Federal contract award
N0001912C0112
P-8A FRP LOT I LONG LEAD MATERIAL
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | DCMA FIXED WING PUGET SOUND |
| NAICS | 336411 — Aircraft Manufacturing |
| PSC | 1510 — Aircraft, Fixed Wing |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIXED PRICE INCENTIVE |
| Obligations | $5.5B |
| Current contract value | $5.6B |
| Potential contract value / ceiling | $5.6B |
| Start date | Aug 31, 2012 |
| Current end date | Jan 7, 2022 |
| Potential end date | Jan 7, 2022 |
| Latest award activity | Jun 3, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 353 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 3, 2026 | A00072 | $0 | P8 LRIP. MOD ISSUED TO PROVIDE DISPOSITION INSTRUCTIONS FOR GFP ACCOUNTABILITY. |
| Oct 17, 2025 | A00055 | $0 | UNDEFINITIZED ORDER |
| Oct 17, 2025 | A00066 | $0 | UNDEFINITIZED ORDER |
| Oct 15, 2024 | ARZ996 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Apr 2, 2024 | A00151 | $-161.3K | P-8A FRP LOT I LONG LEAD MATERIAL |
| Nov 7, 2023 | A00150 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Dec 21, 2022 | A00149 | $0 | PROPERTY TRANSFER MOD. |
| Dec 16, 2022 | P00203 | $-35.0K | MODIFICATION TO DEOBLIGATE CANCELED FUNDS UNDER SLINS 1050AJ AND 1051AA. |
| Oct 24, 2022 | A00148 | $-12.0M | P-8A FRP LOT I LONG LEAD MATERIAL |
| Sep 23, 2022 | P00202 | $-20.2K | DECREASES THE COST OF CLIN 0108 BY $20,198.32 AND DEOBLIGATES THAT SAME AMOUNT FROM CLIN 0108 |
| Sep 1, 2022 | A00147 | $0 | GFP TRANSFER MOD. |
| Aug 25, 2022 | A00146 | $0 | GFP TRANSFER MODIFICATION. |
| Aug 24, 2022 | P00201 | $-104.0K | DESCOPE OF SPARES NO LONGER REQUIRED AS THEY HAVE BECOME OBSOLETE AND RESULTING DEOBLIGATION OF ASSOCIATED FUNDS. |
| Jun 29, 2022 | P00200 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECPS 809-06066, 809-06214 AND 809-06254 INTO ATTACHMENT (26). |
| Jun 6, 2022 | P00199 | $-206.8K | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS AS RESULT OF A DR DESCOPE, UPDATE ATTACHMENT 106, AND TO ADD ATTACHMENT 134. |
| Dec 9, 2021 | P00197 | $-12.2K | THE PURPOSE OF THIS MODIFICATION IS TO REDUCE THE QUANTITY OF CLIN 0039AX FROM 2 TO 1 AND DE-OBLIGATE THE ASSOCIATED FUNDING IN THE AMOUNT OF $12,201.00. |
| Sep 16, 2021 | P00196 | $-3.1M | DEOBLIGATING EXCESS FUNDS TO REDUCE THE ASSOCIATED COSTS FOR CLINS 0121, 0128, AND 0500 AS THE EFFORTS HAVE BEEN FULLY COMPLETED. |
| Jul 13, 2021 | P00195 | $0 | THIS NO CHANGE IN PRICE MODIFICATION REVISES THE SHIPPING INFORMATION IN SECTION E FOR CLINS 0001 & 0101. |
| May 19, 2021 | P00194 | $0 | REVISES DELIVERY DATES FOR MCW B-KITS UNDER CLINS 0001 AND 0101 PUTTING 0101 DELIVERIES IN FRONT OF 0001 DELIVERIES TO ENABLE DELIVERY, INSPECTION, ACCEPTANCE, INVOICING AND PAYMENTS UNDER 0101 TO OCCUR PRIOR TO EXPENDITURE EXPIRATION OF 0101 FUNDING |
| Jan 27, 2021 | P00193 | $0 | EXTEND PERIOD OF PERFORMANCE FOR 5 CHANGE PROPOSALS UNDER CLIN 0101. |
| Jan 21, 2021 | P00192 | $7.6M | ADD FUNDING TO CLIN 0001 IN SUPPORT OF LRIP IV AIRCRAFT EFFORT THAT HAD NOT COMPLETED PRIOR TO CURRENT CONTRACTUAL FUNDS CANCELING. INCORPORATES FAR 52.204-25 AND DFARS 252.204-7018 INTO SECTION I. |
| Sep 23, 2020 | P00191 | $-15.9M | CLIN 0001 AND 0022 DE-OB. |
| Sep 16, 2020 | P00190 | $0 | LOT 4 FFP CLIN CONVERSION FOR CLINS 0001 AND 0022. |
| Aug 27, 2020 | A00145 | $-1.1M | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jul 27, 2020 | P00189 | $-2.2M | DE-OBLIGATE EXCESS FUNDS UNDER CLIN 0021. |
| Jul 8, 2020 | P00188 | $0 | UPDATED DELIVERY SCHEDULE |
