Federal contract award
N0001914C0037
CVN 79 EMALS LONG LEAD TIME MATERIAL
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | NAVAL AIR SYSTEMS COMMAND |
| NAICS | 336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| PSC | 1720 — Aircraft Launching Equipment |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $1.8B |
| Current contract value | $1.8B |
| Potential contract value / ceiling | $1.8B |
| Start date | May 8, 2014 |
| Current end date | Jan 30, 2030 |
| Potential end date | Jan 30, 2030 |
| Latest award activity | May 21, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 123 of 123 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 21, 2026 | P00116 | $15.9M | PROCUREMENT OF ECPS 0107 AND 0109 FOR EMALS AND DIRECTED CHANGE FOR ECP 0137 FOR AAG |
| May 13, 2026 | P00115 | $654.7K | FY26 INCREMENTAL FUNDING FOR CLIN 9015 |
| Mar 26, 2026 | P00114 | $-800.0K | DE-OBLIGATION MODIFICATION |
| Mar 4, 2026 | P00113 | $817.0K | INCREMENTALLY FUND CLINS 9011 AND 9012 |
| Dec 23, 2025 | P00112 | $36.4K | ADDING FUNDING TO CLIN 6001 FOR PARTS TRANSFER FROM CVN 80-79 EA |
| Nov 12, 2025 | P00111 | $12.4M | CVN 80 PILE 2 IMPLEMENTATION INTO PRODUCTION AND INCO HARDWARE |
| Oct 29, 2025 | P00110 | $0 | ISSUE A DIRECTED CHANGE TO SUPPORT THE REDESIGN AND IMPLEMENTATION INTO CVN 80 FOR ECP-I-EMALS-0022 AND THE IMPLEMENTATION INTO CVN 80 FOR ECP-I-EMALS-0042R4 AND UPDATED ATTACHMENT 23 PBPS |
| Sep 25, 2025 | P00109 | $6.5M | THE PURPOSE OF THIS MODIFICATION IS TO PROCURE ECP-0039 HPU AND INCO FOR CVN 80 AND INCORPORATE COST IMPACT OF FAR CLAUSE 52.246-26. |
| Sep 9, 2025 | P00108 | $3.1M | ESTABLISH NEW CLINS FOR ECP 0120 NRE, DRAWINGS AND LOGISTICS |
| Sep 4, 2025 | P00107 | $1.9M | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE CLIN 7020 BY $45,267 FOR ECP-I-AAG-0115 AND ESTABLISH CLIN 8003 FOR WT MOD-II SPARES AND FULLY FUND $1,826,164, AS WELL AS UPDATE ASSOCIATED DOCUMENTS. |
| Jul 25, 2025 | P00106 | $3.1M | EXERCISE OPTIONS, FUNDING, AND CORRECT LOE ERRORS (REMOVE MATERIAL FROM LOE) |
| Jun 27, 2025 | P00105 | $3.4M | INCREMENTAL FUND 3007 AND EXERCISE OPTION CLINS 6010 & 6011. |
| Mar 6, 2025 | P00104 | $797.5K | INCREMENTALLY FUND CLINS 9011 AND 9012 |
| Jan 27, 2025 | P00103 | $264.2K | INCREASE FUNDING TO CLIN 7011 FOR ECP 0042 INSTALL DELAYS. |
| Dec 16, 2024 | P00102 | $5.9M | CLINS 1102, 1104, 3007, AND 3008 - INCREMENTALLY FUND |
| Dec 9, 2024 | P00101 | $282.1K | OBLIGATE FUNDING TO CLINS 3001 AND 3003. INCREASE FUNDING TO CLIN 6003 FOR ECP 0063 CSA OOB PSB |
| Sep 26, 2024 | P00100 | $1.3M | ADJUST WT DELIVERY DATES BASED ON ACCELERATION OF CVN 79 SCHEDULE. |
