Federal contract award
M6785416C0006
IGF::OT::IGF
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | COMMANDER |
| NAICS | 336992 — Military Armored Vehicle, Tank, and Tank Component Manufacturing |
| PSC | 2355 — Combat, Assault, and Tactical Vehicles, Wheeled |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $408.8M |
| Current contract value | $446.3M |
| Potential contract value / ceiling | $456.9M |
| Start date | Nov 24, 2015 |
| Current end date | Jun 30, 2028 |
| Potential end date | Jun 30, 2028 |
| Latest award activity | Mar 12, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 720 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Mar 12, 2026 | P00227 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS. |
| Mar 10, 2026 | P00226 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS. |
| Mar 10, 2026 | P00226 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS. |
| Mar 10, 2026 | P00226 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS. |
| Mar 10, 2026 | P00227 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS. |
| Mar 10, 2026 | P00227 | $362.0K | ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS. |
| Mar 10, 2026 | P00228 | $0 | INCORPORATE THE REVISIONS FOR ATTACHMENTS 23, 25, 52, AND 53. |
| Mar 10, 2026 | P00228 | $0 | INCORPORATE THE REVISIONS FOR ATTACHMENTS 23, 25, 52, AND 53. |
| Mar 10, 2026 | P00228 | $0 | INCORPORATE THE REVISIONS FOR ATTACHMENTS 23, 25, 52, AND 53. |
| Mar 10, 2026 | P00229 | $0 | BILATERAL MODIFICATION FOR THE ENGINEERING CHANGE PROPOSAL 0072 - TASK INSTRUCTION 26, CORROSION RESISTANT ALTERNATOR, PROVIDED AS RETROFIT MODIFICATION KITS FOR THE ACV FAMILY OF VEHICLES IN SUPPORT OF SUSTAINMENT AND RELIABILITY EFFORTS. |
| Mar 10, 2026 | P00229 | $731.9K | BILATERAL MODIFICATION FOR THE ENGINEERING CHANGE PROPOSAL 0072 - TASK INSTRUCTION 26, CORROSION RESISTANT ALTERNATOR, PROVIDED AS RETROFIT MODIFICATION KITS FOR THE ACV FAMILY OF VEHICLES IN SUPPORT OF SUSTAINMENT AND RELIABILITY EFFORTS. |
| Mar 10, 2026 | P00229 | $0 | BILATERAL MODIFICATION FOR THE ENGINEERING CHANGE PROPOSAL 0072 - TASK INSTRUCTION 26, CORROSION RESISTANT ALTERNATOR, PROVIDED AS RETROFIT MODIFICATION KITS FOR THE ACV FAMILY OF VEHICLES IN SUPPORT OF SUSTAINMENT AND RELIABILITY EFFORTS. |
| Mar 10, 2026 | P00230 | $0 | THE PURPOSE OF THIS MEMORANDUM IS TO DOCUMENT A BILATERAL MODIFICATION TO RECORD THE MUTUAL AGREEMENT OF THE PARTIES AS TO THE TERMS AND CONDITIONS CONTAINED WITHIN ATTACHMENT 53, SECT G.27 CORROSION PREVENTION AND MITIGATION AGREEMENT. |
| Mar 10, 2026 | P00230 | $0 | THE PURPOSE OF THIS MEMORANDUM IS TO DOCUMENT A BILATERAL MODIFICATION TO RECORD THE MUTUAL AGREEMENT OF THE PARTIES AS TO THE TERMS AND CONDITIONS CONTAINED WITHIN ATTACHMENT 53, SECT G.27 CORROSION PREVENTION AND MITIGATION AGREEMENT. |
| Mar 10, 2026 | P00230 | $0 | THE PURPOSE OF THIS MEMORANDUM IS TO DOCUMENT A BILATERAL MODIFICATION TO RECORD THE MUTUAL AGREEMENT OF THE PARTIES AS TO THE TERMS AND CONDITIONS CONTAINED WITHIN ATTACHMENT 53, SECT G.27 CORROSION PREVENTION AND MITIGATION AGREEMENT. |
| Mar 10, 2026 | P00231 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS. |
| Mar 10, 2026 | P00231 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS. |
| Mar 10, 2026 | P00231 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT CONTRACT SECTIONS FORMATTING DUE TO CONTRACT MIGRATION FROM PD2 TO EPS. |
| Mar 10, 2026 | P00232 | $0 | THE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO INCORPORATE ATTACHMENT 27.5, HEXAVALENT CHROMIUM AND CADMIUM ACV-R PRTVS WAIVER, ATTACHMENT 27.5A, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.5B, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.6, HC MECH FASTENERS ACV-30 PRTVS WAIVER, AND EXTEND CLIN 2009 POP. |
| Mar 10, 2026 | P00232 | $0 | THE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO INCORPORATE ATTACHMENT 27.5, HEXAVALENT CHROMIUM AND CADMIUM ACV-R PRTVS WAIVER, ATTACHMENT 27.5A, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.5B, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.6, HC MECH FASTENERS ACV-30 PRTVS WAIVER, AND EXTEND CLIN 2009 POP. |
| Mar 10, 2026 | P00232 | $0 | THE PURPOSE OF THIS BI-LATERAL MODIFICATION IS TO INCORPORATE ATTACHMENT 27.5, HEXAVALENT CHROMIUM AND CADMIUM ACV-R PRTVS WAIVER, ATTACHMENT 27.5A, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.5B, ALTERNATE CADMIUM CONNECTOR ACV-R WAIVER, ATTACHMENT 27.6, HC MECH FASTENERS ACV-30 PRTVS WAIVER, AND EXTEND CLIN 2009 POP. |
