Federal contract award

N0001918C1046

F/A-18E AIRCRAFT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVAL AIR SYSTEMS COMMAND
NAICS336411 — Aircraft Manufacturing
PSC1510 — Aircraft, Fixed Wing
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$5.5B
Current contract value$5.5B
Potential contract value / ceiling$5.5B
Start dateMay 8, 2018
Current end dateAug 31, 2028
Potential end dateAug 31, 2028
Latest award activityMar 19, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 125 of 125 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 19, 2026P00054$0UPDATE TO THE MGFEL LISTS, SUBCONTRACTOR COST PLAN, AND THE GFP LIST
Aug 11, 2025P00053$0GFP, MMRB AESA SHIPSETS, AND GLARESHIELD INTEGRATION
Apr 7, 2025P00052$57.6MTHE PURPOSE OF THIS MODIFICATION IS TO ADD CLINS FOR THE DELIVERY OF BLOCK III WINDSHIELDS AND AN ANAV2 UNIT FOR CONSIDERATION OF WAIVERS, TRANSFER GFE TO AND FROM THIS CONTRACT, ADD NRE EFFORT FOR ECP 6558, AND INCORPORATE THE CFT ADJUSTMENT.
Jan 3, 2025A00068$0SUPPLY CONTRACTS AND PRICED ORDERS
Dec 30, 2024A00067$0AIRCRAFT, FIXED WING
Dec 3, 2024A00066$0SUPPLY CONTRACTS AND PRICED ORDERS
Sep 30, 2024P00051$14.3MTHE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE TPOC, UPDATE ATTACHMENTS 13 AND 27, AND COMPLETE THE PRICE REDETERMINATION OF LOT 42B.
Aug 28, 2024PZ0002$859.2MTHE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE CONTRACT FOR THE FULL RATE PRODUCTION OF THE CONGRESSIONALLY ADDED F/A-18 AIRCRAFT FOR CLINS 0402 (FY22 F/A-18F AIRCRAFT), 0403 (CONGRESSIONALLY ADDED F/A-18 AIRCRAFT NRE), 0406 (TDP NRE), 0501 (FY23 F/A-18E AIRCRAFT),AND 0502 (FY23 F/A-18F AIRCRAFT). THIS MODIFICATION W ILL ALSO ESTABLISH PERFORMANCE BASED PAYMENTS FOR AIRCRAFT CLINS 0402, 0501, AND 0502 AS W ELL AS TDP NRE CLIN 0406.
Aug 5, 2024A00027$0SUPPLY CONTRACTS AND PRICED ORDERS
Jul 31, 2024P00050$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE IN SECTION B THE EXTENDED DESCRIPTION OF CLIN 0209AC.
Apr 29, 2024P00049$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP 6545 AND UPDATE ATTACHMENT 13.
Mar 20, 2024P00048$0THE PURPOSE OF THIS NO-COST, BILATERAL MODIFICATION IS TO UPDATE SECTION J TO INCLUDE ATTACHMENT 55, SPECIAL LICENSE AGREEMENT, DATED 15 MARCH 2024 AS REFERENCED IN ATTACHMENT 1, STATEMENT OF WORK (REV 6 - INCORPORATED VIA P00047).
Mar 19, 2024P00047$263.1MUNDEFINITIZED CONTRACT ACTION WITH A NOT-TO-EXCEED (NTE) FOR TWELVE (12) F/A-18F AIRCRAFT AND FIVE (5) F/A-18E AIRCRAFT WITH ASSOCIATED RED GEAR, LAD COVERS, AND GUN BLAST DIFFUSER COVERS NON-RECURRING ENGINEERING(NRE) IN SUPPORT OF AIRCRAFT AND TECHNICAL DATA PACKAGE NRE
Mar 6, 2024A00065$0GFP PERMANENT TRANSFER
Feb 15, 2024P00046$-109.0KTHE PURPOSE OF THIS BILATERAL MOD IS TO 1) INCORPORATE ECP 6539 ALTERNATE WARNING ADVISORY THREAT (WAT) PANELS, 2) UPDATE ATTACHMENT 24 - ENGINEERING CHANGE PROPOSALS (ECPS) INCORPORATED INTO LOTS 42(B), 43, 44, AND 45 AIRCRAFT TO INCORPORATE ECP 6539, 3) ADD ATTACHMENT 50 TO INCORPORATE STATEMENT OF WORK (SOW) ECP-6539 ALTERNATE WARNING ADVISORY THREAT (WAT) PANELS, 4) INCORPORATE CDRLS C010-C018 FOR ECP 6539 INTO EXHIBIT C, AND 5) UPDATE ATTACHMENT 27.
