Federal contract award

N0001923C0013

T408 IAF ENGINES AND COST REDUCTION INITIATIVES

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVAL AIR SYSTEMS COMMAND
NAICS336412 — Aircraft Engine and Engine Parts Manufacturing
PSC2850 — Gasoline Rotary Engines and Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$519.5M
Current contract value$570.6M
Potential contract value / ceiling$570.6M
Start dateApr 26, 2023
Current end dateJun 18, 2027
Potential end dateJun 18, 2027
Latest award activityApr 15, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 52 of 52 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 9, 2026P00022$0EXTEND CLIN 0104 PERIOD OF PERFORMANCE FROM 15 JUNE 2026 TO 3 JANUARY 2027 TO ALLOW FOR CONTINUED FSR SUPPORT AND OTHER ADMINISTRATIVE CHANGES.
Jun 9, 2026P00022$0EXTEND CLIN 0104 PERIOD OF PERFORMANCE FROM 15 JUNE 2026 TO 3 JANUARY 2027 TO ALLOW FOR CONTINUED FSR SUPPORT AND OTHER ADMINISTRATIVE CHANGES.
Apr 15, 2026P00021$0PAYMENT OFFICE UPDATE
Apr 15, 2026P00021$0PAYMENT OFFICE UPDATE
Mar 27, 2026P00020$0THE PURPOSE OF THIS MODIFCATION IS TO ADD THE TRANSPORTATION ACCOUNTING CODE FOR FMS
Mar 27, 2026P00020$0THE PURPOSE OF THIS MODIFICATION IS TO ADD THE IAF ILS TAC
Jan 27, 2026P00019$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE RFV-24-MV-MB-004
Jan 27, 2026P00019$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE RFV-24-MV-MB-004
Nov 12, 2025A00005$0THE PURPOSE OF THIS MODIFICATION IS TO MODIFY CLIN 0008, LOT 6 T408 PRODUCTION TOOLING, TO DESCOPE AND DE-OBLIGATE UNNEEDED TOOLING AS WELL AS ADD 1 BAE FADEC TEST STAND.
Nov 12, 2025A00006$0THE PURPOSE OF THIS MODIFICATION IS TO MODIFY CLIN 0008, LOT 6 T408 PRODUCTION TOOLING, TO DESCOPE AND DE-OBLIGATE UNNEEDED TOOLING AS WELL AS ADD 1 BAE FADEC TEST STAND.
Nov 12, 2025A00007$0THE PURPOSE OF THIS MODIFICATION IS TO MODIFY CLIN 0008, LOT 6 T408 PRODUCTION TOOLING, TO DESCOPE AND DE-OBLIGATE UNNEEDED TOOLING AS WELL AS ADD 1 BAE FADEC TEST STAND.
Aug 14, 2025P00018$0UPDATE ATTACHMENT (5) GFP ATTACHMENT TO ADD QTY (15) ANTI-ICING VALVES PN 5146T32P01 ADD NSP SLINS 0012AA-AC ARE ADDED FOR QTY (1) NO 2 AFT SEAL AND QTY (1) NO 2 FORWARD SEAL
Aug 14, 2025P00018$0UPDATE ATTACHMENT (5) GFP ATTACHMENT TO ADD QTY (15) ANTI-ICING VALVES PN 5146T32P01 ADD NSP SLINS 0012AA-AC ARE ADDED FOR QTY (1) NO 2 AFT SEAL AND QTY (1) NO 2 FORWARD SEAL
Apr 17, 2025P00017$0THE PURPOSE OF THIS MODIFICATION IS TO MODIFY CLIN 0008, LOT 6 T408 PRODUCTION TOOLING, TO DESCOPE AND DE-OBLIGATE UNNEEDED TOOLING AS WELL AS ADD 1 BAE FADEC TEST STAND.
Apr 17, 2025P00017$-199.7KTHE PURPOSE OF THIS MODIFICATION IS TO MODIFY CLIN 0008, LOT 6 T408 PRODUCTION TOOLING, TO DESCOPE AND DE-OBLIGATE UNNEEDED TOOLING AS WELL AS ADD 1 BAE FADEC TEST STAND.
Mar 10, 2025P00016$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J ATTACHMENT 10
Mar 10, 2025P00016$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J ATTACHMENT 10
Mar 6, 2025P00015$0CORRECT OVERFUNDING
Mar 6, 2025P00015$-0CORRECT OVERFUNDING
Feb 19, 2025A00001$0THE PURPOSE OF THIS MODIFICATION IS TO MODIFY CLIN 0008, LOT 6 T408 PRODUCTION TOOLING, TO DESCOPE AND DE-OBLIGATE UNNEEDED TOOLING AS WELL AS ADD 1 BAE FADEC TEST STAND.
Feb 19, 2025A00002$0THE PURPOSE OF THIS MODIFICATION IS TO MODIFY CLIN 0008, LOT 6 T408 PRODUCTION TOOLING, TO DESCOPE AND DE-OBLIGATE UNNEEDED TOOLING AS WELL AS ADD 1 BAE FADEC TEST STAND.
