CLIN 6203, FSR SUPPORT FOR THE 15TH MEU AND INCREMENTALLY FUND CLINS 8103, ACV-30 PRTV DESIGN AND DEVELOPMENT PHASE 4 AND 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
Jun 20, 2024P00194$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE HEDGE LOCK RATE FOR FRP LOTS 4A AND 4B TWO YEARS IIP SPARES AND TO FIX ADMINISTRATIVE ERROR ON ATTACHMENT 33.
Jun 20, 2024P00194$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE HEDGE LOCK RATE FOR FRP LOTS 4A AND 4B TWO YEARS IIP SPARES AND TO FIX ADMINISTRATIVE ERROR ON ATTACHMENT 33.
Jun 20, 2024P00194$-342.7KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE HEDGE LOCK RATE FOR FRP LOTS 4A AND 4B TWO YEARS IIP SPARES AND TO FIX ADMINISTRATIVE ERROR ON ATTACHMENT 33.
May 23, 2024P00193$0INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
May 23, 2024P00193$2.1MINCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
May 23, 2024P00193$0INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4
May 20, 2024P00192$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE AND FUND CLIN 7204AA AND 7204AB TWO YEARS INITIAL ISSUE PROVISIONING SPARES.
May 20, 2024P00192$46.4KTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE AND FUND CLIN 7204AA AND 7204AB TWO YEARS INITIAL ISSUE PROVISIONING SPARES.
May 20, 2024P00192$6.8MTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE AND FUND CLIN 7204AA AND 7204AB TWO YEARS INITIAL ISSUE PROVISIONING SPARES.
Apr 25, 2024P00191$0THE PURPOSE OF THIS MODIFICATION IS TO PERFORM THE HEDGE LOCK FOR LOT 4B AND UPDATE SECTION J ATTACHMENTS.
Apr 25, 2024P00191$0THE PURPOSE OF THIS MODIFICATION IS TO PERFORM THE HEDGE LOCK FOR LOT 4B AND UPDATE SECTION J ATTACHMENTS.
Apr 25, 2024P00191$-6.1MTHE PURPOSE OF THIS MODIFICATION IS TO PERFORM THE HEDGE LOCK FOR LOT 4B AND UPDATE SECTION J ATTACHMENTS.
Apr 4, 2024P00190$0ACV-R PHASE 2 FOR PRTVS
Apr 4, 2024P00190$52.1MACV-R PHASE 2 FOR PRTVS
Apr 4, 2024P00190$0ACV-R PHASE 2 FOR PRTVS
Mar 28, 2024P00189$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 4B SLIN 7201AD FOR M67854-16-C-0006 P00189.
Mar 28, 2024P00189$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 4B SLIN 7201AD FOR M67854-16-C-0006 P00189.
Mar 28, 2024P00189$25.7MTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 4B SLIN 7201AD FOR M67854-16-C-0006 P00189.
Mar 14, 2024P00188$0THE PURPOSE OF THIS MOD IS TO DOCUMENT THE FILE FOR THE BILATERAL EXERCISE OF OPTION SLINS 6203AB AND 6203AE, FSR SUPPORT FOR THE 15TH MEU, PURSUANT TO FAR CLAUSE 52.217-7 AND TO INCORPORATE DFARS CLAUSE 252.245-7005.
Mar 14, 2024P00188$0THE PURPOSE OF THIS MOD IS TO DOCUMENT THE FILE FOR THE BILATERAL EXERCISE OF OPTION SLINS 6203AB AND 6203AE, FSR SUPPORT FOR THE 15TH MEU, PURSUANT TO FAR CLAUSE 52.217-7 AND TO INCORPORATE DFARS CLAUSE 252.245-7005.
Mar 14, 2024P00188$775.8KTHE PURPOSE OF THIS MOD IS TO DOCUMENT THE FILE FOR THE BILATERAL EXERCISE OF OPTION SLINS 6203AB AND 6203AE, FSR SUPPORT FOR THE 15TH MEU, PURSUANT TO FAR CLAUSE 52.217-7 AND TO INCORPORATE DFARS CLAUSE 252.245-7005.
Mar 6, 2024P00187$0FRP LOT 4B OPTION EXERCISE
Mar 6, 2024P00187$0FRP LOT 4B OPTION EXERCISE
Mar 6, 2024P00187$181.9MFRP LOT 4B OPTION EXERCISE
Feb 20, 2024P00186$0PROCURING ACV-30 TURRET SPARE PARTS FOR TEST SUPPORT.
Feb 20, 2024P00186$1.8MPROCURING ACV-30 TURRET SPARE PARTS FOR TEST SUPPORT.
Feb 20, 2024P00186$0PROCURING ACV-30 TURRET SPARE PARTS FOR TEST SUPPORT.
