Federal contract award

N0001912C0112

P-8A FRP LOT I LONG LEAD MATERIAL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeDCMA FIXED WING PUGET SOUND
NAICS336411 — Aircraft Manufacturing
PSC1510 — Aircraft, Fixed Wing
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE INCENTIVE
Obligations$5.5B
Current contract value$5.6B
Potential contract value / ceiling$5.6B
Start dateAug 31, 2012
Current end dateJan 7, 2022
Potential end dateJan 7, 2022
Latest award activityJun 3, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 353 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 3, 2026A00072$0P8 LRIP. MOD ISSUED TO PROVIDE DISPOSITION INSTRUCTIONS FOR GFP ACCOUNTABILITY.
Oct 17, 2025A00055$0UNDEFINITIZED ORDER
Oct 17, 2025A00066$0UNDEFINITIZED ORDER
Oct 15, 2024ARZ996$0P-8A FRP LOT I LONG LEAD MATERIAL
Apr 2, 2024A00151$-161.3KP-8A FRP LOT I LONG LEAD MATERIAL
Nov 7, 2023A00150$0P-8A FRP LOT I LONG LEAD MATERIAL
Dec 21, 2022A00149$0PROPERTY TRANSFER MOD.
Dec 16, 2022P00203$-35.0KMODIFICATION TO DEOBLIGATE CANCELED FUNDS UNDER SLINS 1050AJ AND 1051AA.
Oct 24, 2022A00148$-12.0MP-8A FRP LOT I LONG LEAD MATERIAL
Sep 23, 2022P00202$-20.2KDECREASES THE COST OF CLIN 0108 BY $20,198.32 AND DEOBLIGATES THAT SAME AMOUNT FROM CLIN 0108
Sep 1, 2022A00147$0GFP TRANSFER MOD.
Aug 25, 2022A00146$0GFP TRANSFER MODIFICATION.
Aug 24, 2022P00201$-104.0KDESCOPE OF SPARES NO LONGER REQUIRED AS THEY HAVE BECOME OBSOLETE AND RESULTING DEOBLIGATION OF ASSOCIATED FUNDS.
Jun 29, 2022P00200$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECPS 809-06066, 809-06214 AND 809-06254 INTO ATTACHMENT (26).
Jun 6, 2022P00199$-206.8KTHE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS AS RESULT OF A DR DESCOPE, UPDATE ATTACHMENT 106, AND TO ADD ATTACHMENT 134.
Dec 9, 2021P00197$-12.2KTHE PURPOSE OF THIS MODIFICATION IS TO REDUCE THE QUANTITY OF CLIN 0039AX FROM 2 TO 1 AND DE-OBLIGATE THE ASSOCIATED FUNDING IN THE AMOUNT OF $12,201.00.
Sep 16, 2021P00196$-3.1MDEOBLIGATING EXCESS FUNDS TO REDUCE THE ASSOCIATED COSTS FOR CLINS 0121, 0128, AND 0500 AS THE EFFORTS HAVE BEEN FULLY COMPLETED.
Jul 13, 2021P00195$0THIS NO CHANGE IN PRICE MODIFICATION REVISES THE SHIPPING INFORMATION IN SECTION E FOR CLINS 0001 & 0101.
May 19, 2021P00194$0REVISES DELIVERY DATES FOR MCW B-KITS UNDER CLINS 0001 AND 0101 PUTTING 0101 DELIVERIES IN FRONT OF 0001 DELIVERIES TO ENABLE DELIVERY, INSPECTION, ACCEPTANCE, INVOICING AND PAYMENTS UNDER 0101 TO OCCUR PRIOR TO EXPENDITURE EXPIRATION OF 0101 FUNDING
Jan 27, 2021P00193$0EXTEND PERIOD OF PERFORMANCE FOR 5 CHANGE PROPOSALS UNDER CLIN 0101.
Jan 21, 2021P00192$7.6MADD FUNDING TO CLIN 0001 IN SUPPORT OF LRIP IV AIRCRAFT EFFORT THAT HAD NOT COMPLETED PRIOR TO CURRENT CONTRACTUAL FUNDS CANCELING. INCORPORATES FAR 52.204-25 AND DFARS 252.204-7018 INTO SECTION I.
Sep 23, 2020P00191$-15.9MCLIN 0001 AND 0022 DE-OB.
