Federal contract award

N0001918C1007

LRIP LOT 1&2 INTEGRATED LOGISTICS SUPPORT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVAL AIR SYSTEMS COMMAND
NAICS336412 — Aircraft Engine and Engine Parts Manufacturing
PSC2850 — Gasoline Rotary Engines and Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$66.4M
Current contract value$66.4M
Potential contract value / ceiling$66.4M
Start dateNov 16, 2017
Current end dateOct 30, 2025
Potential end dateOct 30, 2025
Latest award activityMay 14, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 102 of 102 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 14, 2026P00047$0DESCOPE AND CONSIDERATION
May 14, 2026P00047$0DESCOPE AND CONSIDERATION
Feb 13, 2026P00046$0THE PURPOSE OF THIS MODIFICATION IS TO REPAIR 7 WARRANTY ENGINES AND 1 CONSIDERATION ENGINE RESULTING FROM A GE QUALITY ISSUE.
Feb 13, 2026P00046$0THE PURPOSE OF THIS MODIFICATION IS TO REPAIR 7 WARRANTY ENGINES AND 1 CONSIDERATION ENGINE RESULTING FROM A GE QUALITY ISSUE.
Dec 2, 2025A00007$0LRIP LOT 1&2 INTEGRATED LOGISTICS SUPPORT
Sep 30, 2025P00045$0EXTEND CLIN 0303 TO 30 OCT 2025
Sep 30, 2025P00045$0EXTEND CLIN 0303 TO 30 OCT 2025
Sep 18, 2025P00044$318.1KTHE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J TO DELETE EXHIBIT A CDRL-A003 AND TO DELETE AND REPLACE ATTACHMENTS 01, 100, AND 200 WITH THE 22 MAY VERSIONS. ADDITIONALLY, THIS MODIFICATION DOCUMENTS THE AGREED TO CONSIDERATION FOR QEM11255-25-100.
Sep 18, 2025P00044$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J TO DELETE EXHIBIT A CDRL-A003 AND TO DELETE AND REPLACE ATTACHMENTS 01, 100, AND 200 WITH THE 22 MAY VERSIONS. ADDITIONALLY, THIS MODIFICATION DOCUMENTS THE AGREED TO CONSIDERATION FOR QEM11255-25-100.
May 14, 2025A00006$0GFP TRANSFER "FROM" CONTRACT TO N00019-23-C-0013
Apr 11, 2025P00043$0THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO UPDATE SECTION J TO THE LATEST VERSION OF THE ENGINE SPECIFICATION AND TO UPDATE SECTION F SLINS 04000AA-0400AX DELIVERY ADDRESS.
Apr 11, 2025P00043$0THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO UPDATE SECTION J TO THE LATEST VERSION OF THE ENGINE SPECIFICATION AND TO UPDATE SECTION F SLINS 04000AA-0400AX DELIVERY ADDRESS.
Dec 12, 2024P00042$0THE PURPOSE OF THIS MODIFICATION IS TO REDUCE THE QUANTITY OF CLIN 0202 AND DE-OBLIGATE THE ASSOCIATED FUNDING.
Dec 12, 2024P00042$-2.5MTHE PURPOSE OF THIS MODIFICATION IS TO REDUCE THE QUANTITY OF CLIN 0202 AND DE-OBLIGATE THE ASSOCIATED FUNDING.
Nov 26, 2024P00041$0THE PURPOSE OF THIS MODIFICATION IS TO ADD CLINS 0400 AND 0401 WITH THEIR RESPECTIVE SLINS TO ALLOW FOR THE ESNS IMPACTED BY THE OIL SCOOP QEM TO BE INDUCTED TO GE, REPAIRED, INSPECTED, AND ACCEPTED AT NO ADDITIONAL COSTS OR PRICE TO THE GOVERNMENT.
Nov 26, 2024P00041$0THE PURPOSE OF THIS MODIFICATION IS TO ADD NSP CLINS FOR OIL SCOOP QEM REPAIRS
Nov 21, 2024P00040$0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND DELIVERY FOR CLINS 0203,0208, AND 0303.
Nov 21, 2024P00040$0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND DELIVERY FOR CLINS 0203,0208, AND 0303.
Oct 22, 2024P00039$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE RFV 23-MV-MB-001-R1, T408-STAGE 1 NOZZLE SET AREA REQUIREMENT. ALL OTHER TERMS AND CONDITIONS OF THE AGREEMENT HEREBY REMAIN UNCHANGED AND REMAIN IN FULL FORCE AND EFFECT.
Oct 22, 2024P00039$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE RFV 23-MV-MB-001-R1, T408-STAGE 1 NOZZLE SET AREA REQUIREMENT. ALL OTHER TERMS AND CONDITIONS OF THE AGREEMENT HEREBY REMAIN UNCHANGED AND REMAIN IN FULL FORCE AND EFFECT.
Aug 14, 2024P00038$0INCORPORATE APPROVED REQUEST FOR VARIANCE/CONSIDERATION.
Aug 14, 2024P00038$0INCORPORATE APPROVED REQUEST FOR VARIANCE/CONSIDERATION
Apr 13, 2024P00037$928.1KILS OVERRUN FUNDING FOR LOTS 3-4 ON CLINS 0108 AND 0208.