| Mar 10, 2026 | P00233 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR BY UPDATING ATTACHMENT 50 SECTION D PACKAGING AND MARKING TO INSERT MISSING VEHICLE NUMBERS 689340-689490 FOR ACV-30 FRP LOTS 5-6. |
| Mar 10, 2026 | P00233 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR BY UPDATING ATTACHMENT 50 SECTION D PACKAGING AND MARKING TO INSERT MISSING VEHICLE NUMBERS 689340-689490 FOR ACV-30 FRP LOTS 5-6. |
| Mar 10, 2026 | P00233 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR BY UPDATING ATTACHMENT 50 SECTION D PACKAGING AND MARKING TO INSERT MISSING VEHICLE NUMBERS 689340-689490 FOR ACV-30 FRP LOTS 5-6. |
| Mar 10, 2026 | P00234 | $0 | THIS PURPOSE OF THIS BILATERAL MODIFICATION (P00234) IS TO UPDATE ATTACHMENT 10.2, SCHEDULED GFP (SGFP) LIST, ATTACHMENT 20, ACV CONFIGURATION MANAGEMENT PLAN, AND ATTACHMENT 53, SECTION G ADMINISTRATION. |
| Mar 10, 2026 | P00234 | $0 | THIS PURPOSE OF THIS BILATERAL MODIFICATION (P00234) IS TO UPDATE ATTACHMENT 10.2, SCHEDULED GFP (SGFP) LIST, ATTACHMENT 20, ACV CONFIGURATION MANAGEMENT PLAN, AND ATTACHMENT 53, SECTION G ADMINISTRATION. |
| Mar 10, 2026 | P00234 | $0 | THIS PURPOSE OF THIS BILATERAL MODIFICATION (P00234) IS TO UPDATE ATTACHMENT 10.2, SCHEDULED GFP (SGFP) LIST, ATTACHMENT 20, ACV CONFIGURATION MANAGEMENT PLAN, AND ATTACHMENT 53, SECTION G ADMINISTRATION. |
| Mar 10, 2026 | P00235 | $0 | THIS PURPOSE OF THIS BILATERALLY MOD IS TO RECORD THE MUTUAL SETTLEMENT AGREEMENT BETWEEN BAE AND THE GOVERNMENT TO RESOLVE THE CLAIMS AND ISSUES RAISED BY BAE. |
| Mar 10, 2026 | P00235 | $0 | THIS PURPOSE OF THIS BILATERALLY MOD IS TO RECORD THE MUTUAL SETTLEMENT AGREEMENT BETWEEN BAE AND THE GOVERNMENT TO RESOLVE THE REA. |
| Mar 10, 2026 | P00235 | $0 | THIS PURPOSE OF THIS BILATERALLY MOD IS TO RECORD THE MUTUAL SETTLEMENT AGREEMENT BETWEEN BAE AND THE GOVERNMENT TO RESOLVE THE CLAIMS AND ISSUES RAISED BY BAE. |
| Mar 10, 2026 | P00236 | $0 | THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO DOCUMENT THE FILE FOR THE INCORPORATION OF VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION NO. 30 REVISION 1, FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM (FRACAS) SUSTAINMENT. |
| Mar 10, 2026 | P00236 | $554.3K | THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO DOCUMENT THE FILE FOR THE INCORPORATION OF VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION NO. 30 REVISION 1, FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM (FRACAS) SUSTAINMENT. |
| Mar 10, 2026 | P00236 | $0 | THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO DOCUMENT THE FILE FOR THE INCORPORATION OF VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION NO. 30 REVISION 1, FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM (FRACAS) SUSTAINMENT. |
| Mar 10, 2026 | P00237 | $0 | INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION (TI) NO. 23 REVISION 2, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES |
| Mar 10, 2026 | P00237 | $833.0K | INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION (TI) NO. 23 REVISION 2, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES |
| Mar 10, 2026 | P00237 | $0 | INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING (NRE) EFFORT FOR TASK INSTRUCTION (TI) NO. 23 REVISION 2, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES |
| Mar 10, 2026 | P00238 | $0 | PROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R. |
| Mar 10, 2026 | P00238 | $134.6K | PROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R. |
| Mar 10, 2026 | P00238 | $0 | PROCUREMENT OF AMPHIBIOUS COMBAT VEHICLES FAMILY OF VEHICLES ACV-P, ACV-C, ACV-30, AND ACV-R. |
| Jan 8, 2026 | P00225 | $0 | INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6B IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6 |
| Jan 8, 2026 | P00225 | $0 | INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6B IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6 |
| Jan 8, 2026 | P00225 | $4.2M | INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6B IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6 |
| Dec 22, 2025 | P00224 | $0 | INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6A IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND VARIOUS ADMINISTRATIVE CHANGES |
| Dec 22, 2025 | P00224 | $0 | INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6A IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND VARIOUS ADMINISTRATIVE CHANGES |
| Dec 22, 2025 | P00224 | $3.7M | INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 6A IN ACCORDANCE WITH SECTION G.14.2, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND VARIOUS ADMINISTRATIVE CHANGES |