Sep 16, 2020P00190$0LOT 4 FFP CLIN CONVERSION FOR CLINS 0001 AND 0022.
Aug 27, 2020A00145$-1.1MP-8A FRP LOT I LONG LEAD MATERIAL
Jul 27, 2020P00189$-2.2MDE-OBLIGATE EXCESS FUNDS UNDER CLIN 0021.
Jul 8, 2020P00188$0UPDATED DELIVERY SCHEDULE
Jun 23, 2020ARZ999$0P-8A FRP LOT I LONG LEAD MATERIAL
Jun 10, 2020A00144$0P-8A FRP LOT I LONG LEAD MATERIAL
May 27, 2020P00187$0EXTEND THE PERIOD OF PERFORMANCE ON CLIN 0001 FOR EO/IR FROM 01 JUNE 2020 TO 31 JULY 2020.
May 21, 2020P00186$0THIS ADMIN MOD ADDS SLIN107203, UPDATES ATTACHMENT 17,18,19,20,21 AND 22, AND EXTEND THE DELIVERY DATE FOR SLIN 1054 AD.
Apr 9, 2020P00185$-8.0MTHE PURPOSE OF THIS CONTRACT MODIFICATION IS TO DE-OBLIGATE FUNDS RESULTING FROM A PARTIAL TERMINATION FOR CONVENIENCE.
Mar 5, 2020P00184$0UPDATING DATES IAW COA 2.
Jan 24, 2020P00183$0THE PURPOSE OF THIS ACTION IS TO DOCUMENT THE CORRECT ACRN LISTED FOR CLIN 107202.
Sep 26, 2019P00182$143.5KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CHANGE PROPOSAL (CP) 809-05553 OPTICAL SENSOR CAPABILITY (AFT EO/IR, CP 809-05179 RIU WIRING TO THE P5-56 PANEL TO INDICATE MOTMS/POD POWER, CP 809-05450 AAS A-KIT AND AIRCRAFT UPDATES AND (CP) 809-05238 DRY BAY FIRE PROTECTION SYSTEM UPGRADE INTO P-8A LOTS 4-5 AIRCRAFT.
Aug 30, 2019P00181$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE EO/IR LOTS 4-5.
Aug 22, 2019P00180$0ADMINISTRATIVE MODIFICATION - EXTENDING DELIVERY AND POP DATES FOR SEVERAL CLINS.
Jul 31, 2019P00179$7.5MCORRECTION OF DEFICIENCY NOTED AT TIME OF ACCEPTANCE. 6TH MCWS
Jul 11, 2019P00178$555.6KTHIS MODIFICATION INCREASES COST AND OBLIGATES FUNDING ON CLIN 0110 BY $555,603.22. IN ADDITION, THE POP WAS EXTENDED FROM 15 OCTOBER 2015 TO 14 JUNE 2020.
May 15, 2019P00177$0IGF::OT::IGF THIS ADMIN MOD INCORPORATES MULTIPLE DATE CHANGES ASSOCIATED WITH WITHHOLD LETTERS.
Apr 17, 2019P00176$0IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO UPDATE CDRL DELIVERY REQUIREMENTS FOR EXHIBIT A CDRL A00P AND EXHIBIT D CDRL D00P.
Apr 8, 2019A00143$0P-8A FRP LOT I LONG LEAD MATERIAL
Mar 28, 2019P00175$-3.9MTHE GOVERNMENT IS REMOVING OBSOLETE SPARE PARTS AND ADDING THEIR REPLACEMENTS THAT RESULTED IN A DE-OBLIGATION OF FUNDS.
Mar 4, 2019A00142$0P-8A FRP LOT I LONG LEAD MATERIAL
Nov 28, 2018A00140$0P-8A FRP LOT I LONG LEAD MATERIAL
Nov 14, 2018A00141$0P-8A FRP LOT I LONG LEAD MATERIAL
Oct 25, 2018P00174$0ADMINISTRATIVE MOD
Oct 5, 2018P00173$0UPDATE DELIVERY ADDRESS FOR ATTACHMENT 29.
Sep 26, 2018P00172$0ELECTRO OPTICAL INFRARED MODIFICATION
Sep 6, 2018A00139$0P-8A FRP LOT I LONG LEAD MATERIAL
Aug 9, 2018P00171$0CLAUSE UPDATE
Jul 25, 2018P00170$-122.3KTHIS MODIFICATION IS TO DE-OBLIGATE $122,321.65 OF FUNDING FROM CLIN 0108, AND EXTEND THE PERIOD OF PERFORMANCE THROUGH 30 AUGUST 2018.