Apr 13, 2024P00037$0ILS OVERRUN FUNDING FOR LOTS 3-4 ON CLINS 0108 AND 0208.
Mar 12, 2024P00036$0UPDATE WARRANTY H CLAUSE
Mar 12, 2024P00036$0UPDATE WARRANTY H CLAUSE
Mar 4, 2024P00035$0T408 LOT 4 ILS DESCOPE
Mar 4, 2024P00035$0T408 LOT 4 ILS DESCOPE
Feb 22, 2024A00005$0LRIP LOT 1&2 INTEGRATED LOGISTICS SUPPORT
Feb 22, 2024A00006$0LRIP LOT 1&2 INTEGRATED LOGISTICS SUPPORT
Dec 6, 2023A00004$-0PURPOSE OF THIS NO COST MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE (POP) ON THREE ILS CLINS (CLIN 0108, 0203, 0208).
Dec 4, 2023P00034$0PURPOSE OF THIS NO COST MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE (POP) ON THREE ILS CLINS (CLIN 0108, 0203, 0208).
Dec 4, 2023P00034$0PURPOSE OF THIS NO COST MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE (POP) ON THREE ILS CLINS (CLIN 0108, 0203, 0208).
Nov 22, 2023P00033$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE AC CODE FOR LOT 4/5 LRIP CONTRACT N00019-18-C-1007.
Nov 22, 2023P00033$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE AC CODE FOR LOT 4/5 LRIP CONTRACT N00019-18-C-1007.
Oct 19, 2023P00031$0RFV
Oct 19, 2023P00031$0RFV
Oct 19, 2023P00032$0THE PURPOSE OF THIS MOD IS TO REVISE ECP 408F-001 R1 IN SECTION E.
Oct 19, 2023P00032$0THE PURPOSE OF THIS MOD IS TO REVISE ECP 408F-001 R1 IN SECTION E.
Sep 15, 2023P00030$0ADD ECPS
Sep 15, 2023P00030$0ADD ECPS
Jul 26, 2023P00029$0UPDATING THE RFV TO INCLUDE MORE ENGINES AND CLINS THAT ARE AFFECTED.
Jul 26, 2023P00029$0THIS MODIFICATION IS TO UPDATE THE RFV DUE TO A DEADLINE BEING MISSED.
Jul 11, 2023P00028$0STAGE 1/2 BLADE MIM DAMPER ECP
Jul 11, 2023P00028$0STAGE 1/2 BLADE MIM DAMPERS ECP
Jun 21, 2023P00027$1.1MCOST OVERRUN
Jun 21, 2023P00027$0COST OVERRUN
Jun 13, 2023P00026$0ADMIN
Jun 13, 2023P00026$0ADMIN
Jan 12, 2023P00025$0ECP UPDATE
Jan 12, 2023P00025$0ECP UPDATE
Sep 12, 2022P00024$4.2MLOT 3 ILS OVERRUN
Sep 12, 2022P00024$0LOT 3 ILS OVERRUN
Jun 6, 2022P00023$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE INSPECTION AND ACCEPTANCE REQUIREMENTS FOR ILS CLINS 0003 (LOT 1), 0008 (LOT 2), 0103 (LOT 3), 0203 (LOT 4), 0303 (LOT 5), AND TECH DATA CLINS 0004, 0009, 0013, 0104, 0204, AND 0304 FROM DD250 TO DD1423.
Jun 6, 2022P00023$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE INSPECTION AND ACCEPTANCE REQUIREMENTS FOR ILS CLINS 0003 (LOT 1), 0008 (LOT 2), 0103 (LOT 3), 0203 (LOT 4), 0303 (LOT 5), AND TECH DATA CLINS 0004, 0009, 0013, 0104, 0204, AND 0304 FROM DD250 TO DD1423.
Feb 18, 2022P00022$0INCORPORATE APPROVED FUEL BOOST PUMP RFV
Feb 18, 2022P00022$0INCORPORATE APPROVED FUEL BOOST PUMP RFV
Dec 13, 2021P00021$0THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO MODIFY THE GE LRIP CONTRACT TO REMOVE ENGINE SPEC DEVIATION FOR THE G04 COMBUSTER LINER LIFE VARIANCE.
Dec 13, 2021P00021$0REMOVE ENGINE SPEC DEVIATION FROM G04 COMBUSTION LINER LIFE VARIANCE.
Oct 18, 2021P00020$0ADD ECP
Oct 18, 2021P00020$0ADD ECP
Sep 10, 2021P00019$0ADMINISTRATIVE MOD
Sep 10, 2021P00019$-1.7KADMINISTRATIVE MOD
May 28, 2021P00018$0STAGE 1 NOZZLE RFV
May 28, 2021P00018$0STAGE 1 NOZZLE RFV
Apr 5, 2021P00017$0ADMIN MOD
Apr 5, 2021P00017$0ADMIN MOD
Feb 9, 2021P00016$0EXERCISE OPTION FFP CLINS 0305 AND 0306
Feb 9, 2021P00016$21.1MEXERCISE OPTION CLINS 0305 AND 0306
Jan 13, 2021P00015$4.7MT408 LOT 5 OPTION EXERCISE
Jan 13, 2021P00015$96.8MT408 LOT 5 OPTION EXERCISE
Dec 30, 2020P00014$16.6MT408 LRIP LOT 4/5
Dec 30, 2020P00014$95.3MT408 LRIP LOT 4/5
Nov 10, 2020P00013$0UPDATE SECTION G CLAUSE, 5252.232-9522 TRANSPORTATION ACCOUNTING CODE (OCT 2005) FROM NVRF TO NVNW.