| Dec 18, 2025 | P00223 | $0 | FRP LOT 6B OPTION EXERCISE |
| Dec 18, 2025 | P00223 | $0 | FRP LOT 6B OPTION EXERCISE |
| Dec 18, 2025 | P00223 | $195.1M | FRP LOT 6B OPTION EXERCISE |
| Dec 10, 2025 | P00222 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE COMPLETE SETTLEMENT AGREEMENT BETWEEN THE PARTIES AS TO MATTERS DISCUSSED IN, AND DESCRIBED BY, SECTION G.26 CONSIDERATION AGREEMENT FOR NON-CONFORMING PAINT. |
| Dec 10, 2025 | P00222 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE COMPLETE SETTLEMENT AGREEMENT BETWEEN THE PARTIES AS TO MATTERS DISCUSSED IN, AND DESCRIBED BY, SECTION G.26 CONSIDERATION AGREEMENT FOR NON-CONFORMING PAINT. |
| Dec 10, 2025 | P00222 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE COMPLETE SETTLEMENT AGREEMENT BETWEEN THE PARTIES AS TO MATTERS DISCUSSED IN, AND DESCRIBED BY, SECTION G.26 CONSIDERATION AGREEMENT FOR NON-CONFORMING PAINT. |
| Dec 1, 2025 | P00221 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 6A SLINS 7501AA, 7501AD, 7502AA, 7503AA, 7502AD, AND 7504AA, CHANGE THE PSC CODE FOR SLIN 7501AD, AND UPDATE ATTACHMENT 10.2, SCHEDULED GOVERNMENT FURNISHED PROPERTY (SGFP) LIST. |
| Dec 1, 2025 | P00221 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 6A SLINS 7501AA, 7501AD, 7502AA, 7503AA, 7502AD, AND 7504AA, CHANGE THE PSC CODE FOR SLIN 7501AD, AND UPDATE ATTACHMENT 10.2, SCHEDULED GOVERNMENT FURNISHED PROPERTY (SGFP) LIST. |
| Dec 1, 2025 | P00221 | $184.4M | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 6A SLINS 7501AA, 7501AD, 7502AA, 7503AA, 7502AD, AND 7504AA, CHANGE THE PSC CODE FOR SLIN 7501AD, AND UPDATE ATTACHMENT 10.2, SCHEDULED GOVERNMENT FURNISHED PROPERTY (SGFP) LIST. |
| Sep 10, 2025 | P00220 | $0 | PRODUCTION IMPLEMENTATION OF ECP 0071, HATCH PROXIMITY SENSORS AND RAMP RELIABILITY IMPROVEMENTS (RETROFIT KITS/SPARES) TASK INSTRUCTION NO. 25 AND ADD FUNDING FOR FRP LOT 5C HEDGE LOCK. |
| Sep 10, 2025 | P00220 | $766.4K | PRODUCTION IMPLEMENTATION OF ECP 0071, HATCH PROXIMITY SENSORS AND RAMP RELIABILITY IMPROVEMENTS (RETROFIT KITS/SPARES) AND TASK INSTRUCTION NO. 25. |
| Sep 10, 2025 | P00220 | $7.6M | PRODUCTION IMPLEMENTATION OF ECP 0071, HATCH PROXIMITY SENSORS AND RAMP RELIABILITY IMPROVEMENTS (RETROFIT KITS/SPARES) TASK INSTRUCTION NO. 25 AND ADD FUNDING FOR FRP LOT 5C HEDGE LOCK. |
| Sep 2, 2025 | P00219 | $0 | FSR SUPPORT FOR 11TH MEU |
| Sep 2, 2025 | P00219 | $47.4K | FSR SUPPORT FOR 11TH MEU |
| Sep 2, 2025 | P00219 | $264.4K | FSR SUPPORT FOR 11TH MEU |
| Aug 26, 2025 | P00218 | $0 | INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES. |
| Aug 26, 2025 | P00218 | $472.1K | INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES. |
| Aug 26, 2025 | P00218 | $0 | INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES. |
| Aug 21, 2025 | P00217 | $0 | FUNDING FOR TI 30 FACARS SUSTAINMENT. |
| Aug 21, 2025 | P00217 | $543.4K | FUNDING FOR TI 30 FACARS SUSTAINMENT. |
| Aug 21, 2025 | P00217 | $0 | FUNDING FOR TI 30 FACARS SUSTAINMENT. |
| Jul 31, 2025 | P00216 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 5C SLINS 7301AC, 7302AC, 7303AC, AND 7304AC PURSUANT TO FAR CLAUSE 52.217-7, OPTION FOR INCREASED QUANTITY, SEPARATELY PRICED LINE ITEM AND ADJUST THE QUANTITY FOR SLIN 7301AC FROM 30 TO 31. |
| Jul 31, 2025 | P00216 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 5C SLINS 7301AC, 7302AC, 7303AC, AND 7304AC PURSUANT TO FAR CLAUSE 52.217-7, OPTION FOR INCREASED QUANTITY, SEPARATELY PRICED LINE ITEM AND ADJUST THE QUANTITY FOR SLIN 7301AC FROM 30 TO 31. |
| Jul 31, 2025 | P00216 | $181.1M | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 5C SLINS 7301AC, 7302AC, 7303AC, AND 7304AC PURSUANT TO FAR CLAUSE 52.217-7, OPTION FOR INCREASED QUANTITY, SEPARATELY PRICED LINE ITEM AND ADJUST THE QUANTITY FOR SLIN 7301AC FROM 30 TO 31. |
| Jul 23, 2025 | P00215 | $0 | BILATERAL MODIFICATION TO UPDATE CLINS 8103, 8104, AND 8105 TO CPFF COMPLETION, DEOBLIGATE $1,311,800.00 OFF OF CLIN 8105, AND UPDATE ATTACHMENTS 2, 10.2, AND 33. |
| Jul 23, 2025 | P00215 | $-1.3M | BILATERAL MODIFICATION TO UPDATE CLINS 8103, 8104, AND 8105 TO CPFF COMPLETION, DEOBLIGATE $1,311,800.00 OFF OF CLIN 8105, AND UPDATE ATTACHMENTS 2, 10.2, AND 33. |
| Jul 23, 2025 | P00215 | $0 | BILATERAL MODIFICATION TO UPDATE CLINS 8103, 8104, AND 8105 TO CPFF COMPLETION, DEOBLIGATE $1,311,800.00 OFF OF CLIN 8105, AND UPDATE ATTACHMENTS 2, 10.2, AND 33. |