Jan 18, 2024A00064$0GFP TRANSFER
Jan 8, 2024A00063$0RFNIU GFP TRANSFER REQUEST
Jan 3, 2024A00062$0RFNIU GFP TRANSFER REQUEST
Dec 20, 2023A00061$0GFP TRANSFER
Nov 30, 2023P00045$0THE PURPOSE OF THIS MODIFICATION IS TO ADD A NSP CLIN TO DELIVER NEW AESA MMR-B MODULE SHIPSETS AS PAYBACK FOR USE OF GFE MODULES IN ORDER TO COMPLETE TESTING. ADDITIONALLY, UPDATE SECTION J TO UPDATE ATTACHMENT 13 AND 24. ADD ATTACHMENT 53 AND 54 IN SECTION J.
Sep 27, 2023P00044$7.4MTO INCORPORATE ECP-G058, UPGRADE OF AN/ALQ-214A(V)4 HARDWARE AND SOFTWARE AND TO ADD A REBUILD/REPLACEMENT TOOLING EFFORT.
Sep 18, 2023A00059$0GFP TRANSFER FROM GOVERNMENT STORAGE TO CONTRACT # N0001918C1046
Sep 15, 2023A00060$0RFNIU GFP TRANSFER
Aug 29, 2023P00043$168.8KTHE PURPOSE OF THIS MODIFICATION IS TO ADD SUBCLIN 0014AM IN SUPPORT OF THE LEADING EDGE FLAP (LEF) ASYMMETRY CONTROL UNIT (ACU) FLANGED ANNULAR BALL BEARING OBSOLESCENCE ISSUE.
Aug 25, 2023P00042$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE DELIVERY SCHEDULE IN SECTION F FOR STATION CONTROL UNITS (SCU) FOR AAE/CFE CONTRACT LINE ITEM NUMBERS (CLINS) 0008AD, 0108AD, AND 0208AD. IN ADDITION, THIS MODIFICATION UPDATES LANGUAGE IN SECTION C FOR CLIN 0402 TO CAPTURE THE NO CHANGE IN PRICE PURCHASE OF TWELVE (12) FLIGHT CONTROL COMPUTER (FCC) SHIPSETS. UPDATES SECTION I, CONTRACT CLAUSES, TO ADD FAR 52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION.
Aug 23, 2023A00058$0EXTENSION OF PERIOD OF USE OF EQUIP/DOORS FROM 31 AUG 2023 THROUGH 31 DEC 2023.
Aug 16, 2023A00057$0GFP TRANSFER FROM GOV STORAGE TO N0001918C1046.
Jul 5, 2023A00056$0RFNIU REQUEST
Jun 14, 2023P00041$0UPDATE ATTACHMENT 13
Jun 1, 2023P00040$200.0MTIME CRITICAL PARTS FUNDING, PECULIAR SUPPORT EQUIPMENT AND TOOLING DATA
May 24, 2023A00047$0F/A-18E AIRCRAFT
May 23, 2023A00055$0RFNIU REQ FOR BARRIER ARRESTING KITS (BAK) 12/14B AIRCRAFT ARRESTING SYSTEMS (AAS) FROM RUNWAYS AT THE ST. LOUIS INTERNATIONAL AIRPORT TO N0001918C1046.
May 9, 2023A00054$0MOD A00054 IS FOR AN RFNIU TRANSFER REQUEST
May 9, 2023P00039$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE CYBER SUPPLY CHAIN RISK MANAGEMENT (C-SCRM) STANDARD AS ATTACHMENT 37 AND UPDATE CDRL A01M AS CONSIDERATION FOR PROVIDING CANOPY THRUSTERS AND DOORS AS GOVERNMENT FURNISHED PROPERTY.