Nov 21, 2023P00185$0ACV-R CDR DRAWINGS, FUNDING FOR TEST SUPPORT COST OVERRUN, AND HEDGE LOCK FOR FRP LOT 4A
Nov 21, 2023P00185$3.8MACV-R CDR DRAWINGS, FUNDING FOR TEST SUPPORT COST OVERRUN, AND HEDGE LOCK FOR FRP LOT 4A
Nov 21, 2023P00185$-7.5MACV-R CDR DRAWINGS, FUNDING FOR TEST SUPPORT COST OVERRUN, AND HEDGE LOCK FOR FRP LOT 4A
Nov 17, 2023P00184$0INCREMENTALLY FUND CLINS 8103 AND 8105
Nov 17, 2023P00184$4.9MINCREMENTALLY FUND CLINS 8103 AND 8105
Nov 17, 2023P00184$0INCREMENTALLY FUND CLINS 8103 AND 8105
Nov 3, 2023P00183$0FRP LOT 4A OPTION EXERCISE
Nov 3, 2023P00183$0FRP LOT 4A OPTION EXERCISE
Nov 3, 2023P00183$211.5MFRP LOT 4A OPTION EXERCISE
Oct 31, 2023P00182$0FIVE ENGINEERING CHANGE PROPOSALS (ECPS) (C003 ANTENNA MOUNT TO REDESIGN, C004 RELOCATED MULTIPLE ITEMS, C013 ADD GLOBAL POSITIONING SYSTEM (GPS) (ROCTEC) PASS THRU BLOCKS, C015 SHIELD THE EMERGENCY EGRESS LIGHTING SYSTEM (EELS) CAPACITOR, AND C016 PART B M240 WEAPON MECHANICAL INTEGRATION INSTALLATION) INTO FRP LOT 2C (14 ACV-C VEHICLES), FRP LOT 3C (17 ACV-C VEHICLES), AND PRODUCTION READINESS TEST VEHICLES (PRTVS) (2 ACV-C VEHICLES), 2) INCORPORATE UPDATED ATTACHMENT 10.2, SCHEDULED GFP (SGFP) REPORT, ATTACHMENT 27, REQUEST FOR USE OF PROHIBITED MATERIALS, INCORPORATE ATTACHMENT 27.3, HEXAVALENT CHROMIUM AND CADMIUM WAIVER, 3) REALIGN $1M FROM CLIN 8103 TO CLIN 8105, AND 4) INCORPORATE FAR CLAUSE 52.204-27, PROHIBITION ON A BYTEDANCE COVERED APPLICATION
Oct 31, 2023P00182$93.0KFIVE ENGINEERING CHANGE PROPOSALS (ECPS) (C003 ANTENNA MOUNT TO REDESIGN, C004 RELOCATED MULTIPLE ITEMS, C013 ADD GLOBAL POSITIONING SYSTEM (GPS) (ROCTEC) PASS THRU BLOCKS, C015 SHIELD THE EMERGENCY EGRESS LIGHTING SYSTEM (EELS) CAPACITOR, AND C016 PART B M240 WEAPON MECHANICAL INTEGRATION INSTALLATION) INTO FRP LOT 2C (14 ACV-C VEHICLES), FRP LOT 3C (17 ACV-C VEHICLES), AND PRODUCTION READINESS TEST VEHICLES (PRTVS) (2 ACV-C VEHICLES), 2) INCORPORATE UPDATED ATTACHMENT 10.2, SCHEDULED GFP (SGFP) REPORT, ATTACHMENT 27, REQUEST FOR USE OF PROHIBITED MATERIALS, INCORPORATE ATTACHMENT 27.3, HEXAVALENT CHROMIUM AND CADMIUM WAIVER, 3) REALIGN $1M FROM CLIN 8103 TO CLIN 8105, AND 4) INCORPORATE FAR CLAUSE 52.204-27, PROHIBITION ON A BYTEDANCE COVERED APPLICATION
Oct 31, 2023P00182$4.1MFIVE ENGINEERING CHANGE PROPOSALS (ECPS) (C003 ANTENNA MOUNT TO REDESIGN, C004 RELOCATED MULTIPLE ITEMS, C013 ADD GLOBAL POSITIONING SYSTEM (GPS) (ROCTEC) PASS THRU BLOCKS, C015 SHIELD THE EMERGENCY EGRESS LIGHTING SYSTEM (EELS) CAPACITOR, AND C016 PART B M240 WEAPON MECHANICAL INTEGRATION INSTALLATION) INTO FRP LOT 2C (14 ACV-C VEHICLES), FRP LOT 3C (17 ACV-C VEHICLES), AND PRODUCTION READINESS TEST VEHICLES (PRTVS) (2 ACV-C VEHICLES), 2) INCORPORATE UPDATED ATTACHMENT 10.2, SCHEDULED GFP (SGFP) REPORT, ATTACHMENT 27, REQUEST FOR USE OF PROHIBITED MATERIALS, INCORPORATE ATTACHMENT 27.3, HEXAVALENT CHROMIUM AND CADMIUM WAIVER, 3) REALIGN $1M FROM CLIN 8103 TO CLIN 8105, AND 4) INCORPORATE FAR CLAUSE 52.204-27, PROHIBITION ON A BYTEDANCE COVERED APPLICATION