| Jun 3, 2025 | P00214 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE SECTION G.25, ACV PROPELLER SHAFT ASSEMBLY, TO MEMORIALIZE THE AGREEMENT BETWEEN BAE AND THE GOVERNMENT FOR PROPELLER SHAFT ASSEMBLY. |
| Jun 3, 2025 | P00214 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE SECTION G.25, ACV PROPELLER SHAFT ASSEMBLY, TO MEMORIALIZE THE AGREEMENT BETWEEN BAE AND THE GOVERNMENT FOR PROPELLER SHAFT ASSEMBLY. |
| Jun 3, 2025 | P00214 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE SECTION G.25, ACV PROPELLER SHAFT ASSEMBLY, TO MEMORIALIZE THE AGREEMENT BETWEEN BAE AND THE GOVERNMENT FOR PROPELLER SHAFT ASSEMBLY. |
| May 30, 2025 | P00213 | $0 | THIS MOD IS TO DOCUMENT THE INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5B IN ACCORDANCE WITH SECTION G.14, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND TO INCREMENTALLY FUND CLIN 8201, ACV-R MRV, AND CLIN 8203, ACV-R TEST SUPPORT |
| May 30, 2025 | P00213 | $15.2M | THE PURPOSE OF THIS MOD IS TO INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5B IN ACCORDANCE WITH SECTION G.14, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND TO INCREMENTALLY FUND CLIN 8201, ACV-R MRV PHASE 2, AND CLIN 8203, ACV-R PHASE 2 |
| May 30, 2025 | P00213 | $2.7M | THIS MOD IS TO DOCUMENT THE INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5B IN ACCORDANCE WITH SECTION G.14, FOREIGN EXCHANGE PRICE ADJUSTMENT FOR FRP LOTS 5 AND 6, AND TO INCREMENTALLY FUND CLIN 8201, ACV-R MRV, AND CLIN 8203, ACV-R TEST SUPPORT |
| May 21, 2025 | P00212 | $0 | UPDATED ATTACHMENT 05, ACV FOV IMP, AND ATTACHMENT 27 AAA FRM-02002 -V.3 - CONTRACTOR REQUEST FOR USE OF PROHIBITED MATERIALS, AND INCORPORATE ATTACHMENT 27.4, HC MECH FASTENERS ACV-30 PRTVS. |
| May 21, 2025 | P00212 | $0 | UPDATED ATTACHMENT 05, ACV FOV IMP, AND ATTACHMENT 27 AAA FRM-02002 -V.3 - CONTRACTOR REQUEST FOR USE OF PROHIBITED MATERIALS, AND INCORPORATE ATTACHMENT 27.4, HC MECH FASTENERS ACV-30 PRTVS. |
| May 21, 2025 | P00212 | $0 | UPDATED ATTACHMENT 05, ACV FOV IMP, AND ATTACHMENT 27 AAA FRM-02002 -V.3 - CONTRACTOR REQUEST FOR USE OF PROHIBITED MATERIALS, AND INCORPORATE ATTACHMENT 27.4, HC MECH FASTENERS ACV-30 PRTVS. |
| May 1, 2025 | P00211 | $0 | FRP LOT 5B OPTION EXERCISE |
| May 1, 2025 | P00211 | $0 | FRP LOT 5B OPTION EXERCISE |
| May 1, 2025 | P00211 | $172.3M | FRP LOT 5B OPTION EXERCISE |
| Apr 18, 2025 | P00210 | $0 | INCORPORATE FUNDING FOR THE FIELD SERVICE REPRESENTATIVE (FSR) GAP BETWEEN FULL RATE PRODUCTION (FRP) LOTS 4B AND 5A FOR CLIN 7203, FIELDING AND SUPPORT COSTS FRP LOT 4, FOR CAMP PENDLETON, CAMP LEJEUNE, AND OKINAWA |
| Apr 18, 2025 | P00210 | $0 | INCORPORATE FUNDING FOR THE FIELD SERVICE REPRESENTATIVE (FSR) GAP BETWEEN FULL RATE PRODUCTION (FRP) LOTS 4B AND 5A FOR CLIN 7203, FIELDING AND SUPPORT COSTS FRP LOT 4, FOR CAMP PENDLETON, CAMP LEJEUNE, AND OKINAWA |
| Apr 18, 2025 | P00210 | $2.0M | INCORPORATE FUNDING FOR THE FIELD SERVICE REPRESENTATIVE (FSR) GAP BETWEEN FULL RATE PRODUCTION (FRP) LOTS 4B AND 5A FOR CLIN 7203, FIELDING AND SUPPORT COSTS FRP LOT 4, FOR CAMP PENDLETON, CAMP LEJEUNE, AND OKINAWA |
| Mar 31, 2025 | P00209 | $0 | INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5A AND TO UPDATE FAR 52.216-16, INCENTIVE PRICE REVISION-FIRM TARGET, FROM "BY REFERENCE" TO "BY FULL TEXT" |
| Mar 31, 2025 | P00209 | $0 | INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5A AND TO UPDATE FAR 52.216-16, INCENTIVE PRICE REVISION-FIRM TARGET, FROM "BY REFERENCE" TO "BY FULL TEXT" |
| Mar 31, 2025 | P00209 | $-423.5K | INCORPORATE THE HEDGE LOCK RATE FOR FRP LOT 5A AND TO UPDATE FAR 52.216-16, INCENTIVE PRICE REVISION-FIRM TARGET, FROM "BY REFERENCE" TO "BY FULL TEXT" |
| Mar 18, 2025 | P00208 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THIS NO-COST BILATERAL MODIFICATION P00208 FOR CONTRACT M67854-16-C-0006 IS TO UPDATE SECTION I, CONTRACT CLAUSES, TO REMOVE FAR 52.222-21, PROHIBITION OF SEGREGATED FACILITIES, AND FAR 52.222-26, EQUAL OPPORTUNITY. |
| Mar 18, 2025 | P00208 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THIS NO-COST BILATERAL MODIFICATION P00208 FOR CONTRACT M67854-16-C-0006 IS TO UPDATE SECTION I, CONTRACT CLAUSES, TO REMOVE FAR 52.222-21, PROHIBITION OF SEGREGATED FACILITIES, AND FAR 52.222-26, EQUAL OPPORTUNITY. |
| Mar 18, 2025 | P00208 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THIS NO-COST BILATERAL MODIFICATION P00208 FOR CONTRACT M67854-16-C-0006 IS TO UPDATE SECTION I, CONTRACT CLAUSES, TO REMOVE FAR 52.222-21, PROHIBITION OF SEGREGATED FACILITIES, AND FAR 52.222-26, EQUAL OPPORTUNITY. |