| Jun 23, 2020 | ARZ999 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jun 10, 2020 | A00144 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| May 27, 2020 | P00187 | $0 | EXTEND THE PERIOD OF PERFORMANCE ON CLIN 0001 FOR EO/IR FROM 01 JUNE 2020 TO 31 JULY 2020. |
| May 21, 2020 | P00186 | $0 | THIS ADMIN MOD ADDS SLIN107203, UPDATES ATTACHMENT 17,18,19,20,21 AND 22, AND EXTEND THE DELIVERY DATE FOR SLIN 1054 AD. |
| Apr 9, 2020 | P00185 | $-8.0M | THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO DE-OBLIGATE FUNDS RESULTING FROM A PARTIAL TERMINATION FOR CONVENIENCE. |
| Mar 5, 2020 | P00184 | $0 | UPDATING DATES IAW COA 2. |
| Jan 24, 2020 | P00183 | $0 | THE PURPOSE OF THIS ACTION IS TO DOCUMENT THE CORRECT ACRN LISTED FOR CLIN 107202. |
| Sep 26, 2019 | P00182 | $143.5K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CHANGE PROPOSAL (CP) 809-05553 OPTICAL SENSOR CAPABILITY (AFT EO/IR, CP 809-05179 RIU WIRING TO THE P5-56 PANEL TO INDICATE MOTMS/POD POWER, CP 809-05450 AAS A-KIT AND AIRCRAFT UPDATES AND (CP) 809-05238 DRY BAY FIRE PROTECTION SYSTEM UPGRADE INTO P-8A LOTS 4-5 AIRCRAFT. |
| Aug 30, 2019 | P00181 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE EO/IR LOTS 4-5. |
| Aug 22, 2019 | P00180 | $0 | ADMINISTRATIVE MODIFICATION - EXTENDING DELIVERY AND POP DATES FOR SEVERAL CLINS. |
| Jul 31, 2019 | P00179 | $7.5M | CORRECTION OF DEFICIENCY NOTED AT TIME OF ACCEPTANCE. 6TH MCWS |
| Jul 11, 2019 | P00178 | $555.6K | THIS MODIFICATION INCREASES COST AND OBLIGATES FUNDING ON CLIN 0110 BY $555,603.22. IN ADDITION, THE POP WAS EXTENDED FROM 15 OCTOBER 2015 TO 14 JUNE 2020. |
| May 15, 2019 | P00177 | $0 | IGF::OT::IGF THIS ADMIN MOD INCORPORATES MULTIPLE DATE CHANGES ASSOCIATED WITH WITHHOLD LETTERS. |
| Apr 17, 2019 | P00176 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO UPDATE CDRL DELIVERY REQUIREMENTS FOR EXHIBIT A CDRL A00P AND EXHIBIT D CDRL D00P. |
| Apr 8, 2019 | A00143 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Mar 28, 2019 | P00175 | $-3.9M | THE GOVERNMENT IS REMOVING OBSOLETE SPARE PARTS AND ADDING THEIR REPLACEMENTS THAT RESULTED IN A DE-OBLIGATION OF FUNDS. |
| Mar 4, 2019 | A00142 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Nov 28, 2018 | A00140 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Nov 14, 2018 | A00141 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Oct 25, 2018 | P00174 | $0 | ADMINISTRATIVE MOD |
| Oct 5, 2018 | P00173 | $0 | UPDATE DELIVERY ADDRESS FOR ATTACHMENT 29. |
| Sep 26, 2018 | P00172 | $0 | ELECTRO OPTICAL INFRARED MODIFICATION |
| Sep 6, 2018 | A00139 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Aug 9, 2018 | P00171 | $0 | CLAUSE UPDATE |
| Jul 25, 2018 | P00170 | $-122.3K | THIS MODIFICATION IS TO DE-OBLIGATE $122,321.65 OF FUNDING FROM CLIN 0108, AND EXTEND THE PERIOD OF PERFORMANCE THROUGH 30 AUGUST 2018. |
| Jun 27, 2018 | A00137 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jun 15, 2018 | A00136 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jun 15, 2018 | A00138 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| May 23, 2018 | A00135 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Apr 30, 2018 | P00169 | $0 | THIS MODIFICATION CHANGES SECTION F REGARDING THE INCORPORATION OF ECP-CP-809-04785A (6TH MISSION CREW WORK STATION FORWARD FIT AND RETROFIT) A-KITS ON SIXTEEN FRP I P-8A AIRCRAFT; MORE SPECIFICALLY, ALL THOSE AIRCRAFT WILL BE MADE AVAILABLE TO THE CONTRACTOR NLT 28 JANUARY 2021, INSTEAD OF 28 JANUARY 2020, IN ORDER TO SUPPORT THE PERIOD OF PERFORMANCE. |
| Apr 26, 2018 | P00168 | $0 | UPDATE ATTACHMENT 29 |
