Federal contract award
N0001907C0001
MV-22 AIRCRAFT - FY08 (LOT 12)*
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | DCMA VERTICAL LIFT PHILADELPHIA |
| NAICS | 336411 — Aircraft Manufacturing |
| PSC | 1520 — Aircraft, Rotary Wing |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIXED PRICE INCENTIVE |
| Obligations | $11.0B |
| Current contract value | $11.1B |
| Potential contract value / ceiling | $11.1B |
| Start date | Apr 2, 2007 |
| Current end date | Aug 15, 2020 |
| Potential end date | Aug 15, 2020 |
| Latest award activity | Jun 1, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 285 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 1, 2026 | AB0021 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO TRANSFER ACCOUNTABILITY OF THE CONTRACT PROPERTY ITEMS. |
| May 15, 2026 | A00044 | $0 | TRANSFER OF GFP TO N00019-17-C-0015 AND CHANGE OF PAYMENT OFFICE TO HQ0339 |
| Apr 9, 2026 | A00043 | $0 | TRANSFER OF GFP TO N00019-17-C-0015 |
| May 1, 2025 | A00042 | $0 | TRANSFER OF GFP TO N00019-17-C-0015 AND CHANGE OF PAYMENT OFFICE TO HQ0339 |
| Apr 8, 2025 | P00263 | $249.7K | THIS MODIFICATION IS PROVIDING FUNDING FOR USE OF INDIAN INCENTIVE. |
| Feb 16, 2024 | AB0038 | $0 | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Aug 24, 2022 | A00041 | $0 | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Dec 27, 2021 | AB0043 | $0 | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Jun 11, 2020 | A00040 | $0 | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Mar 23, 2020 | P00262 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REDUCE THE QUANTITY OF SLIN 0429AJ TO 1 BECAUSE OF AN OLD PART NUMBER AND TO ADD SLIN 0429AP AT A QUANTITY OF 3 OF THE NEW PART NUMBER. |
| Sep 25, 2019 | P00261 | $7.6M | V22 PRODUCTION |
| Sep 23, 2019 | A00039 | $-1.0M | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Jul 9, 2019 | A00038 | $0 | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Feb 1, 2019 | A00037 | $-15.6M | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Jan 18, 2019 | A00036 | $0 | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Sep 27, 2018 | A00035 | $-1.7M | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Sep 12, 2018 | A00034 | $-12.2M | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Apr 26, 2018 | A00033 | $0 | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Jan 26, 2018 | AB0042 | $0 | TRANSFER GFP FROM N00019-07-C-0001 VIA MOD AB0042 TO N00019-12-C-2001 VIA MOD AB0043. |
| Sep 27, 2017 | A00028 | $0 | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Sep 11, 2017 | A00027 | $-8.6M | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Jul 17, 2017 | P00260 | $0 | BOEING PENSION HARMONIZATION |
| Apr 26, 2017 | P00259 | $0 | UPDATE OF EXHIBIT D, REPLACING REVISION H WITH EXHIBIT D, REVISION J DATED 13 MARCH 2017. |
| Sep 28, 2016 | A00024 | $-1.9M | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Sep 16, 2016 | P00258 | $-4.1M | DE-OBLIGATION OF CANCELING FUNDS. |
| May 6, 2016 | P00257 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE PROP ROTOR GEARBOX (PRGB) COMPONENTS AS CONSIDERATION FOR THE TWO OVER-TORQUE PRGBS. |
| Sep 25, 2015 | A00022 | $-16.6M | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Aug 14, 2015 | A00019 | $0 | MV-22 AIRCRAFT - FY08 (LOT 12)* |
