Federal contract award

N0001925F5002

THIS TASK ORDER (TO) IS FOR REACH BACK ENGINEERING AND MATERIAL SUPPORT FOR THE INSTALLATION OF UPGRADED AUXILIARY POWER UNIT (APU) KITS DURING BLOCK II INTEGRATED MODIFICATION AND MAINTENANCE CONCEPT (IMMC) INSTALLATION ON THE E-6B AIRCRAFT.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVAL AIR SYSTEMS COMMAND
NAICS336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
PSCR425 — Engineering and Technical Services
Parent award / vehicleN0001924G0004
Set-asideNO SET ASIDE USED.
Pricing typeTIME AND MATERIALS
Obligations$383.8K
Current contract value$383.8K
Potential contract value / ceiling$678.3K
Start dateSep 25, 2025
Current end dateDec 31, 2026
Potential end dateDec 31, 2027
Latest award activityMar 19, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 19, 2026P00002$0THIS TASK ORDER (TO) IS FOR REACH BACK ENGINEERING AND MATERIAL SUPPORT FOR THE INSTALLATION OF UPGRADED AUXILIARY POWER UNIT (APU) KITS DURING BLOCK II INTEGRATED MODIFICATION AND MAINTENANCE CONCEPT (IMMC) INSTALLATION ON THE E-6B AIRCRAFT.
Dec 22, 2025P00001$288.0KTHIS TASK ORDER (TO) IS FOR REACH BACK ENGINEERING AND MATERIAL SUPPORT FOR THE INSTALLATION OF UPGRADED AUXILIARY POWER UNIT (APU) KITS DURING BLOCK II INTEGRATED MODIFICATION AND MAINTENANCE CONCEPT (IMMC) INSTALLATION ON THE E-6B AIRCRAFT.
Sep 25, 20250$95.8KTHIS TASK ORDER (TO) IS FOR REACH BACK ENGINEERING AND MATERIAL SUPPORT FOR THE INSTALLATION OF UPGRADED AUXILIARY POWER UNIT (APU) KITS DURING BLOCK II INTEGRATED MODIFICATION AND MAINTENANCE CONCEPT (IMMC) INSTALLATION ON THE E-6B AIRCRAFT.

Estimated positioning window

Dec 31, 2026 – Jun 30, 2027

Modeled likelihood: 60%. These are AcornBids estimates, not confirmed solicitation dates.

{
  "psc": "R425",
  "naics": "336413",
  "agency": "Department of Defense",
  "office": "NAVAL AIR SYSTEMS COMMAND",
  "vehicle": "N0001924G0004",
  "incumbent": "L3HARRIS TECHNOLOGIES INTEGRATED SYSTEMS L.P.",
  "known_forecast": false,
  "option_end_date": "2027-12-31",
  "contract_end_date": "2027-12-31",
  "latest_action_date": "2026-03-19",
  "modification_count": 3,
  "historical_award_count": 12,
  "historical_cadence_days": 146
}

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  4. Check the stated set-aside against the solicitation and current certifications.
  5. Review the award scope and buyer evidence before making a bid/no-bid decision.