| Apr 16, 2018 | P00167 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP-CP-809-04785A (6TH MISSION CREW WORK STATION FORWARD FIT AND RETROFIT) A-KITS INTO PREVIOUSLY DELIVERED LOTS LRIP IV (LOT 4) AND FRP I (LOT 5) AIRCRAFT. IMPLEMENTATION OF THE ECP IS A CORRECTION OF DEFICIENCY. THIS IS ONLY PARTIAL IMPLEMENTATION OF THE ECP AS TO THE LRIP IV (LOT 4) AND FRP I (LOT 5) LOTS 4 AND 5 AIRCRAFT BECAUSE IT DOES NOT INCLUDE THE 6TH MISSION CREW WORKSTATION B-KITS. |
| Mar 29, 2018 | A00134 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Feb 9, 2018 | A00132 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Feb 8, 2018 | A00133 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jan 29, 2018 | P00166 | $0 | THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO UPDATE THE CURRENT ATTACHMENT 11, P-8A 0112 SPARES DATED 1 DECEMBER 2016 TO ATTACHMENT 11, P-8A SPARES DATED 09 JANUARY 2018 AND TO CHANGE THE DELIVERY ADDRESS FOR CLIN 0039BP. |
| Jan 18, 2018 | P00165 | $0 | THE PURPOSE OF THIS NO CHANGE IN PRICE MODIFICATION IS TO EXTEND THE CLIN 0051 PERIOD OF PERFORMANCE TO 30 MARCH 2018. |
| Dec 14, 2017 | P00164 | $0 | THE PURPOSE OF THIS NO-COST ADMINISTRATIVE MODIFICATION IS TO REMOVE AND REPLACE EXHIBIT J, CDRL J001 TO REFLECT THE ADDITION OF SPECIALLY NEGOTIATED LICENSE AGREEMENT LANGUAGE. |
| Nov 30, 2017 | A00131 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Nov 15, 2017 | P00163 | $0 | LAPTOP PART NUMBER UPDATE FOR EWSO 6TH SENSOR ADDITION |
| Sep 27, 2017 | P00162 | $2.9M | DEFINITIZATION OF ELECTRONIC SECURITY SYSTEM. |
| Sep 25, 2017 | P00161 | $5.9M | INCORPORATION OF PCU15 MISTAKE IN BID. |
| Sep 22, 2017 | P00160 | $165.7K | FMS FUNDING ON CLIN 1079 AND ADMINISTRATIVE MOD TO UPDATE CONTRACT SECTIONS B,C,E,F&J. |
| Aug 18, 2017 | A00128 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Aug 18, 2017 | A00129 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Aug 8, 2017 | P00159 | $0 | ADMIN TO CORRECT SECTION J DATES |
| Aug 7, 2017 | P00158 | $0 | LOT 4 EWSP 6TH SENSOR |
| Jul 24, 2017 | P00157 | $0 | REMOVE 22 KGV-135A CRYPTO MODULES FROM ATTACHMENT 7 THEN TRANSFER TO THE N00019-14-C-0067 CONTRACT. |
| Jul 3, 2017 | A00127 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jun 28, 2017 | P00156 | $0 | FQPU/SPDS RETROFITS |
| Jun 26, 2017 | A00126 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| May 5, 2017 | A00125 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Apr 18, 2017 | A00124 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Apr 5, 2017 | A00123 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Mar 30, 2017 | A00122 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Mar 30, 2017 | P00155 | $0 | CLIN 0006 POP EXTENSION FROM 30 APRIL 2017 TO 30 APRIL 2018. |
| Mar 22, 2017 | P00154 | $3.2M | CLS EXTENSION |
| Mar 9, 2017 | P00153 | $0 | UPDATE TO ATTACHMENT 26 - PRR MASTER LIST |
| Mar 7, 2017 | P00152 | $439.1K | RAAF ENGINE PROCUREMENT |
| Feb 17, 2017 | A00121 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Feb 15, 2017 | A00119 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Feb 15, 2017 | A00120 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Feb 10, 2017 | A00116 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Feb 10, 2017 | A00118 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Feb 2, 2017 | A00117 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Feb 1, 2017 | A00115 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Feb 1, 2017 | P00151 | $0 | UPDATE TO ATTACHMENT 26 - PRR LIST |