| Aug 12, 2015 | P00256 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE VSLED CONSIDERATION AND WITHHOLD VALUES ASSOCIATED WITH MV0253-MV0255 AND CV1047, AND INCORPORATE A NO COST RECORD PURPOSE, ECP V-22-0901R6. |
| Jun 11, 2015 | P00255 | $0 | THE REASON FOR THIS MODIFICATION IS TO EXTEND LINK PAYBACK AND DDMS PAYBACK POP, ADD AMC PAYBACK, UPDATE ATTACHMENT 11 TOOLING TRANSFER (IAI), INCORPORATE ECP V-22-1060 AND AN ADMINISTRATIVE CHANGE TO CLIN 0005 TO CORRECT AN ERROR MADE IN A PRIOR MOD. |
| May 11, 2015 | P00254 | $-99.4K | CREDIT FOR ONE AMC COMPUTER |
| Nov 5, 2014 | P00253 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE TEH FOLLOWING ECP V-22-1053 PSCN 289, ECP V-22-1054 PSCN 281 AND E-174, ECP V-22-1056 PSCN 205 AND V-22-095 TITLED "HYDRAULIC CARGO WINCH". |
| Sep 10, 2014 | P00252 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DECREASE THE SECTION B, CLIN 007 PRICE BY $41,131 THAT WAS MISTAKENLY OMITTED FROM P00251. ADDITIONALLY THIS MODIFICATION DELETES AND REPLACES THE PERFORMANCE BASED SCHEDULE FOR LOT 16. |
| Sep 4, 2014 | P00251 | $-41.1K | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE MONEY OFF OF CLIN 0007 IN THE AMOUNT OF $41,131 AND TO UPDATE EXHIBIT E TO REFLECT THE DELETION OF PART NUMBERS 000706775-4396 AND 00070677N-6140. |
| Sep 3, 2014 | P00250 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THE TRANSFER AND SUBSEQUENT PAYBACK OF 2 DDMS. |
| Aug 27, 2014 | P00249 | $-329.2K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE A NO COST PERIOD OF PERFORMANCE (POP) EXTENSION FOR CLIN 0105, MODIFY INSPECTION AND ACCEPTANCE CRITERIA FOR CLINS 0005 AND 0105, AND DEOBLIGATE FUNDING IN THE AMOUNT OF $329,174.70 FROM CLIN 0005 (ACRN AE). |
| Aug 5, 2014 | P00248 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE ATTACHMENT 11 AND INCORPORATE A H CLAUSE. |
| May 21, 2014 | P00247 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE PSCNS/ECPS, AND TO INCORPORATE H-30 CLAUSE ENTITLED "CONTINUATION OF H-18 POST DD-250 SUPPORT FOR CV-22 D1043 AT AMARILLO (APPLICABLE TO CLIN 0410). |
| May 9, 2014 | P00246 | $-5.2M | CREDIT ADJUSTMENTS TO PRODUCTION RATE TOOLING AND SPECIAL TEST EQUIPMENT |
| Apr 14, 2014 | P00245 | $0 | ADMINISTRATIVE MODIFICATION |
| Jan 9, 2014 | P00244 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP V-22-0973R1 (CRI 1907¿ SPECTRUM BREAKAWAY VALVE SECOND SOURCE), AND ECP V-22-1013R2 (CV-22 SUSTAINING SOFTWARE) INTO SECTION J, ATTACHMENT 6; INCORPORATE THE AGREEMENT BETWEEN THE GOVERNMENT AND BELL-BOEING PERTAINING TO THE LATE DELIVERY OF MV D0225; INCORPORATE V -22-D-L902 TITLED¿REXNORD SPINDLE BEARING¿ SLOD2098¿; AND DOCUMENT THE ASSOCIATED CONSIDERATION VIA INCORPORATION OF NOT-SEPARATELY PRICED (NSP) CLIN 0416. |
| Dec 11, 2013 | P00243 | $445.3K | ECP 1007, HELMET MOUNTED DISPLAY |
| Nov 27, 2013 | P00241 | $0 | FUNDING CHANGE |
| Nov 27, 2013 | P00242 | $0 | EXTEND CRI CLIN 0005 POP; INCORPORATE RECORD PURPOSE ECPS 1022&0990; INCORPORATION OF AGREEMENT B/T GOV AND BB PERTAINING TO THE LATE DELIVERY OF A/C MC D0220 AND CV D1041, ETC. |