| Mar 14, 2025 | P00207 | $0 | ACV-30 FRP LOTS 5-6 (EXERCISE CLINS FOR FRP LOT 5A) |
| Mar 14, 2025 | P00207 | $6.7M | ACV-30 FRP LOTS 5-6 (EXERCISE CLINS FOR FRP LOT 5A) |
| Mar 14, 2025 | P00207 | $181.8M | ACV-30 FRP LOTS 5-6 (EXERCISE CLINS FOR FRP LOT 5A) |
| Mar 3, 2025 | P00206 | $0 | INCREMENTALLY FUND CLIN 8103, ACV-30 PRODUCTION READINESS TEST VEHICLES (PRTV) DESIGN AND DEVELOPMENT PHASE 4 |
| Mar 3, 2025 | P00206 | $386.3K | INCREMENTALLY FUND CLIN 8103, ACV-30 PRODUCTION READINESS TEST VEHICLES (PRTV) DESIGN AND DEVELOPMENT PHASE 4 |
| Mar 3, 2025 | P00206 | $0 | INCREMENTALLY FUND CLIN 8103, ACV-30 PRODUCTION READINESS TEST VEHICLES (PRTV) DESIGN AND DEVELOPMENT PHASE 4 |
| Jan 31, 2025 | P00205 | $0 | UPDATE THE VALUE AND FUNDING FOR CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR NRE COSTS FOR ECP 65 DESIGN EFFORT, AND INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4 |
| Jan 31, 2025 | P00205 | $2.9M | UPDATE THE VALUE AND FUNDING FOR CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR NRE COSTS FOR ECP 65 DESIGN EFFORT, AND INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4 |
| Jan 31, 2025 | P00205 | $0 | UPDATE THE VALUE AND FUNDING FOR CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR NRE COSTS FOR ECP 65 DESIGN EFFORT, AND INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4 |
| Dec 20, 2024 | P00204 | $0 | INCREMENTALLY FUNDING CLINS 8201 AND 8203 |
| Dec 20, 2024 | P00204 | $5.1M | INCREMENTALLY FUND CLINS 8201 AND 8203 |
| Dec 20, 2024 | P00204 | $0 | INCREMENTALLY FUND CLINS 8201 AND 8203 |
| Nov 13, 2024 | P00203 | $0 | INCORPORATE VALUE AND FUNDING UNDER CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR ACV-30 DRAWINGS UPDATE FOR FULL RATE PRODUCTION (FRP) LOTS 5-6, TASK INSTRUCTION (TI) NO. 29 EXTEND THE PERIOD OF PERFORMANCE (POP) ON CLINS 6203AB, FSR 15TH MEU: 1ST FIELD SERVICE REPRESENTATIVE (FSR) DEPLOYMENT, AND 6203AE, FSR 15TH MEU: 2ND FSR DEPLOYMENT AND UPDATE ATTACHMENTS 16, 16.1, AND 16.2, TECHNICAL MANUAL CONTRACT REQUIREMENT (TMCR) |
| Nov 13, 2024 | P00203 | $1.1M | INCORPORATE VALUE AND FUNDING UNDER CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR ACV-30 DRAWINGS UPDATE FOR FULL RATE PRODUCTION (FRP) LOTS 5-6, TASK INSTRUCTION (TI) NO. 29 EXTEND THE PERIOD OF PERFORMANCE (POP) ON CLINS 6203AB, FSR 15TH MEU: 1ST FIELD SERVICE REPRESENTATIVE (FSR) DEPLOYMENT, AND 6203AE, FSR 15TH MEU: 2ND FSR DEPLOYMENT AND UPDATE ATTACHMENTS 16, 16.1, AND 16.2, TECHNICAL MANUAL CONTRACT REQUIREMENT (TMCR) |
| Nov 13, 2024 | P00203 | $0 | INCORPORATE VALUE AND FUNDING UNDER CLIN 2009, NON-RECURRING ENGINEERING (NRE) CHANGES, FOR ACV-30 DRAWINGS UPDATE FOR FULL RATE PRODUCTION (FRP) LOTS 5-6, TASK INSTRUCTION (TI) NO. 29 EXTEND THE PERIOD OF PERFORMANCE (POP) ON CLINS 6203AB, FSR 15TH MEU: 1ST FIELD SERVICE REPRESENTATIVE (FSR) DEPLOYMENT, AND 6203AE, FSR 15TH MEU: 2ND FSR DEPLOYMENT AND UPDATE ATTACHMENTS 16, 16.1, AND 16.2, TECHNICAL MANUAL CONTRACT REQUIREMENT (TMCR) |
| Sep 25, 2024 | P00202 | $0 | INCORPORATE INCREMENTAL FUNDING FOR CLIN 8201, ACV-R POST-CDR DESIGN AND DEVELOPMENT (PHASE 2), AND TO UPDATE DFARS 252.232-7006, WIDE AREA WORKFLOW (WAWF) PAYMENT INSTRUCTIONS. |
| Sep 25, 2024 | P00202 | $256.3K | INCORPORATE INCREMENTAL FUNDING FOR CLIN 8201, ACV-R POST-CDR DESIGN AND DEVELOPMENT (PHASE 2), AND TO UPDATE DFARS 252.232-7006, WIDE AREA WORKFLOW (WAWF) PAYMENT INSTRUCTIONS. |
| Sep 25, 2024 | P00202 | $0 | INCORPORATE INCREMENTAL FUNDING FOR CLIN 8201, ACV-R POST-CDR DESIGN AND DEVELOPMENT (PHASE 2), AND TO UPDATE DFARS 252.232-7006, WIDE AREA WORKFLOW (WAWF) PAYMENT INSTRUCTIONS. |
| Sep 4, 2024 | P00201 | $0 | UPDATE ATTACHMENT 11, COVER SHEET FOR TEST SCHEDULES AND TEST LOCATIONS, AND ATTACHMENT 11.2, ACV-30 MISSION ROLE VARIANT (MRV) TEST SCHEDULES AND TEST LOCATIONS DRAFT, TO REFLECT REVISED DATES AND SCHEDULE UPDATES. |
| Sep 4, 2024 | P00201 | $0 | UPDATE ATTACHMENT 11, COVER SHEET FOR TEST SCHEDULES AND TEST LOCATIONS, AND ATTACHMENT 11.2, ACV-30 MISSION ROLE VARIANT (MRV) TEST SCHEDULES AND TEST LOCATIONS DRAFT, TO REFLECT REVISED DATES AND SCHEDULE UPDATES. |
| Sep 4, 2024 | P00201 | $0 | UPDATE ATTACHMENT 11, COVER SHEET FOR TEST SCHEDULES AND TEST LOCATIONS, AND ATTACHMENT 11.2, ACV-30 MISSION ROLE VARIANT (MRV) TEST SCHEDULES AND TEST LOCATIONS DRAFT, TO REFLECT REVISED DATES AND SCHEDULE UPDATES. |
| Aug 23, 2024 | P00200 | $0 | UPDATE SECTION D, PACKAGING AND MARKING, AMPHIBIOUS COMBAT VEHICLE PERSONNEL (ACV-P) LOW RATE INITIAL PRODUCTION (LRIP) AND FULL RATE PRODUCTION (FRP) VEHICLE MARKING, TO CORRECT FRP LOT 2A SERIAL NUMBERS |