| Sep 16, 2024 | P00099 | $837.1K | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE CLIN 2201 BY $837,061 FOR THE ASSESSMENT AND REWORK OF HPUS ON CVN 79. |
| Sep 4, 2024 | P00098 | $3.6M | THE PURPOSE OF THIS MODIFICATION IS TO ACCOUNT FOR COSTS ASSOCIATED WITH THE MRB DELAY EFFORT, INCREMENTALLY FUND CLIN 1102, 1104 AND UPDATE SECTION J ATTACHMENTS. |
| May 29, 2024 | P00097 | $1.8M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING AND PAYOUT INCENTIVES. |
| Apr 19, 2024 | P00096 | $3.7M | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ADMINISTRATIVE CHANGES AND ADD ADDITIONAL SCOPE FOR CVN 80 HARDWARE STORAGE MANAGEMENT. |
| Jan 30, 2024 | P00095 | $17.1M | WT OPTION EXERCISE, PUK CNAL, LMM INCOS |
| Dec 15, 2023 | P00094 | $29.5M | OPTION EXERCISE, PSB IUID, PRIME POWER INTERFACE SUBSYSTEM (PPIS) TRANSFORMER RECTIFIER (T/R) DRAWINGS |
| Sep 28, 2023 | P00093 | $6.1M | SOFTWARE CHANGES, T/R SHOCK CHANGES, DE-OBLIGATION, SHIPPING ADDRESS UPDATE, REVISE GFP |
| Sep 1, 2023 | P00092 | $6.1M | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION LINE ITEM NUMBER 7024. |
| Aug 8, 2023 | P00091 | $6.5M | WATER TWISTER II, CENTER DECK DISPLAY, DEADLOAD AXLE, MAGNETIC LATCH |
| Jul 20, 2023 | P00090 | $829.7K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE THE DELTA FUNDING FOR THE PARTS ESTABLISHED IN P00081 AND P00083. |
| May 25, 2023 | P00089 | $342.1K | ADDING FUNDING IN SUPPORT OF CLIN 6003 FOR AAG SW DC UNDER 22-0150/ME-A |
| May 15, 2023 | P00088 | $5.0M | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND CLINS 1101, 1102, 1103, AND 1104 FOR CVN 79/80 INSTALLATION AND TEST SUPPORT. |
| May 8, 2023 | P00087 | $203.4K | DIRECTED CHANGE EQUITABLE ADJUSTMENTS FOR MOTOR GENERATORS AND HARDWARE ACCELERATION |
| Mar 21, 2023 | P00086 | $338.8K | EMALS AFT BOGEY DIRECTED CHANGE AND HAMPTON STORAGE IF. |
| Mar 9, 2023 | P00085 | $2.7M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE STORAGE SPACE FOR CVN 80 EMALS AND AAG SHIPSET ASSEMBLIES IN BUILDING 12 OF GA'S TUPEOLO FACILITY. |
| Jan 19, 2023 | P00084 | $3.4M | THE PURPOSE OF THIS MODIFICATION IS TO FUND INSTALLATION AND TEST SUPPORT FOR CVN 79 AND CVN 80. |
| Nov 17, 2022 | P00083 | $0 | TO UPDATE THE DATES IN EXHIBIT AM FOR COSAL AND REVISE THE INSPECT BY LOCATION IN DFARS CLAUSE 252.232-7006. |
| Oct 21, 2022 | P00082 | $0 | FACILITATE CLIN COMPLETION ON CLINS 0001, 1001, 2001, AND 2002 |
| Sep 29, 2022 | P00081 | $829.0K | PROCURE COSAL SPARES FOR CVN78 |
| Sep 19, 2022 | P00080 | $11.5M | FUNDING FOR LRU AND PSB STORAGE AND INSTALL AS WELL AS INCO SPARES PLUS UP. |