Jun 27, 2018A00137$0P-8A FRP LOT I LONG LEAD MATERIAL
Jun 15, 2018A00136$0P-8A FRP LOT I LONG LEAD MATERIAL
Jun 15, 2018A00138$0P-8A FRP LOT I LONG LEAD MATERIAL
May 23, 2018A00135$0P-8A FRP LOT I LONG LEAD MATERIAL
Apr 30, 2018P00169$0THIS MODIFICATION CHANGES SECTION F REGARDING THE INCORPORATION OF ECP-CP-809-04785A (6TH MISSION CREW WORK STATION FORWARD FIT AND RETROFIT) A-KITS ON SIXTEEN FRP I P-8A AIRCRAFT; MORE SPECIFICALLY, ALL THOSE AIRCRAFT WILL BE MADE AVAILABLE TO THE CONTRACTOR NLT 28 JANUARY 2021, INSTEAD OF 28 JANUARY 2020, IN ORDER TO SUPPORT THE PERIOD OF PERFORMANCE.
Apr 26, 2018P00168$0UPDATE ATTACHMENT 29
Apr 16, 2018P00167$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP-CP-809-04785A (6TH MISSION CREW WORK STATION FORWARD FIT AND RETROFIT) A-KITS INTO PREVIOUSLY DELIVERED LOTS LRIP IV (LOT 4) AND FRP I (LOT 5) AIRCRAFT. IMPLEMENTATION OF THE ECP IS A CORRECTION OF DEFICIENCY. THIS IS ONLY PARTIAL IMPLEMENTATION OF THE ECP AS TO THE LRIP IV (LOT 4) AND FRP I (LOT 5) LOTS 4 AND 5 AIRCRAFT BECAUSE IT DOES NOT INCLUDE THE 6TH MISSION CREW WORKSTATION B-KITS.
Mar 29, 2018A00134$0P-8A FRP LOT I LONG LEAD MATERIAL
Feb 9, 2018A00132$0P-8A FRP LOT I LONG LEAD MATERIAL
Feb 8, 2018A00133$0P-8A FRP LOT I LONG LEAD MATERIAL
Jan 29, 2018P00166$0THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO UPDATE THE CURRENT ATTACHMENT 11, P-8A 0112 SPARES DATED 1 DECEMBER 2016 TO ATTACHMENT 11, P-8A SPARES DATED 09 JANUARY 2018 AND TO CHANGE THE DELIVERY ADDRESS FOR CLIN 0039BP.
Jan 18, 2018P00165$0THE PURPOSE OF THIS NO CHANGE IN PRICE MODIFICATION IS TO EXTEND THE CLIN 0051 PERIOD OF PERFORMANCE TO 30 MARCH 2018.
Dec 14, 2017P00164$0THE PURPOSE OF THIS NO-COST ADMINISTRATIVE MODIFICATION IS TO REMOVE AND REPLACE EXHIBIT J, CDRL J001 TO REFLECT THE ADDITION OF SPECIALLY NEGOTIATED LICENSE AGREEMENT LANGUAGE.
Nov 30, 2017A00131$0P-8A FRP LOT I LONG LEAD MATERIAL
Nov 15, 2017P00163$0LAPTOP PART NUMBER UPDATE FOR EWSO 6TH SENSOR ADDITION
Sep 27, 2017P00162$2.9MDEFINITIZATION OF ELECTRONIC SECURITY SYSTEM.
Sep 25, 2017P00161$5.9MINCORPORATION OF PCU15 MISTAKE IN BID.
Sep 22, 2017P00160$165.7KFMS FUNDING ON CLIN 1079 AND ADMINISTRATIVE MOD TO UPDATE CONTRACT SECTIONS B,C,E,F&J.
Aug 18, 2017A00128$0P-8A FRP LOT I LONG LEAD MATERIAL
Aug 18, 2017A00129$0P-8A FRP LOT I LONG LEAD MATERIAL
Aug 8, 2017P00159$0ADMIN TO CORRECT SECTION J DATES
Aug 7, 2017P00158$0LOT 4 EWSP 6TH SENSOR
Jul 24, 2017P00157$0REMOVE 22 KGV-135A CRYPTO MODULES FROM ATTACHMENT 7 THEN TRANSFER TO THE N00019-14-C-0067 CONTRACT.
