Federal contract award

N0001923C0021

SUBSONIC AERIAL TARGET (SSAT) BQM-177A FULL RATE PRODUCTION

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVAL AIR SYSTEMS COMMAND
NAICS336411 — Aircraft Manufacturing
PSC1550 — Drones
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$238.8M
Current contract value$238.8M
Potential contract value / ceiling$238.8M
Start dateJan 31, 2023
Current end dateAug 31, 2028
Potential end dateAug 31, 2028
Latest award activityMar 16, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 21 of 21 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 16, 2026P00020$0ADMIN MOD
Feb 23, 2026P00019$0ADMIN MOD
Jan 30, 2026P00018$61.1MTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE THE OPTION FOR LOT 7 FULL RATE PRODUCTION.
Jan 23, 2026P00017$336DEFINITIZE SLIN 2003AD AND SET TO RESERVED/NSP. ADD SLIN 2003AE TO OBLIGATE NEW FUNDING.
Jan 7, 2026P00016$-42.1KDEFINITIZE CLINS 1003, 1004AA, 1004AB, 2003AA, 2003AB, AND 2003AC. DEOBLIGATE FUNDS FROM CLINS 1003, 1004AA, 1004AB, 2003AA, 2003AB, 2003AC, AND 2003AD.
Nov 21, 2025P00015$0THE PURPOSE OF THIS NO COST MODIFICATION IS TO INCORPORATE THE APPROVED SW17 ENGINEERING CHANGE PROPOSALS WITH THE UPDATED ATTACHMENT 11 IN SECTION J OF THE CONTRACT.
Sep 25, 2025P00014$0SECTION J UPDATE
Jul 21, 2025P00013$0SECTION J UPDATE
Jun 24, 2025P00012$0THE PURPOSE OF THIS NO-COST MODIFICATION IS TO INCORPORATE THE APPROVED REQUEST FOR VARIANCE (RFV) 208BQM177RFV-102 INTO THE CONTRACT.
Apr 24, 2025P00011$0INCORPORATE NOT-SEPARATELY-PRICED CLINS TO ALLOW FOR THE DELIVERY OF CONSIDERATION UNITS.
Apr 17, 2025P00010$68.8KUNDEFINITIZED CHANGE ORDER TO CUT IN AN ECP
Feb 7, 2025P00009$0ECP IMPLEMENTATION AND GFP UPDATE.
Jan 2, 2025P00008$59.3MEXERCISE OF OPTIONS AND POP EXTENSION WITH CONSIDERATION.
Dec 4, 2024P00007$0BQM-177A FRP LOTS 4-7, MISSION KITS, & RATO KITS. ECP CUT IN.
Oct 10, 2024P00006$0UPDATE SECTION J AND SECTION C TO ADD RFV
Sep 12, 2024P00005$0UPDATE SECTION J TO ADD IMPLEMENTED ECP ATTACHMENT.
Apr 17, 2024P00004$0BQM-177A FRP LOTS 4-7
Jan 30, 2024P00003$57.7MBQM-177A FRP LOT 5 OPTION EXERCISE. INCLUSION OF FAR 52.204-27 AND DFARS 252.225-7058.
Dec 5, 2023P00002$0DELIVERY EXTENSION FOR CLINS 0003, 0010, 0011, 0013, 0014, 0015, 0016, AND 0018. DOCUMENT CONSIDERATION FOR EXTENSION. ADD GFP LIST. ADD CLAUSE DFARS 252.225-7058.
Mar 30, 2023P00001$11.1MBQM-177A FRP LOT 4 QUANTITY INCREASE
Jan 31, 20230$49.6MSUBSONIC AERIAL TARGET (SSAT) BQM-177A FULL RATE PRODUCTION

Estimated positioning window

Aug 31, 2027 – Feb 29, 2028

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2028-08-31 (669 days from calculation)
+25 points
12 historical awards in this buyer and category group
+15 points
21 recorded award transactions
+10 points
Latest award action: 2026-03-16
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.