| Jul 20, 2022 | P00079 | $1.1M | FUND SLIN 800102 FOR AAG ILSN SPARES AND ADD CLIN 8002 FOR WT MOD-II SPARES |
| Jul 7, 2022 | P00078 | $426.0K | CVN80 HARDWARE ACCELERATION DIRECTED CHANGE AND PSB COSTS STEMMING FROM SWO & SWO CANCELLATION |
| Jun 8, 2022 | P00077 | $214.6K | THE PURPOSE OF THIS MODIFICATION IS TO FUND ADDITIONAL ACTUAL COSTS INCURRED DURING PRODUCTION OF THE DEADLOAD AXLES AND HOLDBACK CLEATS. |
| May 19, 2022 | P00076 | $349.4K | PROVIDE FUNDING FOR ECP |
| Apr 25, 2022 | P00075 | $4.0M | SCHEDULE INCENTIVE PAYMENT AND SOFTWARE UPGRADES. |
| Apr 13, 2022 | P00074 | $3.8M | ARMATURE TORSION BREAK, HAMPTON STORAGE, AND AAG DAQ WIRING |
| Mar 7, 2022 | P00073 | $189.2K | TROUGH COVER TRANSFER AND STORAGE |
| Feb 1, 2022 | P00072 | $0 | NO-COST ADMINISTRATIVE MODIFICATION. |
| Dec 6, 2021 | P00071 | $6.4M | PCD INCREMENTAL FUNDING, LMM & TROUGH CABLES STORAGE, EMALS CERTIFICATION |
| Oct 27, 2021 | P00070 | $33.7M | EXERCISE OPTION CLINS 7016 AND 7017 AND FULLY FUND BOTH CLINS. INCREMENTALLY FUND CLIN 7020. |
| Oct 22, 2021 | P00069 | $418.5K | PAYBACK CVN79 AND CVN80 FOR MATERIAL USED FOR CVN78 |
| Sep 28, 2021 | P00068 | $9.6M | THE PURPOSE OF THIS MODIFICATION IS TO DELIVER A -06 CONFIGURATION OF THE PURCHASE CABLE DRUM (PCD) FOR CVN-80 AND TO UPDATE THE PCD-05 CONFIGURATION FOR CVN-79. |
| Sep 22, 2021 | P00067 | $961.7K | IMPLEMENTATION OF INSTALLATION AND CHECKOUT SPARE (INCOS) WIRING HARNESS REPLACEMENT, AND HEALTHMAP (HMAP) DELIVERY IN SUPPORT OF EMALS FOR CVN 79 AND CVN 80 |
| Sep 3, 2021 | P00066 | $124.7K | ACCELERATED PRODUCTION OF PRINTED CIRCUIT BOARD ASSEMBLY (PCBA), PRIME POWER INTERFACE SUBSYSTEM (PPIS) INVERTER CONTROLLER CARDS. |
| Jul 8, 2021 | P00065 | $464.8K | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE NAVAIR AND DFARS CLAUSES FOR CLIN 2001 AND TO UPDATE DATES AND PAGES IN SECTION J. PID N00019-21-RFPREQ-TPM251-0487 PR 1300937038 PID N00019-RFPREQ-TPM251-0304 PR 1300925394 MICHAEL.J.LANG92.CIV@US.NAVY.MIL |
| Jun 8, 2021 | P00064 | $1.3M | FY20 SCHEDULE INCENTIVE |
| May 26, 2021 | P00063 | $66.0M | INCREMENTALLY FUND CLINS 3007, 3008, 6001, AND 6003. |
| Apr 30, 2021 | P00062 | $36.4M | WT MOD II SHIPSET |
| Apr 27, 2021 | P00061 | $1.2M | DELIVERY ACCELERATION OF EMALS PCS/PPIS INVERTER INTERNALS FOR CVN 79 PCS RECTIFIER LEAK DETECTOR CHANGE KIT INSTALLATION UNDER FOR CVN 79 AND PRODUCTION CUT-IN OF ECP-I-EMALS-0051 FOR CVN 80. |
| Mar 29, 2021 | P00060 | $149.1K | EQUITABLE ADJUSTMENT FOR PROPOSAL PREPARATION |
| Feb 2, 2021 | P00059 | $3.6M | ESTABLISH CLIN 7013 FOR THE MANUFACTURE AND DELIVERY OF DEADLOAD AXLES, FALSE AXLES, AXLE SLEEVES, AND SPLASH SHIELDS. |