| Jan 30, 2017 | A00114 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jan 19, 2017 | A00113 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jan 18, 2017 | A00112 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jan 13, 2017 | A00109 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jan 13, 2017 | A00110 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jan 11, 2017 | A00111 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jan 5, 2017 | P00150 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE NIINS/SLINS, DELIVERY AND STOCK POINT LOCATIONS, AND ATTACHMENT 11 FOR APPLICABLE ITEMS. |
| Dec 23, 2016 | P00149 | $0 | REMOVE AND REPLACE ATTACHMENT 26 |
| Dec 21, 2016 | A00099 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Dec 20, 2016 | A00108 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Dec 19, 2016 | A00107 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Dec 16, 2016 | A00106 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Dec 12, 2016 | P00147 | $0 | ADMIN MOD TO UPDATE FOB FOR CLIN 1060. |
| Dec 12, 2016 | P00148 | $311.3K | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND DDMC SUPPORT OF P-8A AIRCRAFT BY 4 MONTHS FROM 16 DEC 2016 TO 15 APRIL 2017. |
| Dec 5, 2016 | A00103 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Dec 5, 2016 | A00104 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Dec 5, 2016 | A00105 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Dec 2, 2016 | A00102 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Nov 30, 2016 | A00101 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Nov 29, 2016 | A00100 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Nov 23, 2016 | P00146 | $2.8M | RAAF LONG LEAD SPARES |
| Nov 17, 2016 | P00145 | $0 | THE PURPOSE OF THIS MODIFICATION IS UPDATE ATTACHMENT 26 FOR CP 809-03422 REV B, PRR 809-05214, AND CP 809-05351. |
| Nov 15, 2016 | A00098 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Nov 15, 2016 | P00144 | $0 | [PID N00019-17-NORFP-PMA-290-0163] THIS NO CHANGE IN PRICE MODIFICATION RENAMES THE SYSTEM SAFETY HAZARD ANALYSIS CDRL D010 REFERENCED IN P00141 TO CDRL D011 SINCE CDRL D010 WAS ALREADY ON CONTRACT AS A PART OF P00111. THIS MODIFICATION ALSO UPDATES THE ATTACHMENT 5 - STATEMENT OF WORK TO REFLECT THE REVISED CDRL NUMBER. |
| Nov 14, 2016 | A00097 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Nov 10, 2016 | A00096 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Nov 10, 2016 | P00143 | $0 | POP EXTENSION |
| Nov 3, 2016 | A00095 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Oct 25, 2016 | A00094 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Oct 20, 2016 | A00093 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Oct 17, 2016 | P00142 | $0 | THE PURPOSE OF THIS NO COST MODIFICATION IS TO REVISE AND REPLACE ATTACHMENT 26 (PRODUCT REVISION RECORDS MASTER LIST)TO INCORPORATE ADDITIONAL NO COST CPS/PRRS. |
| Oct 13, 2016 | P00141 | $0 | [PID N00019-16-NORFP-PMA-290-0896] INVOKING DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE CLAUSE, DFARS 252.227-7027, THIS NO CHANGE IN PRICE MODIFICATION ADDS CDRL D010 DATED 26 SEPTEMBER 2016 TO EXHIBIT D AND ADDS PARAGRAPH 3.1.6.4 TO THE ATTACHMENT 5 - STATEMENT OF WORK DATED 22 SEPTEMBER 2016. |
| Oct 7, 2016 | A00092 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Oct 6, 2016 | A00090 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Oct 6, 2016 | A00091 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Oct 5, 2016 | A00089 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Oct 5, 2016 | P00140 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REVISE AND REPLACE ATTACHMENT 26 TO INCORPORATE (CP 809-05245, CP 809-03871, CP 809-05168, CP 809-05114, AND CP 809-04734) THAT NEEDED TO BE ADDED TO THE AIRCRAFTS WITH AN AGREEMENT BETWEEN PARTIES. |