Apr 12, 2023A00045$0F/A-18E AIRCRAFT
Apr 4, 2023A00053$0TRANSFER REQ FROM N0001918C1046 TO SPRPA114D002U_SPRPA118F0LB5.
Mar 29, 2023P00038$515.8KTHE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD SUBCLIN 0014AL IN SUPPORT OF THE KULTIE PRESSURE TRANSDUCER SUBASSEMBLY OBSOLESCENCE ISSUE.
Mar 16, 2023A00052$0AIRCRAFT, FIXED WING
Mar 14, 2023A00050$0RFNIU TRANSFER REQUEST
Mar 14, 2023A00051$0AIRCRAFT, FIXED WING
Mar 13, 2023A00049$0F/A-18E AIRCRAFT
Mar 1, 2023A00048$0F/A-18E AIRCRAFT
Feb 24, 2023P00037$0CORRECT QUANTITIES UNDER CLIN 0215.
Feb 16, 2023A00046$0AIRCRAFT, FIXED WING
Feb 6, 2023P00036$1.3MESTABLISH SLIN 0014AK TO SUPPORT CABIN/AVIONICS VENTURI OBSOLESCENCE
Feb 2, 2023A00044$0GFP TRANSFER MOD FROM CONTRACT # N0038307D001J TO CONTRACT # N0001918C1046.
Jan 10, 2023A00043$0GFP TRANSFER FROM N0001917C0003 TO N0001918C1046
Jan 4, 2023A00042$0RFNIU MOD
Dec 7, 2022A00040$0F/A-18E AIRCRAFT
Dec 7, 2022A00041$0RFNIU TRANSFER REQUEST
Dec 7, 2022P00035$0INCORPORATION OF PRODUCTION NRE PERFORMANCE-BASED PAYMENT PLAN AND SCHEDULES.
Nov 28, 2022A00038$0A00038 RESCINDS A00037 CHANGING THE TRANSFER REQUEST FROM RFNIU TO NOT RFNIU
Nov 28, 2022A00039$0TRANSFER REQ DVR-014R-722977 REV1 MOD
Nov 22, 2022P00034$78.1KADMINISTRATIVE ACTION/INCORPORATION OF UPDATED CSP REQUIREMENT.
Oct 11, 2022A00037$0RFNIU TRANSFER
Sep 2, 2022A00036$0F/A-18E AIRCRAFT
Aug 19, 2022A00035$0AIRCRAFT, FIXED WING
Aug 16, 2022A00034$0RFNIU MOD
Aug 11, 2022A00032$0RFNIU MOD
Aug 11, 2022A00033$0RFNIU MOD
Aug 11, 2022P00033$3.5MTO INCORPORATE SMP AND ECP 6539
Aug 10, 2022A00029$0RFNIU MOD
Aug 10, 2022A00030$0RFNIU MOD
Aug 10, 2022A00031$0RFNIU MOD
Jul 27, 2022A00028$0RFNIU GFP TRANSFER FROM N0001918C1046 TO N0001920C0001.
Jul 12, 2022P00032$18.8MTHIS MOD EXERCISES OPTIONS AND PROVIDES FUNDING FOR THE CONTRACTOR TO PROVIDE AIRCRAFT ARMAMENT EQUIPMENT (AAE) AS CONTRACTOR FURNISHED EQUIPMENT (CFE) IN SUPPORT OF F/A-18E/F AIRCRAFT. THIS AWARD EXERCISES CONTRACT OPTIONS TO SUPPORT SUU-79C/A WING PYLONS FOR 10 AIRCRAFT, SUU-80A/A LOW DRAG PYLONS FOR 4 AIRCRAFT, ADU-773A/A ADAPTERS FOR 22 AIRCRAFT, AND SUSTAINING ENGINEERING.
Jun 16, 2022A00025$0A00025 IS AN RFNIU MOD
Jun 16, 2022A00026$0RFNIU MOD
Jun 15, 2022A00024$0RFNIU REQUEST
Jun 2, 2022P00031$530.8KTHE PURPOSE OF THIS ACTION IS TO TEST AND EVALUATE SWAGELOK PITOT-STATIC FITTINGS
May 13, 2022P00030$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE DELIVERY SCHEDULE, TO MAKE ADMINISTRATIVE CHANGES, AND PROVIDE RED GEAR KIT SECTION F UPDATES.