| Aug 23, 2024 | P00200 | $0 | UPDATE SECTION D, PACKAGING AND MARKING, AMPHIBIOUS COMBAT VEHICLE PERSONNEL (ACV-P) LOW RATE INITIAL PRODUCTION (LRIP) AND FULL RATE PRODUCTION (FRP) VEHICLE MARKING, TO CORRECT FRP LOT 2A SERIAL NUMBERS |
| Aug 23, 2024 | P00200 | $0 | UPDATE SECTION D, PACKAGING AND MARKING, AMPHIBIOUS COMBAT VEHICLE PERSONNEL (ACV-P) LOW RATE INITIAL PRODUCTION (LRIP) AND FULL RATE PRODUCTION (FRP) VEHICLE MARKING, TO CORRECT FRP LOT 2A SERIAL NUMBERS |
| Aug 15, 2024 | P00199 | $0 | INCORPORATE, FUND, AND EXERCISE CLIN 2011, NIWC FSR SUPPORT, TO COVER FSR SUPPORT AT THE NAVAL INFORMATION WARFARE CENTER (NIWC) |
| Aug 15, 2024 | P00199 | $60.0K | INCORPORATE, FUND, AND EXERCISE CLIN 2011, NIWC FSR SUPPORT, TO COVER FSR SUPPORT AT THE NAVAL INFORMATION WARFARE CENTER (NIWC) |
| Aug 15, 2024 | P00199 | $0 | INCORPORATE, FUND, AND EXERCISE CLIN 2011, NIWC FSR SUPPORT, TO COVER FSR SUPPORT AT THE NAVAL INFORMATION WARFARE CENTER (NIWC) |
| Jul 31, 2024 | P00198 | $0 | INCORPORATE VALUE AND FUNDING UNDER CLIN 2010 FOR FIELD SERVICE REPRESENTATIVE (FSR) SUPPORT AT NAVAL INFORMATION WARFARE CENTER (NIWC) AND INCREMENTALLY FUND CLIN 8201, ACV-R POST-CRITICAL DESIGN REVIEW (CDR) DESIGN AND DEVELOPMENT (PHASE 2) |
| Jul 31, 2024 | P00198 | $2.5M | INCORPORATE VALUE AND FUNDING UNDER CLIN 2010 FOR FIELD SERVICE REPRESENTATIVE (FSR) SUPPORT AT NAVAL INFORMATION WARFARE CENTER (NIWC) AND INCREMENTALLY FUND CLIN 8201, ACV-R POST-CRITICAL DESIGN REVIEW (CDR) DESIGN AND DEVELOPMENT (PHASE 2) |
| Jul 31, 2024 | P00198 | $0 | INCORPORATE VALUE AND FUNDING UNDER CLIN 2010 FOR FIELD SERVICE REPRESENTATIVE (FSR) SUPPORT AT NAVAL INFORMATION WARFARE CENTER (NIWC) AND INCREMENTALLY FUND CLIN 8201, ACV-R POST-CRITICAL DESIGN REVIEW (CDR) DESIGN AND DEVELOPMENT (PHASE 2) |
| Jul 12, 2024 | P00197 | $0 | BILATERAL MODIFICATION TO INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES |
| Jul 12, 2024 | P00197 | $1.0M | INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES |
| Jul 12, 2024 | P00197 | $0 | BILATERAL MODIFICATION TO INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING FOR PRE-ECP TASK INSTRUCTION NO. 23, PRE-ECP WORK FOR READINESS AND SAFETY ISSUES |
| Jul 3, 2024 | A00001 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE ADMIN OFFICE AND PAY OFFICE ON MODS ARZ993 AND P00194. |
| Jul 3, 2024 | A00002 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE QUANTITY, UNIT OF ISSUE, UNIT PRICE FOR CLIN 3005 |
| Jul 3, 2024 | P00196 | $0 | INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING EFFORT FOR TASK INSTRUCTION NO. 28 FOR FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM SUSTAINMENT. |
| Jul 3, 2024 | P00196 | $533.1K | INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING EFFORT FOR TASK INSTRUCTION NO. 28 FOR FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM SUSTAINMENT. |
| Jul 3, 2024 | P00196 | $0 | INCORPORATE VALUE AND FUNDING UNDER CLIN 2009 FOR NON-RECURRING ENGINEERING EFFORT FOR TASK INSTRUCTION NO. 28 FOR FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM SUSTAINMENT. |
| Jun 28, 2024 | P00195 | $0 | CHANGE STRUCTURE OF SLINS UNDER CLIN 6203, FSR SUPPORT FOR THE 15TH MEU AND INCREMENTALLY FUND CLINS 8103, ACV-30 PRTV DESIGN AND DEVELOPMENT PHASE 4 AND 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4 |
| Jun 28, 2024 | P00195 | $5.4M | CHANGE STRUCTURE OF SLINS UNDER CLIN 6203, FSR SUPPORT FOR THE 15TH MEU AND INCREMENTALLY FUND CLINS 8103, ACV-30 PRTV DESIGN AND DEVELOPMENT PHASE 4 AND 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4 |
| Jun 28, 2024 | P00195 | $0 | CHANGE STRUCTURE OF SLINS UNDER CLIN 6203, FSR SUPPORT FOR THE 15TH MEU AND INCREMENTALLY FUND CLINS 8103, ACV-30 PRTV DESIGN AND DEVELOPMENT PHASE 4 AND 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4 |
| Jun 20, 2024 | P00194 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE HEDGE LOCK RATE FOR FRP LOTS 4A AND 4B TWO YEARS IIP SPARES AND TO FIX ADMINISTRATIVE ERROR ON ATTACHMENT 33. |
| Jun 20, 2024 | P00194 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE HEDGE LOCK RATE FOR FRP LOTS 4A AND 4B TWO YEARS IIP SPARES AND TO FIX ADMINISTRATIVE ERROR ON ATTACHMENT 33. |
| Jun 20, 2024 | P00194 | $-342.7K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE HEDGE LOCK RATE FOR FRP LOTS 4A AND 4B TWO YEARS IIP SPARES AND TO FIX ADMINISTRATIVE ERROR ON ATTACHMENT 33. |
| May 23, 2024 | P00193 | $0 | INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4 |