Feb 19, 2025A00003$0THE PURPOSE OF THIS MODIFICATION IS TO MODIFY CLIN 0008, LOT 6 T408 PRODUCTION TOOLING, TO DESCOPE AND DE-OBLIGATE UNNEEDED TOOLING AS WELL AS ADD 1 BAE FADEC TEST STAND.
Feb 19, 2025A00004$0THE PURPOSE OF THIS MODIFICATION IS TO MODIFY CLIN 0008, LOT 6 T408 PRODUCTION TOOLING, TO DESCOPE AND DE-OBLIGATE UNNEEDED TOOLING AS WELL AS ADD 1 BAE FADEC TEST STAND.
Nov 19, 2024P00013$0ENGINEERING CHANGE PROPOSAL (ECP) INCORPORATION
Nov 19, 2024P00013$0ENGINEERING CHANGE PROPOSAL (ECP) INCORPORATION
Nov 19, 2024P00014$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE ATTACHMENT 8, CRI, IAW CONTRACT # N00019-23-C-0013.
Nov 19, 2024P00014$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE ATTACHMENT 8, CRI, IAW CONTRACT # N00019-23-C-0013.
Nov 6, 2024P00012$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE RFV 23-MV-MB-001-R1, T408-STAGE 1 NOZZLE SET AREA REQUIREMENT. ALL OTHER TERMS AND CONDITIONS OF THE AGREEMENT HEREBY REMAIN UNCHANGED AND REMAIN IN FULL FORCE AND EFFECT.
Nov 6, 2024P00012$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE RFV 23-MV-MB-001-R1, T408-STAGE 1 NOZZLE SET AREA REQUIREMENT. ALL OTHER TERMS AND CONDITIONS OF THE AGREEMENT HEREBY REMAIN UNCHANGED AND REMAIN IN FULL FORCE AND EFFECT.
Jul 30, 2024P00011$0FUNDING IN SUPPORT OF SIX (6) VIQ SPARE ENGINES, SEPM SUPPORT FOR TWO (2) ENGINES, AND SIX (6) PAPER LOG BOOKS.
Jul 30, 2024P00011$21.0MFUNDING IN SUPPORT OF SIX (6) VIQ SPARE ENGINES, SEPM SUPPORT FOR TWO (2) ENGINES, AND SIX (6) PAPER LOG BOOKS.
Jul 18, 2024P00010$0FULLY FUND LOT 8 SPARES VIA CLINS 0246 THROUGH 0254
May 21, 2024P00009$0FUNDING FOR LOT 8 ILS AND REMAINING ENGINES
May 21, 2024P00009$34.5MFUNDING FOR LOT 8 ILS AND REMAINING ENGINES
Apr 11, 2024P00008$0THIS PURPOSE OF THIS MODIFICATION IS EXTEND THE POP FOR LOT 6-8 ILS CLINS 0002, 0104, AND 0256.
Apr 11, 2024P00008$0THIS PURPOSE OF THIS MODIFICATION IS EXTEND THE POP FOR LOT 6-8 ILS CLINS 0002, 0104, AND 0256.
Mar 29, 2024P00007$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE US NAVY APPROVED ECP 408F-001_R1, STAGE 1/2 BLADE-HIGH PRESSURE TURBINE (HPT) ROTOR METAL INJECTION MOLDING (MIM) DAMPERS.
Mar 29, 2024P00007$0APPROVED ECP
Mar 27, 2024P00006$0EXTENDING THE POP
Mar 27, 2024P00006$0POP EXTENSION & ATTACHMENT 8 UPDATE.
Mar 12, 2024P00005$0H-9 WARRANTY UPDATE
Mar 12, 2024P00005$0T408 ILS DESCOPE
Feb 8, 2024P00004$0PURPOSE OF THIS MODIFICATION IS TO UNILATERALLY FULLY FUND GE LOT 8 ENGINES, CLINS 0201 THROUGH 0236.
Feb 8, 2024P00004$117.2MPURPOSE OF THIS MODIFICATION IS TO UNILATERALLY FULLY FUND GE LOT 8 ENGINES, CLINS 0201 THROUGH 0236.
Feb 2, 2024P00003$61.8KT408 IAF PAPER LOG BOOKS
Feb 2, 2024P00003$180.8KT408 PAPER LOG BOOKS
Jan 18, 2024P00002$-145.5KREMOVE IAF SPARE PARTS
Jan 18, 2024P00002$0REMOVE IAF SPARE PARTS
Aug 15, 2023P00001$0ADMIN MOD
Aug 15, 2023P00001$0ADMIN MOD
Apr 26, 20230$153.7MT408 IAF ENGINES AND COST REDUCTION INITIATIVES
Apr 26, 20230$346.8MT408 ENGINES

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2027-06-18 (229 days from calculation)
+35 points
4 historical awards in this buyer and category group
+15 points
52 recorded award transactions
+10 points
Latest award action: 2026-04-15
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.