| Nov 19, 2013 | P00240 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING: ECP V-22-1008 PSCNS 252, 261, 262, E-157, AND A-004; ECP V-22-1017 PSCNS 253, 270; ECP V-22-1023 PSCN 163; ECP V-22-1035 PSCNS 271, E-162, E-170, AND E-172; ECP V-22-1036 PSCN 279; AND ECP V-22-1039 PSCN 283; RFD V-22-D-M101 TITLED NOTICE OF ESCAPEMENT REGARDING HOLE PREPARATION ; RFD V-22-D-L898 TITLED CO-SITE VERTICAL TIP CAP RADOME INSTALLATION OPEN WORK ; ECP-V-22-0905 TITLED "LANDING GEAR CONTROL UNIT REDESIGN"; ECP-V-22-0906R1 TITLED FUEL JETTISON MMRR; FORWARD FIT AND RETROFIT ; ECP-V-22-1003 TITLED "ABRASION STRIP REDESIGN (CRI 1943)"; ECP-V-22-1012R1 TITLED "MV LOT 16 SOFTWARE UPDATE ; ECP-V-22-1032 TITLED "LRU-3 PART NUMBER ROLL"; AND TO INCORPORATE CONSIDERATION FOR LATE AIRCRAFT DELIVERY FOR AIRCRAFTS D0195, D0196, CV1036, D0199, D0200, CV1039, D0211, D0213, D0216, AND D0217. |
| Nov 6, 2013 | P00239 | $0 | EXTENSION TO THE NRE FOR THE HMX-1 EFFORT. |
| Oct 31, 2013 | P00238 | $0 | INCORPORATE ECP 0715R1 |
| Oct 22, 2013 | P00237 | $336.0K | FUND THE MISTAKE IN BID ON CLIN 0410 ASSOCIATED WITH ECP 901. |
| Sep 23, 2013 | P00236 | $0 | DEOBLIGATE CANCELLING FY 06 APN-1 FUNDS FROM CLIN 0012, OBLIGATE FY 12 APN-1 FUNDS IN PLACE |
| Sep 19, 2013 | P00234 | $521.3K | HMX PAINT LIGHTENING STRIKE |
| Sep 19, 2013 | P00235 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REVISE WITHHOLD RELEASE CRITERIA AND INCORPORATE ADDITIONAL CONSIDERATION LANGUAGE. |
| Sep 3, 2013 | P00233 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE ATTACHED DEVIATION/WAIVER AND DOCUMENT THE WITHHOLD VALUES AND CONSIDERATION ASSOCIATED. |
| Aug 5, 2013 | P00232 | $49.9K | THE PURPOSED OF THIS MODIFICATION IS TO INCORPORATE ECPV-22-0975, IRIDIUM ANTENNA INTO MYPI INCORPORATION. |
| Jul 11, 2013 | P00231 | $37.0K | THE PURPOSE OF THIS MODIFICATION IS INCORPORATE COR-BAN 35 RE&TROOP SEAT CHANGE/UPDATE. IN ADDITION THIS MODIFICATION ALSO DOCUMENTS WITHHOLD VALUES AND CONSIDERATION ASSOCIATED WITH DEVIATIONS L877, L878, L879, L880, L881, L882 AND L884. |
| Jul 1, 2013 | P00230 | $-4.5M | THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDS. |
| Jun 25, 2013 | P00229 | $439.5K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP-V-22-0888R1 PRODUCTION. |
| Jun 12, 2013 | P00228 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP V-22-0928 TITLED "CRI 735- DOWNSTOP INTERCOSTAL FITTING MATERIAL CHANGE", AND ECP V-22-0903R1 TITLED "INTEGRATED COCKPIT CENTER CONSOLE". |
| May 31, 2013 | P00227 | $43.9K | INCORPORATION OF ECP V-22-0901R2, SATCOM MODIFICATIONS |
| May 22, 2013 | P00226 | $-67.4K | THE PURPOSE OF THIS MODIFICATION IS TO REVISE SECTION B AND J AND INCORPORATE ECP 0938R1. |
| Apr 16, 2013 | P00225 | $-235.0K | PROCUREMENT OF MID WING AVIONICS UPGRADE FOR A/C D0253-D0255 AND A/C D1048 |
| Apr 8, 2013 | P00224 | $123.5K | INCORPORATE DSRA ECP 0582R1. |
| Apr 4, 2013 | P00223 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECT V-22-0734R1 |
| Apr 3, 2013 | P00222 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FOLLOWING; ECP V-22-1015 PSCNS 275, AND E-165; ECP V-22-0998 PSCNS E-147, E-148, E-149, E-150, E-151; AND ECP V-22-0949.1R1 PSCNS 268, E-133, AND E-160; ECP V-22-1024 PSCN E-167; AND ECP-V-22-1026 PSCN 185. THIS MODIFICATION ALSO INCORPORATES/DOCUMENTS RFD- V-22-D-L876 "NOTICE OF ESCAPEMENT REGARDING HOLE PREPARATION". |