Nov 10, 2020P00013$0UPDATE SECTION G CLAUSE, 5252.232-9522 TRANSPORTATION ACCOUNTING CODE (OCT 2005) FROM NVRF TO NVNW.
Aug 21, 2020P00012$0TO INCORPORATE RFV 19MD-0001R2.
Aug 21, 2020P00012$0TO INCORPORATE RFV 19MD-0001R2.
Jun 26, 2020P00011$0INCORPORATE REQUEST FOR VARIANCE.
Jun 26, 2020P00011$0TO INCORPORATE REQUEST FOR VARIANCES.
Jun 11, 2020P00010$0THE PURPOSE OF THIS MODIFICATION IS TO (1) ADD CLAUSE G-1, ADMINISTRATION ASSOCIATED WITH THE T408 ADVANCED PAYMENT AND PERFORMANCE BASED PAYMENTS (PBPS), INTO SECTION G (2) ADD DEVIATION CLAUSE FAR 52.232-12 (DEVIATION 2020-N0002), 52.232-32, AND 252.232-7013 INTO SECTION I AND (3) ADD EXHIBITS A1 AND B INTO SECTION J.
Jun 11, 2020P00010$0THE PURPOSE OF THIS MODIFICATION IS TO (1) ADD CLAUSE G-1, ADMINISTRATION ASSOCIATED WITH THE T408 ADVANCED PAYMENT AND PERFORMANCE BASED PAYMENTS (PBPS), INTO SECTION G (2) ADD DEVIATION CLAUSE FAR 52.232-12 (DEVIATION 2020-N0002), 52.232-32, AND 252.232-7013 INTO SECTION I AND (3) ADD EXHIBITS A1 AND B INTO SECTION J.
May 15, 2020P00009$39.2KADDS O-LEVEL PSE SCOPE.
May 15, 2020P00009$0ADDS O-LEVEL PSE SCOPE.
Apr 7, 2020P00008$0TO MOVE DELIVERY DATES, UPDATE DELIVERY ADDRESS AND UPDATE CDRLS.
Apr 7, 2020P00008$0TO UPDATE DELIVERY DATES, DELIVERY ADDRESS AND UPDATE CDRLS.
Dec 17, 2019P00007$0REQUESTS FOR VARIANCES AND UPDATES EXHIBIT CM04, ATTACHMENTS 9 AND 10.
Dec 17, 2019P00007$0REQUEST FOR VARIANCE AND UPDATES EXHIBIT CM04 AND ATTACHMENTS 9 AND 10.
Nov 22, 2019P00006$0DESCOPE OF CSI AND ADMINISTRATIVE CHANGES.
Nov 22, 2019P00006$0CSI DESCOPE AND OTHER ADMINISTRATIVE ACTIONS
Aug 29, 2019P00005$15.5MLRIP ENGINES LOT 3 ILS
Aug 29, 2019P00005$128.2MLRIP ENGINES LOT 3 AND LOT 2 CONGRESSIONALLY APPROPRIATED ENGINES.
Jul 22, 2019P00004$0LINE OF ACCOUNTING CHANGE ON CLIN 0005, ADDS CLIN 0010; UPDATES SECTION J.
Jul 22, 2019P00004$0UPDATES THE LINE OF ACCOUNTING ON CLIN 0005 AND ADDS CLIN 0010. UPDATES SECTION J.
Jun 20, 2019P00003$0BOM CONFIGURATION CHANGES FOR LOTS 1/2.
Jun 20, 2019P00003$720.0KBOM CONFIGURATION CHANGES FOR LOTS 1/2.
Feb 20, 2019P00002$0TO UPDATE TRANSPORTATION ACCOUNTING CODE
Feb 20, 2019P00002$0TO UPDATE TRANSPORTATION ACCOUNTING CODE
Dec 17, 2018P00001$0TO UPDATE NSNS, DODAAC AND DELIVERY ADDRESS ON CLIN 0007 AND OTHER ADMINISTRATIVE ACTIONS.
Dec 17, 2018P00001$0TO UPDATE NSNS, DODAAC AND DELIVERY DATE ON CLIN 0007 AND OTHER ADMINISTRATIVE ACTIONS.
Nov 16, 20170$23.1MLRIP LOT 1&2 INTEGRATED LOGISTICS SUPPORT
Nov 16, 20170$120.3MLRIP LOT 1&2 T408 ENGINES/ SEPM
Nov 16, 2017A00005$120.3MLRIP LOT 1&2 T408 ENGINES/ SEPM

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.