| Oct 3, 2016 | A00088 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Sep 29, 2016 | A00086 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Sep 29, 2016 | A00087 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Sep 29, 2016 | P00139 | $8.4M | P8 AC AND MTDS SPARES FOR FY16. IGF::OT::IGF |
| Sep 27, 2016 | P00138 | $13.3M | 6TH SENSOR ADDITION FOR LOT 5 P-8A AIRCRAFT. |
| Sep 16, 2016 | P00137 | $1.3M | OBIGGS ASM ENDURANCE TESTING AND SERVICE LIFE EXTENSION RECOMMENDATION. |
| Sep 12, 2016 | A00084 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Sep 12, 2016 | A00085 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Sep 12, 2016 | P00136 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REVISE AND REPLACE ATTACHMENT 26 TO INCORPORATE CP 809-05084 FOR YP033-YP052 AND ADD THE DELIVERY LOCATION FOR THE ASSOCIATED KIT AT NO COST TO THE GOVERNMENT. |
| Sep 9, 2016 | A00083 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Sep 8, 2016 | A00082 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Aug 31, 2016 | A00081 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Aug 23, 2016 | A00080 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Aug 23, 2016 | P00135 | $0 | THE PURPOSE OF THE NO-COST ADMIN MODIFICATION IS TO MODIFY CDRL A00J TO MAKE THE JUNE 2016 SUBMITTAL THE LAST FORMAL DELIVERY. |
| Aug 15, 2016 | P00134 | $0 | IGF::OT::IGF THE PURPOSE OF THIS NO-COST BILATERAL ADMINISTRATIVE MODIFICATION IS TO REMOVE AND REPLACE ATTACHMENT (11) TO CHANGE THE QUANTITY OF SLIN 0039BM FROM 9 TO 8. |
| Aug 8, 2016 | A00077 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Aug 5, 2016 | A00079 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Aug 4, 2016 | A00078 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Aug 4, 2016 | P00133 | $2.0M | RELEASABILITY AUTHORIZATION EFFORT (RAD) MODIFICATION TO CLIN 1014 |
| Aug 2, 2016 | P00132 | $-1.1M | [N00019-15-P4-PMA-290-0741] THIS MODIFICATION DEFINITIZES THE NOT TO EXCEED MODIFICATION P00098 ISSUED ON 29 SEPTEMBER 2015 FOR CHANGE PROPOSAL (CP) 809-04736, "EWSP 6TH SENSOR ADDITION." NOTE THAT SECTION F DELIVERY SCHEDULE CHANGES FOR SUBCLINS 120001 AND 120101 IN THE MODIFICATION ARE INVALID AND WITHOUT EFFECT. |
| Jul 27, 2016 | A00076 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jul 26, 2016 | P00131 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE THE USE OF OTHER THAN NEW MATERIAL AND DOCUMENT THE ASSOCIATED CONSIDERATION. |
| Jul 25, 2016 | A00075 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jul 20, 2016 | P00130 | $15.1M | PRODUCTION CONCURRENCY UPGRADES FY15 FOR MAINTENANCE TRAINING DEVICES SUITE. |
| Jul 19, 2016 | P00129 | $0 | THE PURPOSE OF THIS NO-COST BILATERAL ADMINISTRATIVE MODIFICATION IS TO REMOVE AND REPLACE ATTACHMENT (5) TO REFLECT CLARIFICATION TO PARAGRAPH 3.1.13.1.2 (P-8A STRUCTURAL REPAIR MANUAL). |
| Jul 11, 2016 | A00071 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jul 11, 2016 | A00074 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jul 11, 2016 | P00128 | $0 | THE PURPOSE OF THIS NO-COST MODIFICATION IS TO MODIFY CDRL A00H TO MAKE THE MAY 2016 SUBMITTAL THE LAST FORMAL DELIVERY. |
| Jul 8, 2016 | A00069 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jul 8, 2016 | A00070 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jul 7, 2016 | P00127 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REMOVE AND REPLACE ATTACHMENT 26 TO ADD EFFECTIVELY OF AIRCRAFT YP0033-YP0038 TO CP 809-04599 OBIGGS SYSTEM CONTROLLER WHICH INADVERTENTLY LEFT OUT OF THE DOCUMENT AT AWARD. |