Jul 3, 2017A00127$0P-8A FRP LOT I LONG LEAD MATERIAL
Jun 28, 2017P00156$0FQPU/SPDS RETROFITS
Jun 26, 2017A00126$0P-8A FRP LOT I LONG LEAD MATERIAL
May 5, 2017A00125$0P-8A FRP LOT I LONG LEAD MATERIAL
Apr 18, 2017A00124$0P-8A FRP LOT I LONG LEAD MATERIAL
Apr 5, 2017A00123$0P-8A FRP LOT I LONG LEAD MATERIAL
Mar 30, 2017A00122$0P-8A FRP LOT I LONG LEAD MATERIAL
Mar 30, 2017P00155$0CLIN 0006 POP EXTENSION FROM 30 APRIL 2017 TO 30 APRIL 2018.
Mar 22, 2017P00154$3.2MCLS EXTENSION
Mar 9, 2017P00153$0UPDATE TO ATTACHMENT 26 - PRR MASTER LIST
Mar 7, 2017P00152$439.1KRAAF ENGINE PROCUREMENT
Feb 17, 2017A00121$0P-8A FRP LOT I LONG LEAD MATERIAL
Feb 15, 2017A00119$0P-8A FRP LOT I LONG LEAD MATERIAL
Feb 15, 2017A00120$0P-8A FRP LOT I LONG LEAD MATERIAL
Feb 10, 2017A00116$0P-8A FRP LOT I LONG LEAD MATERIAL
Feb 10, 2017A00118$0P-8A FRP LOT I LONG LEAD MATERIAL
Feb 2, 2017A00117$0P-8A FRP LOT I LONG LEAD MATERIAL
Feb 1, 2017A00115$0P-8A FRP LOT I LONG LEAD MATERIAL
Feb 1, 2017P00151$0UPDATE TO ATTACHMENT 26 - PRR LIST
Jan 30, 2017A00114$0P-8A FRP LOT I LONG LEAD MATERIAL
Jan 19, 2017A00113$0P-8A FRP LOT I LONG LEAD MATERIAL
Jan 18, 2017A00112$0P-8A FRP LOT I LONG LEAD MATERIAL
Jan 13, 2017A00109$0P-8A FRP LOT I LONG LEAD MATERIAL
Jan 13, 2017A00110$0P-8A FRP LOT I LONG LEAD MATERIAL
Jan 11, 2017A00111$0P-8A FRP LOT I LONG LEAD MATERIAL
Jan 5, 2017P00150$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE NIINS/SLINS, DELIVERY AND STOCK POINT LOCATIONS, AND ATTACHMENT 11 FOR APPLICABLE ITEMS.
Dec 23, 2016P00149$0REMOVE AND REPLACE ATTACHMENT 26
Dec 21, 2016A00099$0P-8A FRP LOT I LONG LEAD MATERIAL
Dec 20, 2016A00108$0P-8A FRP LOT I LONG LEAD MATERIAL
Dec 19, 2016A00107$0P-8A FRP LOT I LONG LEAD MATERIAL
Dec 16, 2016A00106$0P-8A FRP LOT I LONG LEAD MATERIAL
Dec 12, 2016P00147$0ADMIN MOD TO UPDATE FOB FOR CLIN 1060.
Dec 12, 2016P00148$311.3KTHE PURPOSE OF THIS MODIFICATION IS TO EXTEND DDMC SUPPORT OF P-8A AIRCRAFT BY 4 MONTHS FROM 16 DEC 2016 TO 15 APRIL 2017.
Dec 5, 2016A00103$0P-8A FRP LOT I LONG LEAD MATERIAL
Dec 5, 2016A00104$0P-8A FRP LOT I LONG LEAD MATERIAL
Dec 5, 2016A00105$0P-8A FRP LOT I LONG LEAD MATERIAL
Dec 2, 2016A00102$0P-8A FRP LOT I LONG LEAD MATERIAL
Nov 30, 2016A00101$0P-8A FRP LOT I LONG LEAD MATERIAL
Nov 29, 2016A00100$0P-8A FRP LOT I LONG LEAD MATERIAL
Nov 23, 2016P00146$2.8MRAAF LONG LEAD SPARES
Nov 17, 2016P00145$0THE PURPOSE OF THIS MODIFICATION IS UPDATE ATTACHMENT 26 FOR CP 809-03422 REV B, PRR 809-05214, AND CP 809-05351.
