Federal contract award
N0001924C0006
WRA-7/8 B-KITS AND LBDRS FOR RAAF
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | NAVAL AIR SYSTEMS COMMAND |
| NAICS | 336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| PSC | 1560 — Airframe Structural Components |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $51.6M |
| Current contract value | $51.6M |
| Potential contract value / ceiling | $51.6M |
| Start date | Mar 29, 2024 |
| Current end date | Aug 31, 2027 |
| Potential end date | Aug 31, 2027 |
| Latest award activity | Apr 30, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 16 of 16 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 30, 2026 | P00007 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION H, |
| Apr 30, 2026 | P00007 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION H. |
| Apr 24, 2026 | P00006 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE DELIVERY DATES IN SECTION F. |
| Apr 24, 2026 | P00006 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE DELIVERY DATES IN SECTION F. |
| Mar 17, 2026 | P00005 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADD GFP TO N0001924C0006 AND UPDATE DFARS 252.232-7006 TO INCLUDE "SHIP-FROM" LOCATIONS OF 97942, 15055, 2S209, 25512, AND 04804. |
| Mar 17, 2026 | P00005 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADD GFP TO N0001924C0006 AND UPDATE DFARS 252.232-7006 TO INCLUDE "SHIP-FROM" LOCATIONS OF 97942, 15055, 2S209, 25512, AND 04804. |
| Dec 19, 2025 | P00004 | $141.2K | ADD CLIN 0009, ESS TESTING FOR LBDRS, IN SUPPORT OF DELIVERIES OF CLINS 0005-0008. AS CONSIDERATION, THE DELIVERY DATES FOR CLINS 0005-0008 HAVE ALSO BEEN UPDATED. IN ADDITION, ATTACHMENTS 1 (SOW), 4 (CSDR PLAN) AND 7 (GFP LIST) ARE ALSO UPDATED. |
| Dec 19, 2025 | P00004 | $453.5K | ADD CLIN 0009, ESS TESTING FOR LBDRS, IN SUPPORT OF DELIVERIES OF CLINS 0005-0008. AS CONSIDERATION, THE DELIVERY DATES FOR CLINS 0005-0008 HAVE ALSO BEEN UPDATED. IN ADDITION, ATTACHMENTS 1 (SOW), 4 (CSDR PLAN) AND 7 (GFP LIST) ARE ALSO UPDATED. |
| Feb 26, 2025 | P00003 | $0 | THIS NO-COST MODIFICATION IS TO REPLACE ATTACHMENT 7, GFP MODULE LIST, WITH AN UPDATED GFP MODULE LIST IN SECTION J. ADDITIONALLY, ATTACHMENT 4, CSDR PLAN WAS REPLACED AND UPDATED TO INCLUDE THE ASE WRA 7-8 AND LBDR FY 23/24 BUYS IN SECTION J. |
| Feb 26, 2025 | P00003 | $0 | THIS NO-COST MODIFICATION IS TO REPLACE ATTACHMENT 7, GFP MODULE LIST, WITH AN UPDATED GFP MODULE LIST IN SECTION J. ADDITIONALLY, ATTACHMENT 4, CSDR PLAN WAS REPLACED AND UPDATED TO INCLUDE THE ASE WRA 7-8 AND LBDR FY 23/24 BUYS IN SECTION J. |
| Feb 14, 2025 | P00002 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J AND ADD CLAUSE 52.240-1 TO SECTION I. |
| Feb 14, 2025 | P00002 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE SECTION J AND ADD FAR 52.240-1 TO SECTION I. |
| Sep 23, 2024 | P00001 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO (1) UPDATE SLIN 0001AC, CLIN 0003 AND CLIN 0008 WITH ADDITIONAL FMS DETAILS (2) REMOVE DTXT.247-9510 (3) ADD A RFNIU GFP TO HTXT.245-0001, AND (4) UPDATE ATTACHMENTS 7, 12 AND 14 TO REFLECT POST AWARD CHANGES. |
| Sep 23, 2024 | P00001 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO (1) UPDATE SLIN 0001AC, CLIN 0003 AND CLIN 0008 WITH ADDITIONAL FMS DETAILS (2) REMOVE DTXT.247-9510 (3) ADD A RFNIU GFP TO HTXT.245-0001, AND (4) UPDATE ATTACHMENTS 7, 12 AND 14 TO REFLECT POST AWARD CHANGES. |
| Mar 29, 2024 | 0 | $9.2M | WRA-7/8 B-KITS AND LBDRS FOR RAAF |
| Mar 29, 2024 | 0 | $51.2M | WRA-7/8 B-KITS AND LBDRS FOR USN |
Estimated positioning window
Nov 1, 2026 – Feb 28, 2027
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2027-08-31 (303 days from calculation)
- +35 points
- 29 historical awards in this buyer and category group
- +15 points
- 16 recorded award transactions
- +10 points
- Latest award action: 2026-04-30
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.