Apr 19, 2022A00022$0MODIFICATION FOR ACCEPTANCE OF PROPERTY TRANSFERRED FROM N0001911G0001 ORDER 1505 TO N0001918C1046.
Apr 19, 2022A00023$0MODIFICATION A00023 IS FOR RFNIU PROPERTY TRANSFER FROM ST. LOUIS PROPERTY MANAGEMENT CRIB TO N0001918C1046.
Mar 21, 2022P00029$0EXTEND WCD
Mar 17, 2022A00021$0RFNIU PROPERTY TRANSFER FROM GRANITE CITY, IL STORAGE FACILITY.
Feb 22, 2022P00028$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION F, DELIVERY ADDRESSES, ON CLINS 0211, 0212, AND 0213.
Jan 7, 2022A00020$0RFNIU REQUEST
Jan 5, 2022A00017$0AIRCRAFT, FIXED WING
Nov 2, 2021A00019$0GFP TRANSFER
Oct 29, 2021A00018$0RFNIU REQUEST
Oct 29, 2021P00027$2.1MF/A-18 PRODUCTION
Sep 30, 2021P00026$172.8MINCORPORATE ECP 6506, UPDATE ATTACHMENT 15, ESTABLISH A PRICED CLIN FOR MYIV PRODUCTION NRE, AND INCORPORATE AAE FOR LOTS 42B THROUGH BUYBACKS.
Sep 20, 2021P00025$918.1KTHE PURPOSE OF THIS BILATERAL MODIFICATION IS TO: 1.)INCORPORATE ENGINEERING CHANGE PROPOSAL (ECP) 6500 ENVIRONMENTAL CONTROL SYSTEM HEATER ON AVIONIC FLOW VALVE SERVO SUPPLY LINE AS APPROVED BY NAVAIR CONFIGURATION CONTROL BOARD (CCB) NUMBER 2021PMA2650021 DATED 21 DECEMBER 2020. 2.)UPDATE SECTION J, ATTACHMENT (22), ADVANCED CAPABILITY MISSION COMPUTER (ACMC) ACMCV1 EXCEPTION MATRIX 3.)UPDATE SECTION J, ATTACHMENTS (7) AND (8), MASTER GOVERNMENT FURNISHED EQUIPMENT LIST (MGFEL) FOR F/A18E AIRCRAFT AND F/A-18F AIRCRAFT, RESPECTIVELY 4.UPDATE SECTION F, DELIVERY ADDRESS FOR CLIN 0003 5.)UPDATE SECTION F, DELIVERY DATE FOR CLIN 0019AF, EXTENDING THE PERIOD OF PERFORMANCE FROM 15 APRIL 2021 TO 31 JANUARY 2022 6.)PROCURE PARTS AND BUSHINGS TO SUPPORT THE INSTALLATION OF ECP 6408C1 AFC-602 INSTALLS AS CONSIDERATION FOR ALLOWING BOEING TO PULL POTENTIOMETERS FROM A-D PANELS 7.)ESTABLISH NSP CLINS FOR RED GEAR KITS 8.)ESTABLISH THREE NSP CLINS FOR SHIP-SETS GUN BLASTER DIFFUSER (GBD) 9.)REVISE SCHEDULE ON NSP DATA CLINS 0007, 0012, 0107, AND 0207 10.)UPDATE SECTION G, CLAUSE 5252.201-9500, TECHNICAL POINT OF CONTACT (TPOC), AND ATTACHMENT 13, CHASE AND TARGET AIRCRAFT. 11.)UPDATE TO SECTION G, CLAUSE 5252.232-9522, TRANSPORTATION ACCOUNT CODES (TAC)
Aug 24, 2021A00015$0F/A-18E AIRCRAFT
Aug 24, 2021A00016$0F/A-18E AIRCRAFT
Jul 23, 2021A00014$0F/A-18E AIRCRAFT
Jul 9, 2021P00024$-196.6MCFT DESCOPE
Jun 16, 2021P00023$0UPDATE TO DELIVERY SCHEDULE
Jun 9, 2021A00013$0MOD A00013 IS FOR PROPERTY TRANSFER FROM CONTRACT NUMBER SPM4A1-09-G-0004_THFZ TO CONTRACT NUMBER N0001918C1046
May 14, 2021A00012$0MOD A00012 IS FOR RFNIU OF GFP FROM THE GRANITE CITY, IL WAREHOUSE.