Sep 28, 2023P00181$0ACV-R PHASE 2 MATERIAL DEVELOPMENT
Sep 28, 2023P00181$6.3MACV-R MISSION ROLE VARIANT (MRV) PHASE 2 MATERIAL DEVELOPMENT
Sep 28, 2023P00181$0ACV-R PHASE 2 MATERIAL DEVELOPMENT
Sep 25, 2023P00180$0ECP54 RETROFIT KITS/CLIN 6202 ADMIN UPDATES/SECTION D VEHICLE SERIAL NUMBER UPDATES
Sep 25, 2023P00180$13.3KECP54 RETROFIT KITS/CLIN 6202 ADMIN UPDATES/SECTION D VEHICLE SERIAL NUMBER UPDATES
Sep 25, 2023P00180$418.2KECP54 RETROFIT KITS/CLIN 6202 ADMIN UPDATES/SECTION D VEHICLE SERIAL NUMBER UPDATES
Sep 12, 2023P00179$0ECP54 RETROFIT CABLES
Sep 12, 2023P00179$102.3KECP54 RETROFIT CABLES
Sep 12, 2023P00179$1.6MECP54 RETROFIT CABLES
Aug 18, 2023P00178$0PROHIBITED MATERIAL CONSIDERATION
Aug 18, 2023P00178$0PROHIBITED MATERIAL CONSIDERATION
Aug 18, 2023P00178$0PROHIBITED MATERIAL CONSIDERATION
Aug 15, 2023P00177$0ACV-30 PHASE 4 DOCUMENTATION AND SUBJECT MATTER EXPERT SUPPORT FOR SAFETY MEETINGS.
Aug 15, 2023P00177$943.1KACV-30 PRTV DESIGN & DEVT PHASE 4 DOCUMENTATION AND SUBJECT MATTER EXPERT SUPPORT FOR SAFETY REVIEW MEETINGS.
Aug 15, 2023P00177$0ACV-30 PHASE 4 DOCUMENTATION AND SUBJECT MATTER EXPERT SUPPORT FOR SAFETY REVIEW MEETINGS.
Aug 2, 2023P00176$0ENGINEERING CHANGES AND ADMINISTRATIVE UPDATES
Aug 2, 2023P00176$1.2MENGINEERING CHANGES AND ADMINISTRATIVE UPDATES
Aug 2, 2023P00176$0ENGINEERING CHANGES AND ADMINISTRATIVE UPDATES
Jul 24, 2023P00175$0FULL RATE PRODUCTION - INCORPORATE SECTIONS G.21 AND G.22 FOR STRUT ASSEMBLY AND CASTLE RING INSPECTION AND REPAIRS ON VEHICLES.
Jul 24, 2023P00175$0ACV-30 PRTV DESIGN & DEVT PHASE 4
Jul 24, 2023P00175$0FULL RATE PRODUCTION - INCORPORATE SECTIONS G.21 AND G.22 FOR STRUT ASSEMBLY AND CASTLE RING INSPECTION AND REPAIRS ON VEHICLES.
Jul 12, 2023P00174$0FIELD SERVICE REPRESENTATIVE FOR THE 15TH MARINE EXPEDITIONARY UNIT.
Jul 12, 2023P00174$70.1KFIELD SERVICE REPRESENTATIVE SUPPORT FOR THE 15TH MARINE EXPEDITIONARY UNIT.
Jul 12, 2023P00174$689.1KFIELD SERVICE REPRESENTATIVE SUPPORT FOR THE 15TH MARINE EXPEDITIONARY UNIT.
Jun 9, 2023P00173$0REVISED QTY AND UNIT PRICE FOR CLIN 5005 ADMINISTRATIVE CORRECTION
Jun 9, 2023P00173$0REVISED QTY AND UNIT PRICE FOR CLIN 5005 ADMINISTRATIVE CORRECTION
Jun 9, 2023P00173$0REVISED QTY AND UNIT PRICE FOR CLIN 5005 ADMINISTRATIVE CORRECTION

Estimated positioning window

Jun 30, 2027 – Dec 30, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2028-06-30 (607 days from calculation)
+25 points
4 historical awards in this buyer and category group
+15 points
720 recorded award transactions
+10 points
Latest award action: 2026-03-12
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.