| May 23, 2024 | P00193 | $2.1M | INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4 |
| May 23, 2024 | P00193 | $0 | INCREMENTALLY FUND CLIN 8105, ACV-30 PRTV TEST AND SUPPORT PHASE 4 |
| May 20, 2024 | P00192 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE AND FUND CLIN 7204AA AND 7204AB TWO YEARS INITIAL ISSUE PROVISIONING SPARES. |
| May 20, 2024 | P00192 | $46.4K | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE AND FUND CLIN 7204AA AND 7204AB TWO YEARS INITIAL ISSUE PROVISIONING SPARES. |
| May 20, 2024 | P00192 | $6.8M | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE AND FUND CLIN 7204AA AND 7204AB TWO YEARS INITIAL ISSUE PROVISIONING SPARES. |
| Apr 25, 2024 | P00191 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO PERFORM THE HEDGE LOCK FOR LOT 4B AND UPDATE SECTION J ATTACHMENTS. |
| Apr 25, 2024 | P00191 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO PERFORM THE HEDGE LOCK FOR LOT 4B AND UPDATE SECTION J ATTACHMENTS. |
| Apr 25, 2024 | P00191 | $-6.1M | THE PURPOSE OF THIS MODIFICATION IS TO PERFORM THE HEDGE LOCK FOR LOT 4B AND UPDATE SECTION J ATTACHMENTS. |
| Apr 4, 2024 | P00190 | $0 | ACV-R PHASE 2 FOR PRTVS |
| Apr 4, 2024 | P00190 | $52.1M | ACV-R PHASE 2 FOR PRTVS |
| Apr 4, 2024 | P00190 | $0 | ACV-R PHASE 2 FOR PRTVS |
| Mar 28, 2024 | P00189 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 4B SLIN 7201AD FOR M67854-16-C-0006 P00189. |
| Mar 28, 2024 | P00189 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 4B SLIN 7201AD FOR M67854-16-C-0006 P00189. |
| Mar 28, 2024 | P00189 | $25.7M | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE FRP LOT 4B SLIN 7201AD FOR M67854-16-C-0006 P00189. |
| Mar 14, 2024 | P00188 | $0 | THE PURPOSE OF THIS MOD IS TO DOCUMENT THE FILE FOR THE BILATERAL EXERCISE OF OPTION SLINS 6203AB AND 6203AE, FSR SUPPORT FOR THE 15TH MEU, PURSUANT TO FAR CLAUSE 52.217-7 AND TO INCORPORATE DFARS CLAUSE 252.245-7005. |
| Mar 14, 2024 | P00188 | $0 | THE PURPOSE OF THIS MOD IS TO DOCUMENT THE FILE FOR THE BILATERAL EXERCISE OF OPTION SLINS 6203AB AND 6203AE, FSR SUPPORT FOR THE 15TH MEU, PURSUANT TO FAR CLAUSE 52.217-7 AND TO INCORPORATE DFARS CLAUSE 252.245-7005. |
| Mar 14, 2024 | P00188 | $775.8K | THE PURPOSE OF THIS MOD IS TO DOCUMENT THE FILE FOR THE BILATERAL EXERCISE OF OPTION SLINS 6203AB AND 6203AE, FSR SUPPORT FOR THE 15TH MEU, PURSUANT TO FAR CLAUSE 52.217-7 AND TO INCORPORATE DFARS CLAUSE 252.245-7005. |
| Mar 6, 2024 | P00187 | $0 | FRP LOT 4B OPTION EXERCISE |
| Mar 6, 2024 | P00187 | $0 | FRP LOT 4B OPTION EXERCISE |
| Mar 6, 2024 | P00187 | $181.9M | FRP LOT 4B OPTION EXERCISE |
| Feb 20, 2024 | P00186 | $0 | PROCURING ACV-30 TURRET SPARE PARTS FOR TEST SUPPORT. |
| Feb 20, 2024 | P00186 | $1.8M | PROCURING ACV-30 TURRET SPARE PARTS FOR TEST SUPPORT. |
| Feb 20, 2024 | P00186 | $0 | PROCURING ACV-30 TURRET SPARE PARTS FOR TEST SUPPORT. |
| Nov 21, 2023 | P00185 | $0 | ACV-R CDR DRAWINGS, FUNDING FOR TEST SUPPORT COST OVERRUN, AND HEDGE LOCK FOR FRP LOT 4A |
| Nov 21, 2023 | P00185 | $3.8M | ACV-R CDR DRAWINGS, FUNDING FOR TEST SUPPORT COST OVERRUN, AND HEDGE LOCK FOR FRP LOT 4A |
| Nov 21, 2023 | P00185 | $-7.5M | ACV-R CDR DRAWINGS, FUNDING FOR TEST SUPPORT COST OVERRUN, AND HEDGE LOCK FOR FRP LOT 4A |
| Nov 17, 2023 | P00184 | $0 | INCREMENTALLY FUND CLINS 8103 AND 8105 |
| Nov 17, 2023 | P00184 | $4.9M | INCREMENTALLY FUND CLINS 8103 AND 8105 |
| Nov 17, 2023 | P00184 | $0 | INCREMENTALLY FUND CLINS 8103 AND 8105 |
| Nov 3, 2023 | P00183 | $0 | FRP LOT 4A OPTION EXERCISE |
| Nov 3, 2023 | P00183 | $0 | FRP LOT 4A OPTION EXERCISE |
| Nov 3, 2023 | P00183 | $211.5M | FRP LOT 4A OPTION EXERCISE |
| Oct 31, 2023 | P00182 | $0 | FIVE ENGINEERING CHANGE PROPOSALS (ECPS) (C003 ANTENNA MOUNT TO REDESIGN, C004 RELOCATED MULTIPLE ITEMS, C013 ADD GLOBAL POSITIONING SYSTEM (GPS) (ROCTEC) PASS THRU BLOCKS, C015 SHIELD THE EMERGENCY EGRESS LIGHTING SYSTEM (EELS) CAPACITOR, AND C016 PART B M240 WEAPON MECHANICAL INTEGRATION INSTALLATION) INTO FRP LOT 2C (14 ACV-C VEHICLES), FRP LOT 3C (17 ACV-C VEHICLES), AND PRODUCTION READINESS TEST VEHICLES (PRTVS) (2 ACV-C VEHICLES), 2) INCORPORATE UPDATED ATTACHMENT 10.2, SCHEDULED GFP (SGFP) REPORT, ATTACHMENT 27, REQUEST FOR USE OF PROHIBITED MATERIALS, INCORPORATE ATTACHMENT 27.3, HEXAVALENT CHROMIUM AND CADMIUM WAIVER, 3) REALIGN $1M FROM CLIN 8103 TO CLIN 8105, AND 4) INCORPORATE FAR CLAUSE 52.204-27, PROHIBITION ON A BYTEDANCE COVERED APPLICATION |