| Mar 19, 2013 | P00221 | $238.6K | PRODUCTION CUT-IN |
| Mar 11, 2013 | P00220 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REMOVE EXHIBIT D IN ITS ENTIRETY AND REPLACE WITH ATTACHED EXHIBIT D WHICH ADMINISTRATIVELY CORRECTS THE MIS-ALIGNMENT OF STE/TOOLING TO CLINS 0004, 0104 AND 0204 AS WELL AS CORRECTS THE TOOL NUMBERS TO REFLECT THE CORRECT IDENTIFICATION. ADDITIONALLY, THIS MODIFICATION REVISES SECTION C AND SECTION F REQUIREMENTS ASSOCIATED WITH CLINS 0004, 0104 AND 0204; REVISES SECTION H, CLAUSE H-23,¿GOVERNMENT PROPERTY FOR THE PERFORMANCE OF THIS CONTRACT¿ TO ADD ONE ITEM OF SPECIAL TEST EQUIPMENT AND INCORPORATES RFD V-22-D-L872 (NOTICE OF ESCAPEMENT REGARDING HOLE PREPARATION). THIS REQUIREMENT IS BEING ACCOMPLISHED UNDER PID N00019-12-P7-PU037. |
| Mar 5, 2013 | P00219 | $0 | THE PURPOSE OF THIS MODIFICATION IS INCORPORATION OF ECP V-22-0989 AND RFD V-22-D-L871. |
| Feb 13, 2013 | P00218 | $0 | THE REASON FOR THIS MODIFICATION IT TO UPDATE SOFTWARE INSTRUCTIONS. |
| Feb 11, 2013 | P00217 | $0 | THE PURPOSE OF THIS MODIFICATION IS FOR THE INCORPORATION OF ECP-0978R1. |
| Feb 1, 2013 | P00216 | $437.2K | INCORPORATION OF ECP V-22-1010, LPIA HORN ANTENNA |
| Jan 28, 2013 | P00215 | $0 | EXHIBIT E |
| Jan 22, 2013 | P00214 | $-1.2M | DESCOPE&DEOBLIGATE TWO A/C FOR HMX GREENSIDE PAINTING, UPDATE SECTION F, UPDATE PBP SCHEDULE, UPDATE EVENT MATRIX, AND INCORPORATE BELL'S SB/SDB MASTER SUBK PLAN. |
| Dec 27, 2012 | P00213 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE H-18 CLAUSE DD-250 SUPPORT. |
| Dec 18, 2012 | P00212 | $569.4K | ADDITION OF MOV FOR V-22 LOT 15 AND 16 |
| Dec 17, 2012 | P00211 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADD ECP (ENGINEERING CHANGE PROPOSAL) V-22 1000 AND 1004. |
| Dec 7, 2012 | P00210 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DEVIATION L857 AND ECP 0986. |
| Nov 13, 2012 | P00209 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE ATTACHED DEVIATIONS/WAIVERS AND DOCUMENT THE WITHHOLD VALUES AND CONSIDERATION ASSOCIATED. |
| Nov 6, 2012 | P00208 | $0 | THE PURPOSE OF THIS MODIFICATION IT TO INCORPORATE THE FOLLOWING ENGINEERING CHANGE PROPOSALS (ECP) V-22-0974, V-22-0976, V-22-0993, V-22-0997, V-22-0998, V-22-1002, AND V-22-1005. |
| Oct 2, 2012 | P00207 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DEVIATION L852 AND DOCUMENT THE WITHHOLD VALUES AND CONSIDERATION ASSOCIATED. |
| Sep 27, 2012 | P00206 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE ATTACHED DEVIATIONS/WAIVERS AND DOCUMENT THE WITHHOLD VALUES ASSOCIATED. |
| Sep 26, 2012 | P00205 | $8.8M | RECURRING ENGINEERING (RE) FOR A DIFFERENT PAINT TO SUPPORT HMX.-1. |
| Sep 11, 2012 | P00204 | $-321.8K | INCORPORATION OF ECP-0935, APX-119 |
| Aug 30, 2012 | P00203 | $0 | CORRECT LOA AND ACRN FOR SLIN 000769 |
| Aug 14, 2012 | P00202 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DEVIATION/WAIVER V-22-D-L845 AND DOCUMENT THE WITHHOLD VALUES AND CONSIDERATION. |
| Aug 10, 2012 | P00201 | $-438.6K | INCORPORATION OF ECP 0866R1 |
| Jul 26, 2012 | P00200 | $1.6M | NON RECURRING ENGINEERING (NRE) FOR A DIFFERENT PAINT TO SUPPORT HMX-1. |
| Jun 22, 2012 | P00199 | $-5.3M | DEOBLIGATION OF EXCESS FUNDS. |