| Nov 18, 2020 | P00058 | $0 | CLIN 7008 POP EXTENSION |
| Oct 7, 2020 | P00057 | $290.4K | ADD FUNDING TO CLIN 2001 FOR CVN 79 NOSE GEAR LAUNCH |
| Sep 21, 2020 | P00056 | $713.9K | REDESIGN NOSE GEAR LAUNCH |
| Aug 31, 2020 | P00055 | $63.3K | PROVIDE AN EQUITABLE ADJUSTMENT FOR THE CVN 80 POSITION SENSOR BLOCK (PSB) STOP WORK ORDER IN ACCORDANCE WITH FEDERAL ACQUISITION REGULATION CLAUSE 52.243-1, CHANGES FIXED PRICE AND NAVAIR LETTERS 19-0201 DATED 23 JULY 2018 AND 19-0253 DATED 11 SEPTEMBER 2019. UPDATE SECTION J. |
| Aug 5, 2020 | P00054 | $846.5K | ECP 0047 FOR AAG PCD PIN |
| Jun 23, 2020 | ARZ998 | $0 | CVN 79 EMALS LONG LEAD TIME MATERIAL |
| Jun 16, 2020 | P00053 | $3.0M | ECR 06685 EMALS POWER CONDITIONING SUBSYSTEM AND PRIME POWER INTERFACE SUBSYSTEM INVERTER ASSEMBLY HIGH FREQUENCY TERMINAL BLOCK |
| Apr 28, 2020 | P00052 | $162.2M | THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND CLINS 6001 AND 6003 AND UPDATE DFARS CLAUSE 252.232-7007. |
| Apr 10, 2020 | P00051 | $3.0M | MOTOR SUPPORT STRUCTURE ECP INCORPORATION 78-REACHBACK INTEGRATED LOGISTICS SUPPORTABILITY OTHER ADMINISTRATIVE UPDATES |
| Mar 25, 2020 | P00050 | $1.8M | FY19 INCENTIVE PAYMENT IN ACCORDANCE WITH H-8 SCHEDULE INCENTIVE UNDER CLIN 2003 |
| Mar 5, 2020 | P00049 | $3.0M | TO PROCURE SIX (6) CVN78 WATER TWISTER MOD-II ROTORS |
| Feb 19, 2020 | P00048 | $10.4M | SCL AND SFD HARDWARE UPGRADES. |
| Feb 18, 2020 | P00047 | $0 | TO CORRECT THE COL# FOR CSA SHEAVE ASSY AS INTENDED IN P00046. |
| Feb 13, 2020 | P00046 | $0 | SECTION F DELIVERY QTY UPDATE |
| Dec 30, 2019 | P00045 | $10.1M | POST PRODUCTION AND PRODUCTION INCORPORATION OF ECPS FOR CVN 79 AND CVN 80, RESPECTIVELY. |
| Nov 1, 2019 | P00044 | $46.0K | DELIVERY DATE FOR EXHIBIT G SPARES MOVED FROM 8/2018 TO 5/2024 RESULTING IN THE NEED OF STORAGE AND PRESERVATION FOR THESE SPARES UNTIL DELIVERY |
| Aug 13, 2019 | P00043 | $7.2M | PROVIDE AN EQUITABLE ADJUSTMENT FOR A DIRECTED CHANGE AGAINST THE AAG WT AND CSA. |
| Jul 22, 2019 | P00042 | $0 | UPDATE EXHIBITS E&N TO THE CORRECT QUANTITY OF THE ECS HOSE ASSEMBLIES, AND PROVIDE ADMIN UPDATES TO EXHIBIT F, G, AND R. |
| Jul 10, 2019 | P00041 | $326.1K | CABLE SHOCK ABSORBERS DIRECTED CHANGE. |
| May 31, 2019 | P00040 | $100.0K | MOTOR GENERATOR STORAGE DIRECTED CHANGE REA |
| May 23, 2019 | P00039 | $3.4M | FY18 SCHEDULE INCETIVES |
| Apr 17, 2019 | P00038 | $0 | UPDATE CLINS 3005, 3006, 3007, AND 3008. |
| Apr 16, 2019 | P00037 | $0 | UPDATE TO EXHIBITS AND ATTACHMENTS AND PROVIDE GFI |
| Feb 26, 2019 | P00036 | $3.8M | INCREMENTALLY FUND CLIN 2004 |