Nov 15, 2016A00098$0P-8A FRP LOT I LONG LEAD MATERIAL
Nov 15, 2016P00144$0[PID N00019-17-NORFP-PMA-290-0163] THIS NO CHANGE IN PRICE MODIFICATION RENAMES THE SYSTEM SAFETY HAZARD ANALYSIS CDRL D010 REFERENCED IN P00141 TO CDRL D011 SINCE CDRL D010 WAS ALREADY ON CONTRACT AS A PART OF P00111. THIS MODIFICATION ALSO UPDATES THE ATTACHMENT 5 - STATEMENT OF WORK TO REFLECT THE REVISED CDRL NUMBER.
Nov 14, 2016A00097$0P-8A FRP LOT I LONG LEAD MATERIAL
Nov 10, 2016A00096$0P-8A FRP LOT I LONG LEAD MATERIAL
Nov 10, 2016P00143$0POP EXTENSION
Nov 3, 2016A00095$0P-8A FRP LOT I LONG LEAD MATERIAL
Oct 25, 2016A00094$0P-8A FRP LOT I LONG LEAD MATERIAL
Oct 20, 2016A00093$0P-8A FRP LOT I LONG LEAD MATERIAL
Oct 17, 2016P00142$0THE PURPOSE OF THIS NO COST MODIFICATION IS TO REVISE AND REPLACE ATTACHMENT 26 (PRODUCT REVISION RECORDS MASTER LIST)TO INCORPORATE ADDITIONAL NO COST CPS/PRRS.
Oct 13, 2016P00141$0[PID N00019-16-NORFP-PMA-290-0896] INVOKING DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE CLAUSE, DFARS 252.227-7027, THIS NO CHANGE IN PRICE MODIFICATION ADDS CDRL D010 DATED 26 SEPTEMBER 2016 TO EXHIBIT D AND ADDS PARAGRAPH 3.1.6.4 TO THE ATTACHMENT 5 - STATEMENT OF WORK DATED 22 SEPTEMBER 2016.
Oct 7, 2016A00092$0P-8A FRP LOT I LONG LEAD MATERIAL
Oct 6, 2016A00090$0P-8A FRP LOT I LONG LEAD MATERIAL
Oct 6, 2016A00091$0P-8A FRP LOT I LONG LEAD MATERIAL
Oct 5, 2016A00089$0P-8A FRP LOT I LONG LEAD MATERIAL
Oct 5, 2016P00140$0THE PURPOSE OF THIS MODIFICATION IS TO REVISE AND REPLACE ATTACHMENT 26 TO INCORPORATE (CP 809-05245, CP 809-03871, CP 809-05168, CP 809-05114, AND CP 809-04734) THAT NEEDED TO BE ADDED TO THE AIRCRAFTS WITH AN AGREEMENT BETWEEN PARTIES.
Oct 3, 2016A00088$0P-8A FRP LOT I LONG LEAD MATERIAL
Sep 29, 2016A00086$0P-8A FRP LOT I LONG LEAD MATERIAL
Sep 29, 2016A00087$0P-8A FRP LOT I LONG LEAD MATERIAL
Sep 29, 2016P00139$8.4MP8 AC AND MTDS SPARES FOR FY16. IGF::OT::IGF
Sep 27, 2016P00138$13.3M6TH SENSOR ADDITION FOR LOT 5 P-8A AIRCRAFT.
Sep 16, 2016P00137$1.3MOBIGGS ASM ENDURANCE TESTING AND SERVICE LIFE EXTENSION RECOMMENDATION.
Sep 12, 2016A00084$0P-8A FRP LOT I LONG LEAD MATERIAL
Sep 12, 2016A00085$0P-8A FRP LOT I LONG LEAD MATERIAL
Sep 12, 2016P00136$0THE PURPOSE OF THIS MODIFICATION IS TO REVISE AND REPLACE ATTACHMENT 26 TO INCORPORATE CP 809-05084 FOR YP033-YP052 AND ADD THE DELIVERY LOCATION FOR THE ASSOCIATED KIT AT NO COST TO THE GOVERNMENT.