| Jun 21, 2012 | P00198 | $74.4M | PURCHASE OF ONE CV-22 SUPPLEMENTAL AIRCRAFT (COMBAT LOSS REPLACEMENT) |
| Jun 14, 2012 | P00197 | $0 | ADMINISTRATIVE MODIFICATION TO DE-OBLIGATE FUNDS FROM CV AND OBLIGATE AN EQUAL AMOUNT TO CV. |
| May 21, 2012 | P00196 | $0 | THE PURPOSE OF THIS MODIFICATION IS INCORPORATE AND DOCUMENT THE WITHHOLD VALUES AND CONSIDERATION ASSOCIATED WITH V-22-D-L838 TITLED "INTERMITTENT DE-CLUTTERING OF LPIA" |
| May 17, 2012 | P00195 | $5.7M | ECP 951 HYDRAULIC CARGO WINCH |
| Apr 27, 2012 | P00194 | $67.4K | TO INCORPORATE ECP 0938 |
| Apr 9, 2012 | P00193 | $0 | INCORPORATION OF NO COST ECPS V-22-0941, V-22-0982, V-22-0984, V-22-0988, V-22-0969. |
| Mar 7, 2012 | P00191 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP 978 AND ECP 979. |
| Mar 7, 2012 | P00192 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE DEVIATION/WAIVER V-22-D-L836 INTERMITTENT DE-CLUTTERING OF LPIA AND DOCUMENT THE WITHHOLD VALUES AND CONSIDERATION ASSOCIATED. |
| Mar 6, 2012 | P00190 | $0 | ECP 0890 |
| Mar 1, 2012 | P00189 | $86.6K | GRDP OBSOLESCENCE |
| Feb 24, 2012 | P00188 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ENGINEERING CHANGE PROPOSAL (ECP) 0907 AND ECP 0973. |
| Feb 23, 2012 | P00187 | $0 | THE PURPOSE OF THIS NO COST MODIFICATION IS TO MAKE ADMINISTRATIVE CHANGES TO THE VERSION OF P00176, DATED 12 DECEMBER 2011, THAT WAS IMPORTED INTO THE ELECTRONIC DOCUMENT ACCESS (EDA) SYSTEM WHICH IS AN ONLINE DOCUMENT ACCESS SYSTEM DESIGNED TO PROVIDE ACQUISITION RELATED INFORMATION FOR USE BY ALL OF THE DEPARTMENT OF DEFENSE. |
| Feb 15, 2012 | P00186 | $165.5K | PROCURE TWO FUSELAGE TRANSPORTATION FIXTURES |
| Feb 14, 2012 | P00185 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP 981 AND ECP 983. |
| Feb 8, 2012 | P00184 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP 0912R1&0913R1 |
| Jan 19, 2012 | P00182 | $0 | INCORPORATION OF NO COST ECPS V-22-0961, V-22-0883R1, V-22-0959, V-22-0966, AND V-22-0971. |
| Jan 19, 2012 | P00183 | $0 | INCORPORATE DEVIATION L823, L824, L834, L835 |
| Jan 18, 2012 | P00181 | $7.3M | THE PURPOSE OF THIS MODIFICATION IS TO EXECUTE UID IN LOT 16 IN ACCORDANCE WITH DFARS CLAUSE 252.211-7003 AND ATTACHMENTS 23 AND 24. |
| Jan 9, 2012 | P00180 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP 0911, ECP 0946 AND ECP 0956 |
| Dec 21, 2011 | P00179 | $3.6M | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE V-22-ECP-0901, BLOCK 20/C UPGRADES. |
| Dec 16, 2011 | P00178 | $3.2M | INCORPORATE ECP 847R1, BLOCK C PRODUCTION FOLLOW ON |
| Dec 12, 2011 | P00176 | $625.2K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP 0930 SIRFC SYSTEM MODIFICATION IMPROVED TRANSMIT ANTENNA AND ECP 0932 SIRFC ENHANCED RF SWITCH. |
| Dec 12, 2011 | P00177 | $0 | INCORPORATION OF DEVIATION V-22-D-L825 |
| Dec 8, 2011 | P00175 | $27.0K | FMU EEPLD OBSO. PART LOT BUY |
| Nov 28, 2011 | P00174 | $0 | INCORPORATION OF CRIS 772, 1809, AND TO UPDATE CDRLS. |
| Nov 23, 2011 | P00173 | $1.7B | LOT 16 MV FULL FUNDING |
| Nov 22, 2011 | P00172 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CREDIT SEVEN (7) DEU, DDMS, AND ADVANCED MISSION COMPUTER (AMC) SHIPSETS, FROM THE LOT 16 MV AIRCRAFTS S/NS D0249 THROUGH D0255. THE SEVEN SHIP SETS WILL BE REPLACED WITH THE INTEGRATED AVIONICS PROCESSOR (IAP) WHICH WAS AWARDED UNDER BOA N00019-07-G-0008 DO 0103 FOR NON-RECURRING ENGINEERING AND INCORPORATED AS ECP 0873 INTO N00019-07-C-0001. |