| Dec 26, 2018 | P00035 | $336.6M | INCREMENTAL FUNDING FOR CVN80 |
| Oct 30, 2018 | P00034 | $-11.4M | UPDATE TO ATTACHMENTS AND EXHIBITS UNDER CVN 79/80 EMALS&AAG PRODUCTION CONTRACT |
| Oct 26, 2018 | P00033 | $41.8K | WELD POSITIONER GOVERNMENT FURNISHED PROPERTY |
| Oct 22, 2018 | P00032 | $0 | SCHEDULE ACCELERATION DEFIN |
| Sep 7, 2018 | P00031 | $2.2M | PROVIDE THE FY17 SCHEDULE INCENTIVE PAYMENTS FOR EMALS DELIVERIES AND AAG DELIVERIES UNDER CLIN 2003, CHANGE CLIN 6002 FROM CVN 80 EMALS SHIPSET W/O AAG TO RESERVED, CHANGE SECTION F, DELIVERIES OR PERFORMANCE, GFE WAREHOUSE POINT OF CONTACT, UPDATE EXHIBIT E, CVN 79 EMALS DELIVERY DATES AND EXHIBIT F, CVN 79 AAG DELIVERY DATES, AND UPDATE EXHIBIT H, AAG INCO DELIVERY DATES. |
| Aug 7, 2018 | A00004 | $0 | CVN 79 EMALS LONG LEAD TIME MATERIAL |
| Jul 18, 2018 | P00030 | $250.0K | INCREMENTAL FUNDING OF NRE CLIN 3007 AND SOW/CDRL UPDATES |
| Jun 19, 2018 | P00029 | $0 | NO COST MODIFICATION TO CHANGE THE DELIVERY DATE AND RECEIVE CONSIDERATION, DEOBLIGATE FUNDS FROM CLIN 3001 AND 3003, CHANGE DELIVERY LOCATIONS, AND UPDATE EXHIBIT P AND ATTACHMENT 5 WITH ADMINISTRATIVE UPDATES. |
| May 2, 2018 | P00028 | $42.8M | INCREMENTAL FUNDING OF CVN 80 CLINS. NO COST CHANGES INCLUDE APPROVAL OF RFVS AND ECNS, DELIVERY DATE CHANGE FOR PPIS-PCS WATER COOLING CONTROL PANEL AND AS CONSIDERATION GA WILL STORE UNTIL DELIVERY, UPDATE TO TECHNICAL DATA REQUIREMENTS, AND A CONTRACT ERROR CHANGE TO SECTION E. |
| Mar 29, 2018 | P00027 | $55.0K | EQUITABLE ADJUSTMENT IN BOTH DELIVERY SCHEDULE AND CONTRACT PRICE FOR A STOP WORK CANCELLATION OF THE HEALTHMAP AND PC/104 COMPUTER. |
| Feb 14, 2018 | P00025 | $0 | UNPRICED DIRECTED CHANGE FOR THE INCORPORATION OF THE WT MOD-I UPGRADE |
| Feb 14, 2018 | P00026 | $35.3M | CONTRACT LINE ITEMS (CLIN) 6001, CVN 80 EMALS AND 6003, CVN 80 AAG ARE INCREMENTALLY FUNDED FOR THE ITEM SUM OF $35,300,000 |
| Feb 6, 2018 | P00024 | $48.1K | EQUITABLE ADJUSTMENT FOR A WATER TWISTER STOP WORK ORDER. |
| Jan 3, 2018 | P00023 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE ATTACHMENT 19. THERE WILL BE NO CHANGE TO CONTRACT PRICE. |
| Dec 28, 2017 | P00022 | $198.6M | INCREMENTAL FUNDING FOR CONTINUED CONTRACTING PERFORMANCE. |
| Dec 27, 2017 | P00021 | $82.9K | EXERCISE CSA CHARGING PANEL OPTION |
| Dec 9, 2017 | P00020 | $61.4M | INCREMENTAL FUNDING FOR CONTINUED CONTRACTING PERFORMANCE. |
| Dec 2, 2017 | P00019 | $9.1M | PROVIDE INCREMENTAL FUNDING FOR CVN 80. |
| Nov 2, 2017 | P00018 | $7.3M | THIS PURPOSE OF THIS MODIFICATION IS TO PROCURE AAG RALS HARDWARE COMPONENTS TO REPLACE THE CVN 79 HARDWARE CURRENTLY INSTALLED AT THE RUNWAY ASSISTED LANDING SITE (RALS). |