Sep 9, 2016A00083$0P-8A FRP LOT I LONG LEAD MATERIAL
Sep 8, 2016A00082$0P-8A FRP LOT I LONG LEAD MATERIAL
Aug 31, 2016A00081$0P-8A FRP LOT I LONG LEAD MATERIAL
Aug 23, 2016A00080$0P-8A FRP LOT I LONG LEAD MATERIAL
Aug 23, 2016P00135$0THE PURPOSE OF THE NO-COST ADMIN MODIFICATION IS TO MODIFY CDRL A00J TO MAKE THE JUNE 2016 SUBMITTAL THE LAST FORMAL DELIVERY.
Aug 15, 2016P00134$0IGF::OT::IGF THE PURPOSE OF THIS NO-COST BILATERAL ADMINISTRATIVE MODIFICATION IS TO REMOVE AND REPLACE ATTACHMENT (11) TO CHANGE THE QUANTITY OF SLIN 0039BM FROM 9 TO 8.
Aug 8, 2016A00077$0P-8A FRP LOT I LONG LEAD MATERIAL
Aug 5, 2016A00079$0P-8A FRP LOT I LONG LEAD MATERIAL
Aug 4, 2016A00078$0P-8A FRP LOT I LONG LEAD MATERIAL
Aug 4, 2016P00133$2.0MRELEASABILITY AUTHORIZATION EFFORT (RAD) MODIFICATION TO CLIN 1014
Aug 2, 2016P00132$-1.1M[N00019-15-P4-PMA-290-0741] THIS MODIFICATION DEFINITIZES THE NOT TO EXCEED MODIFICATION P00098 ISSUED ON 29 SEPTEMBER 2015 FOR CHANGE PROPOSAL (CP) 809-04736, "EWSP 6TH SENSOR ADDITION." NOTE THAT SECTION F DELIVERY SCHEDULE CHANGES FOR SUBCLINS 120001 AND 120101 IN THE MODIFICATION ARE INVALID AND WITHOUT EFFECT.
Jul 27, 2016A00076$0P-8A FRP LOT I LONG LEAD MATERIAL
Jul 26, 2016P00131$0THE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE THE USE OF OTHER THAN NEW MATERIAL AND DOCUMENT THE ASSOCIATED CONSIDERATION.
Jul 25, 2016A00075$0P-8A FRP LOT I LONG LEAD MATERIAL
Jul 20, 2016P00130$15.1MPRODUCTION CONCURRENCY UPGRADES FY15 FOR MAINTENANCE TRAINING DEVICES SUITE.
Jul 19, 2016P00129$0THE PURPOSE OF THIS NO-COST BILATERAL ADMINISTRATIVE MODIFICATION IS TO REMOVE AND REPLACE ATTACHMENT (5) TO REFLECT CLARIFICATION TO PARAGRAPH 3.1.13.1.2 (P-8A STRUCTURAL REPAIR MANUAL).
Jul 11, 2016A00071$0P-8A FRP LOT I LONG LEAD MATERIAL
Jul 11, 2016A00074$0P-8A FRP LOT I LONG LEAD MATERIAL
Jul 11, 2016P00128$0THE PURPOSE OF THIS NO-COST MODIFICATION IS TO MODIFY CDRL A00H TO MAKE THE MAY 2016 SUBMITTAL THE LAST FORMAL DELIVERY.
Jul 8, 2016A00069$0P-8A FRP LOT I LONG LEAD MATERIAL
Jul 8, 2016A00070$0P-8A FRP LOT I LONG LEAD MATERIAL
Jul 7, 2016P00127$0THE PURPOSE OF THIS MODIFICATION IS TO REMOVE AND REPLACE ATTACHMENT 26 TO ADD EFFECTIVELY OF AIRCRAFT YP0033-YP0038 TO CP 809-04599 OBIGGS SYSTEM CONTROLLER WHICH INADVERTENTLY LEFT OUT OF THE DOCUMENT AT AWARD.
Jun 30, 2016P00126$0THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO REMOVE AND REPLACE ATTACHMENTS 11 AND 14
Jun 28, 2016A00068$0P-8A FRP LOT I LONG LEAD MATERIAL
Jun 16, 2016P00125$0THE PURPOSE OF THE MODIFICATION IS TO UPDATE ATTACHMENT 7 LOT GFE LIST TO CORRECT PART NUMBERS FOR VARIOUS GFE ITEMS AND INCORPORATE AN UPDATED DD254.