| Nov 14, 2011 | P00171 | $0 | INCORPORATION OF DEVIATIONS/WAIVERS V-22-D-L814,815,817,818,819,820 |
| Nov 10, 2011 | P00170 | $324.0M | LOT 16 CV FULL FUNDING |
| Oct 27, 2011 | P00168 | $-951 | UPGRADES TO DIRCM SYSTEM ON CV-22 AIRCRAFT |
| Oct 27, 2011 | P00169 | $0 | UPDATE ATTACHMENTS 6 AND 11 |
| Oct 3, 2011 | P00167 | $94.8K | ECP 0825 |
| Sep 26, 2011 | P00166 | $38.8K | REPLACEMENT OF DSIU-NOVRAM ECP 0942 |
| Sep 15, 2011 | P00165 | $92.4K | FDP/RFIS OBSOLETE PARTS BUY |
| Aug 29, 2011 | P00163 | $-7.0M | DEOBLIGATION OF $7M APN-1 FY09 FUNDS |
| Aug 29, 2011 | P00164 | $1.6M | ECP 922 CFG |
| Aug 24, 2011 | P00162 | $0 | ADMIN MOD TO INCOPORATE ECP 882R1 TO THE MULTI YEAR |
| Aug 19, 2011 | P00161 | $0 | ADMIN MOD TO DOCUMENT THE REMOVAL AND REPLACEMENT OF DRIVE LINK PINS AND CONSUMABLES FOR A/C D0141, AS COVERED UNDER H-18, "POST DD FORM 250 MAINTENANCE SUPPORT" |
| Aug 18, 2011 | P00160 | $0 | INC DEVIATION V-22-D-L808 AND DOCUMENT CONSIDERATION |
| Aug 1, 2011 | P00159 | $576.0K | PYLON CONVERSION ACTUATOR RELIABILITY IMPROVEMENTS |
| Jul 29, 2011 | P00158 | $0 | INC DEVIATION V-22-D-L-801 AND DOCUMENT CONSIDERATION |
| Jul 18, 2011 | P00157 | $0 | REVISE SUPPLIER NAMES ON ATTACHMENT E |
| Jul 7, 2011 | P00156 | $0 | TO EXTEND THE POP FOR CLINS 0005 AND 0105 |
| Jul 5, 2011 | P00154 | $-4.7K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP-V-22-0888 ENTITLED "INLET GUIDE VANE&UPSTREAM REGULATION". |
| Jul 5, 2011 | P00155 | $0 | INCORPORATION OF NO COST ECPS V-22-0902, ECP V-22-0916, ECP V-22-0943, ECP V-22-0948, ECP V-22-0953, AND ECP V-22-0955 |
| Jun 16, 2011 | P00153 | $-187.5K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP-V-22-0918 ENTITLED "V-22 VSLED AND FMU ALTERNATE OBSOLESCENCE SOLUTIONS." |
| Jun 10, 2011 | P00152 | $0 | TO INCORPORATE -13 MISSILE WARNING SYSTEM IN THE DIRCM AND INCORPORATE ECP-0931 TO DOCUMENT THE SIRFC LRU-1 PART NUMBER ROLL. |
| Jun 9, 2011 | P00151 | $0 | INCORPORATE NLG DEVIATION/WAIVER AND MODIFY H-7 TRANSPORTATION OF FUSELAGE CLAUSE |
| Jun 3, 2011 | P00150 | $874.6K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP-V-22-0906 ENTITLED "FUEL JETTISON MISSION MANAGEMENT RESTRICTION REMOVAL" |
| May 25, 2011 | P00149 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP V-22-0873 INTEGRATED AVIONICS PROCESSOR (IAP) INTO PRODUCTION LOT 16 AIRCRAFTS D0249, D0250, D0251, D0252, D0253, D0254, AND D0255. |
| May 23, 2011 | P00148 | $53.6K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP-0917 NACELLE DOOR HOOK AND LATCHES FOR 30 MV AND 5 CV LOT 15 AIRCRAFT, 30 MV AND 5 CV LOT 16 AIRCRAFT, MV SUPPLEMENTAL AIRCRAFT (D0240), AND 2 CV VIQ AIRCRAFT (D1038 AND D1042). |
| May 13, 2011 | P00147 | $0 | UPDATE TO VARIOUS PBP EVENT MATRICES AND THE LOT 14 PBP SCHEDULE |
| May 11, 2011 | P00146 | $1.1K | INCORPORATE ECP 869, NLG, INTO PRODUCTION OF LOT 16 |
| Apr 27, 2011 | P00145 | $359.5K | INCORPORATION OF ECP-0934 CRASH POSITION INDICATOR |
