Federal contract award

N0001924F0123

LONG LEAD PARTS PROCUREMENT IN SUPPORT OF THE RDP TECH REFRESH.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVAL AIR SYSTEMS COMMAND
NAICS336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
PSC5841 — Radar Equipment, Airborne
Parent award / vehicleN0001923G0002
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$6.3M
Current contract value$6.3M
Potential contract value / ceiling$6.3M
Start dateFeb 15, 2024
Current end dateDec 18, 2026
Potential end dateDec 18, 2026
Latest award activityJun 4, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 4, 2026P00009$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE DELIVERY SCHEDULE FOR CONTRACT LINE ITEM NUMBERS (CLINS) 0001-0005 IN SUPPORT OF RDP TECH REFRESH LONG LEADS PARTS PROCUREMENT EFFORT.
Apr 20, 2026P00007$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE ATTACHMENT (1) STATEMENT OF WORK, ADD CONTRACT DATA REQUIREMENTS LIST (CDRL) EXHIBIT S AND DELETE CDRL EXHIBIT T002 IN SUPPORT OF RDP TECH REFRESH LONG LEADS PARTS PROCUREMENT.
Apr 20, 2026P00008$-0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE DELIVERY SCHEDULE ON CONTRACT LINE ITEM NUMBERS (CLINS) 0006-0008, UPDATE CLIN 0002AA-0002AF AND UPDATE ATTACHMENT (2) TC LIST.
Mar 4, 2026P00006$187.3KINCREMENTAL FUNDING CLIN 0006. NOW FULLY FUNDED
Aug 20, 2025P00005$0NO COST POP EXTENSION FOR LOE PM/ENG. CLINS 0001 - 0005
Apr 28, 2025P00004$2.1MTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING ON CONTRACT LINE ITEM NUMBER (CLIN) 0006, NRE, IN SUPPORT OF RADAR HIGH VOLUME TRACKS IN SUPPORT OF THE H60 PROGRAM.
Mar 13, 2025P00003$400.0KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE FUNDING ON CONTRACT LINE ITEM NUMBER (CLIN) 0006, NRE, TO SUPPORT RDP TECH REFRESH LONG LEADS PART PROCUREMENT.
Nov 21, 2024P00002$1.1MTHIS NRE MOD TO RDP-TR-LL PARTS BOA IS TO DEVELOP, INTEGRATE, AND TEST APS-153 SW FOR SC26 TO PROVIDE INCREASED RADAR AND IFF INTERROGATOR TRACK CAPACITY OUTPUT VIA MH-60R SHIP DATA LINK, TO SUPPORT SURFACE SHIP TERMINAL MINOTAUR TRACKS PROCESSING.
Apr 17, 2024P00001$-0THE PURPOSE OF THIS MODIFICATION IS TO (1) IN SECTION B, DELETE AND REPLACE THE "QUANTITY" FOR CONTRACT LINE ITEM NUMBER (CLIN) 0002AD AND (2) IN SECTION F, DELETE AND REPLACE THE "QUANTITY" FOR CLIN 0002AD.
Feb 26, 20240$2.5MLONG LEAD PARTS PROCUREMENT IN SUPPORT OF THE RDP TECH REFRESH.

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2026-12-18 (47 days from calculation)
+35 points
10 historical awards in this buyer and category group
+15 points
10 recorded award transactions
+10 points
Latest award action: 2026-06-04
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.