Mar 4, 2021A00011$0PROVIDE ACCEPTANCE FOR TRANSFER ACCOUNTABILITY OF GOVERNMENT FURNISHED PROPERTY ITEMS CONTRACT N0001915G0003_0005 TO CONTRACT N0001918C1046 PER REQUEST NO: 21-FA-18-KBS-075 DATED 25 FEB 2021.
Mar 2, 2021A00010$0TRANSFER OF GOVERNMENT FURNISHED PROPERTY FROM GOVERNMENT STORES TO CONTRACT N0001918C1046.
Feb 26, 2021P00022$0NCIP ADMIN MOD
Dec 16, 2020P00021$2.2MTHE PURPOSE OF THIS MODIFICATION IS TO PROCURE NON RECURRING ENGINEERING (NRE) FOR COMMON PRE-AMPLIFIER (CPA) RADIO FREQUENCY (RF) AMPLIFIER MODULE, CIRCUIT CARD ASSEMBLY (CCA) OBSOLESCENCE. THIS MODIFICATION IS TO IDENTIFY ALTERNATE COMPONENTS FOR THE COMMON PRE-AMP (CPA) P/N 2680576G002 USED BY THE F/A-18E/F ALQ-214 JAMMER SYSTEM IN THE RF RECEIVE PATH.
Dec 14, 2020A00008$0GFP PERMANENT TRANSFER
Dec 14, 2020A00009$0GFP PERMANENT TRANSFER
Nov 19, 2020P00020$758.8KTHE PURPOSE OF THIS MODIFICATION IS TO PROCURE NON RECURRING ENGINEERING (NRE) FOR INTEGRATED MICROWAVE INTEGRATED CIRCUIT (IMIC) P/N 4241503-501 OBSOLESCENCE SHOP REPLACEABLE ASSEMBLY (SRA) COMPONENTS, UTILIZED BY THE F/A-18E/F ALR-67 SYSTEM LEADING EDGE FLAP (LEF) ANTENNAS AND ENHANCED ANTENNA DETECTORS (EAD).
Nov 3, 2020P00019$1.1BTHE PURPOSE OF THIS MODIFICATION IS TO ADD SLINS TO INITIATE FY21 FUNDING FOR F/A-18E/F AIRCRAFT, AND TO FIX AN ADMINISTRATIVE ERROR ON MILSTRIP #S.
Oct 2, 2020A00006$0F/A-18E AIRCRAFT
Oct 2, 2020A00007$0MOD A00007 IS FOR GFP RFNIU FROM GRANITE CITY, IL WAREHOUSE.
Sep 30, 2020P00018$762.1KMOVING ECPS TO DIFFERENT CONTRACT.
Sep 16, 2020A00005$0RFNIU REQUEST FROM GOV STORAGE IN GRANITE CITY, IL.
Sep 14, 2020P00017$500.7KFUND ECP 6462
Sep 3, 2020A00004$0MOD A00004 IS A GFP TRANSFER REQUEST.
Aug 26, 2020PZ0001$22.5MTHE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE NON-RECURRING ENGINEERING (NRE) COSTS ASSOCIATED WITH BLOCK III F/A-18 E/F SUPER HORNETS AND THE INCORPORATION OF ENGINEERING CHANGE PROPOSAL (ECP)-MDC-F/A-18 06513 "INCORPORATION OF INITIAL BLOCK III CAPABILITY" AS SUBMITTED BY BOEING LETTER DVR-014R-721102-05 DATED 08 APRIL 2020 AND AS APPROVED BY CONFIGURATION CONTROL BOARD (CCB) 2020AIR0110031R1 DATED 24 APRIL 2020. THIS MODICATION IS ALSO TO UPDATE ATTACHMENTS ATTACHMENT 19 BLK III NRE PERFORMANCE BASE PAYMENTS PLAN, ATTACHMENT 24 ECP INCORPORATION, AND ATTACHMENT 26 BLK III NRE SOW
Aug 24, 2020A00003$0MODIFICATION A00003 IS FOR THE RFNIU OF GFE.