| Apr 25, 2011 | P00143 | $5.5M | THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE RATE TOOLING BY DELETING THOSE TOOLING PARTS DETERMINED NO LONGER REQUIRED FOR THIS EFFORT AND ADDING NEW TOOLING PARTS TO REFLECT THE MAX CAPACITY OF 41 AIRCRAFT REQUIREMENT. ACCORDINGLY, FUNDING FOR CLIN 0004 IS DE-OBLIGATED; FUNDING FOR CLINS 0104 AND 0204 ARE OBLIGATED; AND EXHIBIT D AND SECTION J, ATTACHMENT 12 ARE REVISED. |
| Apr 25, 2011 | P00144 | $0 | INCORPORATION OF NO COST ECPS V-22-0936&V-22-0925 |
| Mar 24, 2011 | P00142 | $156.4K | OBSOLETE PROCUREMENT BUY. |
| Mar 17, 2011 | P00141 | $1.2M | ENGINEERING CHANGE PROPOSAL 750: ADMINISTRATIVE CONTRACTING ACTION TO PURCHASE THE NEWLY REDESIGNED PLANETARY SUPPORT BEARING. |
| Feb 14, 2011 | P00140 | $0 | INCORPORATE ECP 899, IMPROVED LIFE SLIP RING |
| Feb 8, 2011 | P00139 | $0 | UPDATE PBP SCHEDULES FOR LOTS 15&16 |
| Jan 4, 2011 | P00138 | $0 | INCORPORATE VARIOUS PSCN'S |
| Dec 2, 2010 | P00137 | $49.5K | INCORPORATE ECP V-22-0669R1, MAIN LANDING GEAR (MLG) DOOR HINGE REDESIGN. |
| Dec 1, 2010 | P00136 | $0 | REVISE EFFECTIVITIES FOR ECP'S 886&907 |
| Nov 29, 2010 | P00135 | $0 | INCORPORATE ECP 862 |
| Nov 24, 2010 | P00134 | $0 | DOCUMENT POST-DD250 PRGB EFFORT |
| Nov 22, 2010 | P00133 | $331.0M | FULLY FUND FY11 CV LOT 15 AIRCRAFT AND PROVIDE LONG LEAD FUNDING FOR CV LOT 16 AIRCRAFT |
| Nov 15, 2010 | P00131 | $0 | INCORPORATE ECPS V-22-0912 AND V-22-0913. |
| Nov 15, 2010 | P00132 | $0 | PROVIDE PART NUMBERS IN ADVANCE OF THE PROD A/C |
| Nov 2, 2010 | P00130 | $0 | DOCUMENT POST-DD250 PRGB EFFORT |
| Oct 28, 2010 | P00129 | $1.7B | FULLY FUND FY11 MV LOT 15 AIRCRAFT AND PROVIDE LONG LEAD FUNDING FOR MV LOT 16 AIRCRAFT |
| Oct 22, 2010 | P00128 | $318.7K | THE PURPOSE OF THIS MODIFICATION IS TO PERFORM A BRIDGE BUY FOR THE ADVANCED MISSION COMPUTER (AMC). |
| Oct 13, 2010 | P00127 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REVISE AND REPLACE ATTACHMENT 22, OBSOLESCENCE BRIDGE BUY/LIFE OF TYPE BUY PART ¿ PERFORMANCE BASED MILESTONE PLAN AND PERFORMANCE BASED PAYMENT SCHEDULE EVENT MATRIX, WITH THE LASTEST ATTACHMENT 22 DATED 09-09-10. |
| Oct 1, 2010 | P00126 | $470 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT SECTION G OF MODIFICATION P00124. |
| Sep 28, 2010 | P00125 | $0 | ECP 0848 |
| Sep 24, 2010 | P00124 | $44.2K | THE PRUPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP V-22-0894, NIGHT VISION GOGGLES/HEADS-UP DISPLAY (NVG/HUD) SIGNAL DATA CONVERTER (SDC) SOFTWARE VERSION 1.20 INTO PRODUCTION MV AND CV AIRCRAFT. |
| Sep 21, 2010 | P00123 | $0 | INCORPORATE A DEVIATION FOR CSU TICKING NOISE |
| Sep 20, 2010 | P00122 | $-58.1K | CREDIT TO MY CONTRACT FOR ASIC REPLACEMENT IN BFCU UNIT ON AIRCRAFT |
| Sep 17, 2010 | P00121 | $0 | INCORPORATE MULTIPLE PSCN CHANGES. |
| Sep 14, 2010 | P00120 | $0 | REPLACE ATTACHMENT 11 |
| Sep 8, 2010 | P00119 | $0 | UPDATING/REVISING CDRLS B00B, B00C, C001 AND F004 |
| Sep 7, 2010 | P00118 | $0 | INCORPORATE ECP V-22-0904 (CRI 1824). |
| Aug 31, 2010 | P00116 | $-20.5K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE A NO COST ENGEERING CHANGE PROPOSAL ECP V-22-0854R2. |
| Aug 31, 2010 | P00117 | $497.0K | TO PERFORM A LIFE OF TYPE BUY FOR OBSOLETE EEPROM, AVSS, DEWD AND BFWS PARTS |
| Aug 26, 2010 | P00115 | $0 | FLAPERON ACTUATORS |
| Aug 23, 2010 | P00114 | $-11.4M | REMOVE SECOND SOURCING REQUIREMENT FOR TRANSMISSION ADAPTER CASTING |