| Oct 31, 2023 | P00182 | $93.0K | FIVE ENGINEERING CHANGE PROPOSALS (ECPS) (C003 ANTENNA MOUNT TO REDESIGN, C004 RELOCATED MULTIPLE ITEMS, C013 ADD GLOBAL POSITIONING SYSTEM (GPS) (ROCTEC) PASS THRU BLOCKS, C015 SHIELD THE EMERGENCY EGRESS LIGHTING SYSTEM (EELS) CAPACITOR, AND C016 PART B M240 WEAPON MECHANICAL INTEGRATION INSTALLATION) INTO FRP LOT 2C (14 ACV-C VEHICLES), FRP LOT 3C (17 ACV-C VEHICLES), AND PRODUCTION READINESS TEST VEHICLES (PRTVS) (2 ACV-C VEHICLES), 2) INCORPORATE UPDATED ATTACHMENT 10.2, SCHEDULED GFP (SGFP) REPORT, ATTACHMENT 27, REQUEST FOR USE OF PROHIBITED MATERIALS, INCORPORATE ATTACHMENT 27.3, HEXAVALENT CHROMIUM AND CADMIUM WAIVER, 3) REALIGN $1M FROM CLIN 8103 TO CLIN 8105, AND 4) INCORPORATE FAR CLAUSE 52.204-27, PROHIBITION ON A BYTEDANCE COVERED APPLICATION |
| Oct 31, 2023 | P00182 | $4.1M | FIVE ENGINEERING CHANGE PROPOSALS (ECPS) (C003 ANTENNA MOUNT TO REDESIGN, C004 RELOCATED MULTIPLE ITEMS, C013 ADD GLOBAL POSITIONING SYSTEM (GPS) (ROCTEC) PASS THRU BLOCKS, C015 SHIELD THE EMERGENCY EGRESS LIGHTING SYSTEM (EELS) CAPACITOR, AND C016 PART B M240 WEAPON MECHANICAL INTEGRATION INSTALLATION) INTO FRP LOT 2C (14 ACV-C VEHICLES), FRP LOT 3C (17 ACV-C VEHICLES), AND PRODUCTION READINESS TEST VEHICLES (PRTVS) (2 ACV-C VEHICLES), 2) INCORPORATE UPDATED ATTACHMENT 10.2, SCHEDULED GFP (SGFP) REPORT, ATTACHMENT 27, REQUEST FOR USE OF PROHIBITED MATERIALS, INCORPORATE ATTACHMENT 27.3, HEXAVALENT CHROMIUM AND CADMIUM WAIVER, 3) REALIGN $1M FROM CLIN 8103 TO CLIN 8105, AND 4) INCORPORATE FAR CLAUSE 52.204-27, PROHIBITION ON A BYTEDANCE COVERED APPLICATION |
| Sep 28, 2023 | P00181 | $0 | ACV-R PHASE 2 MATERIAL DEVELOPMENT |
| Sep 28, 2023 | P00181 | $6.3M | ACV-R MISSION ROLE VARIANT (MRV) PHASE 2 MATERIAL DEVELOPMENT |
| Sep 28, 2023 | P00181 | $0 | ACV-R PHASE 2 MATERIAL DEVELOPMENT |
| Sep 25, 2023 | P00180 | $0 | ECP54 RETROFIT KITS/CLIN 6202 ADMIN UPDATES/SECTION D VEHICLE SERIAL NUMBER UPDATES |
| Sep 25, 2023 | P00180 | $13.3K | ECP54 RETROFIT KITS/CLIN 6202 ADMIN UPDATES/SECTION D VEHICLE SERIAL NUMBER UPDATES |
| Sep 25, 2023 | P00180 | $418.2K | ECP54 RETROFIT KITS/CLIN 6202 ADMIN UPDATES/SECTION D VEHICLE SERIAL NUMBER UPDATES |
| Sep 12, 2023 | P00179 | $0 | ECP54 RETROFIT CABLES |
| Sep 12, 2023 | P00179 | $102.3K | ECP54 RETROFIT CABLES |
| Sep 12, 2023 | P00179 | $1.6M | ECP54 RETROFIT CABLES |
| Aug 18, 2023 | P00178 | $0 | PROHIBITED MATERIAL CONSIDERATION |
| Aug 18, 2023 | P00178 | $0 | PROHIBITED MATERIAL CONSIDERATION |
| Aug 18, 2023 | P00178 | $0 | PROHIBITED MATERIAL CONSIDERATION |
| Aug 15, 2023 | P00177 | $0 | ACV-30 PHASE 4 DOCUMENTATION AND SUBJECT MATTER EXPERT SUPPORT FOR SAFETY MEETINGS. |
| Aug 15, 2023 | P00177 | $943.1K | ACV-30 PRTV DESIGN & DEVT PHASE 4 DOCUMENTATION AND SUBJECT MATTER EXPERT SUPPORT FOR SAFETY REVIEW MEETINGS. |
| Aug 15, 2023 | P00177 | $0 | ACV-30 PHASE 4 DOCUMENTATION AND SUBJECT MATTER EXPERT SUPPORT FOR SAFETY REVIEW MEETINGS. |
| Aug 2, 2023 | P00176 | $0 | ENGINEERING CHANGES AND ADMINISTRATIVE UPDATES |
| Aug 2, 2023 | P00176 | $1.2M | ENGINEERING CHANGES AND ADMINISTRATIVE UPDATES |
| Aug 2, 2023 | P00176 | $0 | ENGINEERING CHANGES AND ADMINISTRATIVE UPDATES |
| Jul 24, 2023 | P00175 | $0 | FULL RATE PRODUCTION - INCORPORATE SECTIONS G.21 AND G.22 FOR STRUT ASSEMBLY AND CASTLE RING INSPECTION AND REPAIRS ON VEHICLES. |
| Jul 24, 2023 | P00175 | $0 | ACV-30 PRTV DESIGN & DEVT PHASE 4 |
| Jul 24, 2023 | P00175 | $0 | FULL RATE PRODUCTION - INCORPORATE SECTIONS G.21 AND G.22 FOR STRUT ASSEMBLY AND CASTLE RING INSPECTION AND REPAIRS ON VEHICLES. |
| Jul 12, 2023 | P00174 | $0 | FIELD SERVICE REPRESENTATIVE FOR THE 15TH MARINE EXPEDITIONARY UNIT. |
| Jul 12, 2023 | P00174 | $70.1K | FIELD SERVICE REPRESENTATIVE SUPPORT FOR THE 15TH MARINE EXPEDITIONARY UNIT. |
| Jul 12, 2023 | P00174 | $689.1K | FIELD SERVICE REPRESENTATIVE SUPPORT FOR THE 15TH MARINE EXPEDITIONARY UNIT. |
| Jun 9, 2023 | P00173 | $0 | REVISED QTY AND UNIT PRICE FOR CLIN 5005 ADMINISTRATIVE CORRECTION |
| Jun 9, 2023 | P00173 | $0 | REVISED QTY AND UNIT PRICE FOR CLIN 5005 ADMINISTRATIVE CORRECTION |
| Jun 9, 2023 | P00173 | $0 | REVISED QTY AND UNIT PRICE FOR CLIN 5005 ADMINISTRATIVE CORRECTION |
Estimated positioning window
Jun 30, 2027 – Dec 30, 2027
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2028-06-30 (607 days from calculation)
- +25 points
- 4 historical awards in this buyer and category group
- +15 points
- 720 recorded award transactions
- +10 points
- Latest award action: 2026-03-12
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.