Aug 5, 2020P00016$170.1KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATEURGENT ENGINEERING CHANGE PROPOSAL ECP MDCFA1806528, REDESIGN OF OUTBOARD LEADING EDGE FLAP 400 SERIES FIBERGLASS DOORS AS APPROVED BY NAVAIR CCB NUMBER 2020AIR2650448 DATED 28 MAY 2020
Jun 29, 2020P00015$1.9MTHIS MODIFICATION IS IN SUPPORT OF DRY BAY FIRE SUPPRESSION SYSTEM (DBFSS) OPTICAL FIRE DETECTORS (OFD) OBSOLESCENCE. A DIMINISHING MANUFACTURING SOURCES REVIEW BOARD (DMSRB) WAS CONDUCTED 2 AUGUST 2017, AT WHICH TIME THE GOVERNMENT DETERMINED AN EQUIPMENT REDESIGN WAS THE BEST SOLUTION.
Jun 18, 2020A00002$0THE PURPOSE OF THIS MOD IS TO TRANSFER GFP ON AN RFNIU BASIS FROM THE GRANITE CITY WAREHOUSE TO CONTRACT NO N0001918C1046.
Jun 18, 2020P00014$404.3KECP 6528MSG
Apr 24, 2020P00013$2.0MINCREMENTAL FUNDING FY20 FOR LOT 45 AIRCRAFT
Apr 9, 2020P00012$0THE REASON FOR THIS MODIFICATION IS TO CHANGE DELIVERY ADDRESSES FOR SLINS 0019AB, 0020AB AND 0021AB TO RECENTLY APPROVED MAPAC ADDRESS.
Jan 15, 2020P00011$3.0MTHIS EFFORT FOR THE UNITED STATES NAVY ENCOMPASS THE PRODUCT LINE RESTART OF THE COTS MULTI-CHIP MODULE LFX1200 FOR THE APG-79 BUFFER2 MODULE AS PART OF THE ANTENNA ASSEMBLY.
Dec 31, 2019P00010$10.0MTHE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING TO CLIN 0003 FOR BLK III NRE UCA.
Dec 12, 2019A00001$0MODIFICATION IS FOR THE TRANSFER OF GFP FROM THE WAREHOUSE TO THE CONTRACTOR.
Dec 5, 2019P00009$1.3BTHE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH SUBCLINS 010102, 010202, 020101,AND 020201 TO INITIATE FUNDING FOR FY 20 F/A-18E/F AIRCRAFT AND ADVANCE PROCUREMENT (AP) FUNDING FOR FY21. PID: N00019-20-NORFP-PMA-265-0109 PR: 1300825486
Dec 4, 2019P00008$0THE PURPOSE OF THIS NCIP MODIFICATION IS TO ADD ATTACHMENT 31 BLK III NRE GFP
Sep 25, 2019P00007$5.6MINCORPORATE ECP 6273C1 AND ADD BLOCK III ADDITIONAL FUNDING.
Sep 10, 2019P00006$6.8MANAV2 WRA REPLACES ALL KNOWN OBSOLETE PARTS IN THE ANAV WITH SUSTAINABLE PARTS
May 30, 2019P00005$0THE PURPOSE OF THIS NCIP MODIFICATION IS TO INCORPORATE ATTACHMENT 19 BLK III NRE PBP PLAN
May 6, 2019P00004$0ADMIN MOD
Mar 20, 2019P00003$1.6BMYPIV F/A-18
Dec 28, 2018P00002$35.0MBLOCK III NON RECURRING ENGINEERING FOR CAPABILITY UPGRADE
Oct 16, 2018P00001$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE CLAUSES AS OF JULY 2018.
May 8, 20180$41.3MF/A-18E AIRCRAFT

Estimated positioning window

Aug 31, 2027 – Feb 29, 2028

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2028-08-31 (669 days from calculation)
+25 points
187 historical awards in this buyer and category group
+15 points
125 recorded award transactions
+10 points
Latest award action: 2026-03-19
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.