| Jun 30, 2016 | P00126 | $0 | THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO REMOVE AND REPLACE ATTACHMENTS 11 AND 14 |
| Jun 28, 2016 | A00068 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jun 16, 2016 | P00125 | $0 | THE PURPOSE OF THE MODIFICATION IS TO UPDATE ATTACHMENT 7 LOT GFE LIST TO CORRECT PART NUMBERS FOR VARIOUS GFE ITEMS AND INCORPORATE AN UPDATED DD254. |
| Jun 8, 2016 | A00067 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Jun 6, 2016 | A00065 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| May 31, 2016 | P00124 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADD CLAUSE 252.204-7000 AND REMOVE CLAUSE 5252.204.9504. |
| May 24, 2016 | A00064 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| May 18, 2016 | P00123 | $0 | MODIFICATION TO UPDATE ACCOUNT BILLING INFORMATION FOR RAAF CLINS. |
| May 16, 2016 | A00063 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| May 13, 2016 | P00122 | $21.3K | OBIGGS |
| May 2, 2016 | P00121 | $-299.2K | DEFINITIZE P00023 FOR DSAU |
| Apr 27, 2016 | P00120 | $0 | UPDATE ATT. 26 |
| Apr 15, 2016 | P00119 | $670.2K | PROCURE TEMPORARY SUPPORT TO DSAU CONFIGURED DDMC |
| Apr 11, 2016 | A00062 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Apr 6, 2016 | P00118 | $4.0M | CONTRACTOR LOGISTICS SUPPORT FOR P-8A TRAINING DEVICES. |
| Mar 24, 2016 | P00117 | $0 | UPDATE P/N FOR DSAU SPARES |
| Mar 17, 2016 | P00116 | $0 | MULTIPLE NO COST ADMINISTRATIVE CHANGES. |
| Mar 16, 2016 | P00115 | $0 | CHANGE ORDER TO ADD IN SCOPE ESS WORK |
| Mar 14, 2016 | A00061 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Feb 19, 2016 | A00058 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Feb 19, 2016 | A00059 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Feb 19, 2016 | A00060 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Feb 17, 2016 | P00114 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE DELIVERY ADDRESS AND ATTACHMENTS 11,12,13, AND 48. |
| Feb 16, 2016 | P00112 | $0 | THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO UPDATE SECTION E INSPECTION AND ACCEPTANCE FOR CLIN 0085 |
| Feb 10, 2016 | P00111 | $-294.5K | EVM DE-SCOPE AND ADD COST SUMMARY CDRL |
| Jan 13, 2016 | P00110 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO MODIFY THE COMPLETION DATE FOR CHANGE PROPOSAL (CP) 809-04736 EWSP 6TH SENSOR ADDITION. THE REVISION IS TO LOT IV FOR A SCHEDULE THAT WAS INCLUDED IN P00098 MODIFICATION FOR SECTION F DELIVERIES AND PERFORMANCE. UPDATED SECTION J GOVERNMENT FURNISHED PROPERTY LIST DATED 17 DECEMBER 2015. |
| Jan 5, 2016 | P00109 | $0 | USE OF ON-BOARD PERFORMANCE TOOL (OPT) |
| Dec 29, 2015 | P00108 | $11.9M | LOT 5 FIBER OPTICS |
| Dec 23, 2015 | P00107 | $9.0M | LSA PHASE II |
| Dec 17, 2015 | A00057 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Dec 17, 2015 | P00106 | $178.1M | P-8 TRAINING PRODUCTION CONCURRENCY UPDATES (FY 15) |
| Dec 15, 2015 | A00054 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Dec 15, 2015 | P00105 | $303.2K | EXERCISE OPTION 0202 FOR DSAU SUPPORT VIA DDMC. |
| Dec 11, 2015 | P00104 | $67.5M | PURCHASE OF P-8 MAINTENANCE TRAINING DEVICES IN SUPPORT OF THE RAAF. |
| Dec 10, 2015 | P00103 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FROM 14 NOVEMBER 2015 TO 31 JANUARY 2016 FOR CLIN 0128. |
| Dec 2, 2015 | A00056 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Nov 18, 2015 | A00051 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Nov 18, 2015 | A00052 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |
| Nov 18, 2015 | A00053 | $0 | P-8A FRP LOT I LONG LEAD MATERIAL |