Jun 8, 2016A00067$0P-8A FRP LOT I LONG LEAD MATERIAL
Jun 6, 2016A00065$0P-8A FRP LOT I LONG LEAD MATERIAL
May 31, 2016P00124$0THE PURPOSE OF THIS MODIFICATION IS TO ADD CLAUSE 252.204-7000 AND REMOVE CLAUSE 5252.204.9504.
May 24, 2016A00064$0P-8A FRP LOT I LONG LEAD MATERIAL
May 18, 2016P00123$0MODIFICATION TO UPDATE ACCOUNT BILLING INFORMATION FOR RAAF CLINS.
May 16, 2016A00063$0P-8A FRP LOT I LONG LEAD MATERIAL
May 13, 2016P00122$21.3KOBIGGS
May 2, 2016P00121$-299.2KDEFINITIZE P00023 FOR DSAU
Apr 27, 2016P00120$0UPDATE ATT. 26
Apr 15, 2016P00119$670.2KPROCURE TEMPORARY SUPPORT TO DSAU CONFIGURED DDMC
Apr 11, 2016A00062$0P-8A FRP LOT I LONG LEAD MATERIAL
Apr 6, 2016P00118$4.0MCONTRACTOR LOGISTICS SUPPORT FOR P-8A TRAINING DEVICES.
Mar 24, 2016P00117$0UPDATE P/N FOR DSAU SPARES
Mar 17, 2016P00116$0MULTIPLE NO COST ADMINISTRATIVE CHANGES.
Mar 16, 2016P00115$0CHANGE ORDER TO ADD IN SCOPE ESS WORK
Mar 14, 2016A00061$0P-8A FRP LOT I LONG LEAD MATERIAL
Feb 19, 2016A00058$0P-8A FRP LOT I LONG LEAD MATERIAL
Feb 19, 2016A00059$0P-8A FRP LOT I LONG LEAD MATERIAL
Feb 19, 2016A00060$0P-8A FRP LOT I LONG LEAD MATERIAL
Feb 17, 2016P00114$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE DELIVERY ADDRESS AND ATTACHMENTS 11,12,13, AND 48.
Feb 16, 2016P00112$0THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO UPDATE SECTION E INSPECTION AND ACCEPTANCE FOR CLIN 0085
Feb 10, 2016P00111$-294.5KEVM DE-SCOPE AND ADD COST SUMMARY CDRL
Jan 13, 2016P00110$0THE PURPOSE OF THIS MODIFICATION IS TO MODIFY THE COMPLETION DATE FOR CHANGE PROPOSAL (CP) 809-04736 EWSP 6TH SENSOR ADDITION. THE REVISION IS TO LOT IV FOR A SCHEDULE THAT WAS INCLUDED IN P00098 MODIFICATION FOR SECTION F DELIVERIES AND PERFORMANCE. UPDATED SECTION J GOVERNMENT FURNISHED PROPERTY LIST DATED 17 DECEMBER 2015.
Jan 5, 2016P00109$0USE OF ON-BOARD PERFORMANCE TOOL (OPT)
Dec 29, 2015P00108$11.9MLOT 5 FIBER OPTICS
Dec 23, 2015P00107$9.0MLSA PHASE II
Dec 17, 2015A00057$0P-8A FRP LOT I LONG LEAD MATERIAL
Dec 17, 2015P00106$178.1MP-8 TRAINING PRODUCTION CONCURRENCY UPDATES (FY 15)
Dec 15, 2015A00054$0P-8A FRP LOT I LONG LEAD MATERIAL
Dec 15, 2015P00105$303.2KEXERCISE OPTION 0202 FOR DSAU SUPPORT VIA DDMC.
Dec 11, 2015P00104$67.5MPURCHASE OF P-8 MAINTENANCE TRAINING DEVICES IN SUPPORT OF THE RAAF.
Dec 10, 2015P00103$0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FROM 14 NOVEMBER 2015 TO 31 JANUARY 2016 FOR CLIN 0128.
Dec 2, 2015A00056$0P-8A FRP LOT I LONG LEAD MATERIAL
Nov 18, 2015A00051$0P-8A FRP LOT I LONG LEAD MATERIAL
Nov 18, 2015A00052$0P-8A FRP LOT I LONG LEAD MATERIAL
Nov 18, 2015A00053$0P-8A FRP LOT I LONG LEAD MATERIAL