| Aug 18, 2017 | P00017 | $0 | MODIFICATION TO EFFECT THE CONSIDERATION OWED FOR CVN 80 AAG OPTION EXERCISE EXTENSION. |
| Aug 17, 2017 | A00003 | $0 | CVN 79 EMALS LONG LEAD TIME MATERIAL |
| Jun 29, 2017 | A00002 | $0 | CVN 79 EMALS LONG LEAD TIME MATERIAL |
| Jun 20, 2017 | P00016 | $0 | UNPRICED CHANGE ORDER AS A RESULT OF STOP WORK ORDERS |
| Jun 15, 2017 | P00015 | $443.2K | FIRST INSTALLMENT OF THE SCHEDULE INCENTIVE FOR EMALS AND AAG DELIVERIES |
| May 18, 2017 | P00014 | $4.0M | EXERCISE OPTION FOR CVN 80 ADVANCED ARRESTING GEAR. |
| May 15, 2017 | P00013 | $0 | ADMINISTRATIVE MODIFICATION TO EXTEND THE CVN 80 AAG OPTION (CLIN 6003) OPTION EXERCISE DATE. |
| Apr 14, 2017 | A00001 | $0 | CVN 79 EMALS LONG LEAD TIME MATERIAL |
| Feb 23, 2017 | P00012 | $164.7M | FUNDING ONLY MODIFICATION |
| Jan 27, 2017 | P00011 | $11.0M | EXERCISE CVN 80 EMALS OPTION |
| Jan 12, 2017 | P00010 | $0 | FUNDING DE-OB RE-OB ONLY MODIFICATION. |
| Dec 22, 2016 | P00009 | $0 | DEFINITIZATION OF CVN 79 PRODUCTION CONTRACT |
| Sep 15, 2016 | P00008 | $0 | UPDATE OF EXISTING SECTION J EXHIBITS, ATTACHMENTS, AND OTHER DOCUMENTS. DELIVERY ADDRESS CHANGE FOR EMALS HARDWARE SHIPSET. |
| Jun 1, 2016 | P00007 | $0 | PERIOD OF PERFORMANCE EXTENSION ON CLINS 3001 AND 3003. |
| May 9, 2016 | P00006 | $100.0M | CVN 79 INCREMENTAL FUNDING MODIFICATION |
| Mar 8, 2016 | P00005 | $0 | MODIFICATION TO UPDATE THE GA MAKE/BUY APPROACH FOR MOTOR GENERATORS. |
| Dec 2, 2015 | P00004 | $64.3M | CVN 79 INCREMENTAL FUNDING MODIFICATION. |
| Nov 11, 2015 | ARZ999 | $0 | CVN 79 EMALS LONG LEAD TIME MATERIAL |
| Jun 12, 2015 | P00003 | $164.8M | CVN 79 LLTM DEFINITIZATION&CVN 79 UCA EXECUTION. |
| Sep 9, 2014 | P00002 | $0 | ADMIN MOD TO DELETE TWO FAR CLAUSES AND REPLACE SUPPLEMENT 2 TO EXHIBITS A&B. |
| Aug 6, 2014 | P00001 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REVISE AND REPLACE EXHIBIT A CDRL A00G, AND ATTACHMENT 3 STATEMENT OF WORK. ADDITIONALLY FUNDS ARE DEOBLIGATED FROM ACRN AB AND OBLIGATED ON ACRN AA WITH NO OVERALL CHANGE IN CONTRACT PRICE. |
| May 8, 2014 | 0 | $15.4M | CVN 79 EMALS LONG LEAD TIME MATERIAL |
Estimated positioning window
Jan 30, 2029 – Jul 30, 2029
50/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 50/100. Available recorded signals: 45 points.
- Contract end 2030-01-30 (1193 days from calculation)
- +5 points
- 14 historical awards in this buyer and category group
- +15 points
- 123 recorded award transactions
- +10 points
- Latest award action: 2026-05-21
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.