| Aug 18, 2010 | P00113 | $0 | UPDATE AND REDUCTION OF PDTM FOR V-22. |
| Aug 16, 2010 | P00112 | $493.9K | THE PURPOSE OF THIS MODIFICATION IS TO PERFORM A LIFE OF TYPE BUY FOR OBSOLETE CMAC DIE PART. |
| Aug 12, 2010 | P00111 | $0 | INCORPORATE NO COST CRI 1816 ECP 0907 |
| Jul 29, 2010 | P00110 | $99.9K | PURCHASE OF OBSOLETE COMPONENTS FOR THE DEU II/ DDMS. |
| Jul 16, 2010 | P00109 | $0 | INCORPORATE ECP 0853R1. |
| Jul 15, 2010 | P00107 | $0 | INCORPORATE CRI |
| Jul 15, 2010 | P00108 | $0 | REQUEST FOR DEVIATION 727 |
| Jul 13, 2010 | P00106 | $12.2M | DEU DDMS, DDMS RMU, ADU, TCAS & SLIM MFD OBSOLESCENCE BUYS |
| Jun 30, 2010 | P00105 | $500.7K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP V-22-0846, ICE PROTECTION SYSTEMS |
| Jun 22, 2010 | P00104 | $0 | ECP 0890 |
| Jun 7, 2010 | P00103 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE NO COST ENGINEERING CHANGE PROPOSAL ECP V-22-0854R1. |
| Jun 1, 2010 | P00102 | $0 | MOD TO INCORPORATE REVISED PBP'S |
| May 27, 2010 | P00101 | $0 | CORRECTION TO UNIT PRICE CLARIFICATION TABLES AND OTHER ADMINISTRATIVE CHANGES |
| May 24, 2010 | P00100 | $0 | PROVIDE CONSIDERATION FOR DEVIATIONS L702, L714, AND L725. |
| May 19, 2010 | P00099 | $0 | CORRECTION TO CLIN 0010 UNIT PRICE CLARIFICATION TABLE |
| May 18, 2010 | P00098 | $0 | INCORPORATION OF NO-COST DEVIATION |
| May 17, 2010 | P00097 | $0 | REQUEST FOR DEVIATION 709 |
| May 10, 2010 | P00095 | $0 | ATTACH CORRECT ATTACHMENT 6 TO P00094. |
| May 10, 2010 | P00096 | $121.4K | AVSS EFG FORWARD FIT V-22 MYP |
| May 4, 2010 | P00094 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP V-22-0895, THE INTERCONNECTIING DRIVE SHAFT BEARING SUPPORT ASSEMBLY UNIT INTO THE CONTRACT. |
| May 3, 2010 | P00092 | $10.1K | TO INCORPORATE ECP-V-22-0865 RAPID GROUND REFUELING (RGR) ELECTRICAL CONNECTION INTO LOTS 15, 16, AND SUPPLEMENTAL AIRCRAFT. |
| May 3, 2010 | P00093 | $0 | INCORPORATION OF ECPS 0870 AND 0880 |
| Apr 28, 2010 | P00091 | $0 | MISSION KIT SHIP TO ADDRESSES ADDED |
| Apr 20, 2010 | P00090 | $0 | TO INCORPORATE ECP V-22-0883- PSCNS 178, 179, 180, 181, 183, E-84 AND E-101-BLOCK 20 INCREMENT 3; ECP V-22-0891- PSCN 208: REMOVE TRL #92, FROM TABLE 17, TAILORED REQUIREMENTS LIST; ECP V-22-0892- PSCN 191: ADD CASTING MATERIAL ALTERNATIVE SPECIFICATION; ECP V-22-0893- PSCN 195: SD 572-1-3 V-22 DETAIL SPECIFICATION- ACCESSIBILITY OF ELECTRONIC EQUIPMENT; AND ECP V-22-0896- PSCN 94: PROPERTIES FOR STRUCTURAL DESIGN, ECP V-22-0898- PSCN 161: SAFE & PSCN 167: BLADE FOLD GROUND GUST AND ECP V-22-0875, CRI 1720: MAINTAINER DOOR MATERIAL CHANGE. |
| Apr 8, 2010 | P00089 | $-5.7K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP 0878 CDD INTERIM FIX. |
| Mar 15, 2010 | P00088 | $0 | TO INCORPORATE ECP V-22-0886 CRI 772 - REDESIGN THE WING FENCE UTILIZING COMPRESSION MOLDED PROCESS, AND ECP V-22-0871 - SWASHPLATE IMPROVEMENT. |
| Mar 5, 2010 | P00087 | $117.4M | FY08 MV-22 SUPPLEMENTAL AIRCRAFT (QTY OF 2) |
| Mar 3, 2010 | P00086 | $0 | CORRECT COST/PROFIT TOTALS FROM P00098; DOES NOT CHANGE TOTAL CONTRACT VALUE |
| Feb 18, 2010 | P00085 | $0 | NO-COST MODIFICATION TO INCORPORATE ECP-744R1 MISSION KITS |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.