Federal contract award

N0002416C2111

IGF::OT::IGF VCS LEAD YARD SERVICES

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeSUP OF SHIPBUILDING GROTON
NAICS541330 — Engineering Services
PSCAC35 — NATIONAL DEFENSE R&D SVCS; DEFENSE-RELATED ACTIVITIES; R&D FACILITIES & MAJ EQUIP
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$1.5B
Current contract value$1.6B
Potential contract value / ceiling$1.6B
Start dateAug 26, 2016
Current end dateNov 30, 2026
Potential end dateNov 30, 2026
Latest award activityJun 4, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 476 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 4, 2026A00379$0NO COST PERIOD OF PERFORMANCE (POP) EXTENSION MODIFICATION TO COMPLETE THE REMAINING PHASE II ENVIRONMENTAL SHOCK QUALIFICATION TESTING AND ANALYSIS.
Jun 4, 2026A00380$0DESIGN HYDRAULIC SYSTEM
Apr 1, 2026A00378$1.4MCONTROLS SYSTEM REDESIGN
Feb 19, 2026A00377$0NO COST MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE TO CONTINUE WORKING THE REDESIGN EFFORTS.
Feb 10, 2026A00376$0CONTROLS SYSTEMS REDESIGN
Jan 29, 2026A00375$0RELEASE OF CLAIMS THROUGH DECEMBER 2024
Nov 13, 2025A00374$1.3MADDING COST OVER RUN FUNDS FOR MAIN PROPULSION MACHINERY CONTROL SYSTEM REDESIGN PHASE III TESTING
Nov 4, 2025A00373$0RELEASE OF CLAIMS THROUGH 30 JUNE 2024
Sep 24, 2025A00372$0NO COST PERIOD OF PERFORMANCE EXTENSION FOR VPM AIR REDUCING MANIFOLD DEVELOPMENT
Sep 17, 2025A00370$0NO COST PERIOD OF PERFORMANCE EXTENSION FOR THE BLK V (ICCP) IMPRESSED CATHODIC PROTECTION REDESIGN
Sep 17, 2025A00371$78.6KSWITCHBOARD DESIGN, MANUFACTURE, AND QUALIFICATION
Aug 27, 2025A00369$0DIRECT CURRENT MOTOR CONTROLLER REDESIGN
Aug 25, 2025A00368$0NO COST PERIOD OF PERFORMANCE EXTENSION
Aug 21, 2025A00367$750.0KFUNDING WAS INCREASE FOR THE CONTROLS REDESIGN
Aug 18, 2025A00365$0EXTENDED THE PERIOD OF PERFORMANCE FOR THE CRADLE LOCK
Aug 18, 2025A00366$209.7KCRADLE LOCK REDESIGN
Aug 7, 2025P00065$0LEAD YARD SERVICES
Jul 29, 2025P00064$335.8KLEAD YARD SERVICES
Jul 28, 2025P00063$1.5MLEAD YARD SERVICES
Jun 26, 2025A00364$1.5MADDING FUNDS TO THE MULTI-CLASS STATIC AUTOMATIC BUS TRANSFER (MC-SABT)OBSOLESCENCE AND REDESIGN AND PERIOD OF PERFORMANCE EXTENSION.
Jun 25, 2025A00363$0DESIGN HYDRAULIC SYSTEM
May 29, 2025A00362$-3.0MTECHNOLOGY INSERTION DEVELOPMENT EFFORTS
May 21, 2025A00361$3.0MTECHNOLOGY INSERTION DEVELOPMENT EFFORTS
May 7, 2025A00360$0PERIOD OF PERFORMANCE EXTENSION REQUEST NO COST
May 5, 2025A00358$0CATHODIC REDESIGN
May 5, 2025A00359$0CONTROL SYSTEM REDESIGN
May 2, 2025A00357$750.0KCONTROL SYSTEM REDESIGN
Apr 8, 2025A00356$0PERIOD OF PERFORMANCE EXTENSION REQUEST NO COST
Apr 2, 2025A00355$0RELEASE OF CLAIMS THROUGH DECEMBER 2023
Apr 1, 2025A00354$0RELEASE OF CLAIMS THROUGH 30 JUNE 2023
Mar 12, 2025A00353$4.3MADJUDICATED MODIFICATION OF ORDER 6121.006
Mar 7, 2025A00352$0PERIOD OF PERFORMANCE EXTENSION
Feb 14, 2025A00351$0ADMINISTRATIVE MODIFICATION
Feb 13, 2025A00349$0ORDER 6016 PERIOD OF PERFORMANCE EXTENSION
Feb 13, 2025A00350$750.0KFUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION
Feb 4, 2025A00348$0LEAD YARD SERVICES - EXTEND THE PERIOD OF PERFORMANCE
Jan 30, 2025A00347$0EXTENSION THE PERIOD OF PERFORMANCE
Dec 13, 2024A00346$500.0KCONTROL SYSTEM REDESIGN.
Nov 26, 2024A00344$0LEAD YARD SERVICES PERIOD OF PERFORMANCE EXTENSION
Nov 26, 2024A00345$0PERIOD PERFORMANCE EXTENSION
Nov 20, 2024A00343$750.0KORDER 6121 FUNDING INCREASE - CONTROLS SYSTEM REDESIGN
Oct 11, 2024A00342$326.7KELECTRONIC GROUNDING UNIT (EGU) REDESIGN DUE TO OBSOLESCENCE
Aug 29, 2024A00341$500.0KORDER 6141 FUNDING INCREASE
Aug 1, 2024A00340$750.0KORDER 6121 FUNDING INCREASE - CONTROLS SYSTEM REDESIGN
Jun 20, 2024A00339$0PERIOD OF PERFORMANCE EXTENSION FOR THIS ORDER
Jun 3, 2024A00338$750.0KORDER 6121 FUNDING INCREASE
May 28, 2024A00337$0LEAD YARD SERVICES. EXTEND THE PERIOD OF PERFORMANCE
May 23, 2024A00336$450.0KORDER 6141 FUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION
May 16, 2024A00335$0EXTENSION OF PERIOD OF PERFORMANCE
Apr 24, 2024A00334$0ORDER 6143 PERIOD OF PERFORMANCE EXTENSION
Apr 11, 2024A00333$0ORDER 6141 PERIOD OF PERFORMANCE EXTENSION
Mar 19, 2024A00332$1.2MFUNDING INCREASE FOR THE REDESIGN OF THE CONTROL SYSTEM
Mar 7, 2024A00331$0ORDER 6122 PERIOD OF PERFORMANCE EXTENSION
Feb 13, 2024A00330$-198.7KORDER 6137 DE-OBLIGATION OF FUNDS
Jan 18, 2024A00328$820.0KORDER 6121 FUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION
Jan 18, 2024A00329$900.0KCONTROL SYSTEM REDESIGN.
Jan 12, 2024A00327$0ORDER 6108.001 PERIOD OF PERFORMANCE EXTENSION
Dec 19, 2023A00325$0ORDER 6112 PERIOD OF PERFORMANCE EXTENSION
Dec 19, 2023A00326$0RELEASE OF CLAIMS THROUGH DECEMBER 2022
Dec 13, 2023A00324$0ORDER 6122 PERIOD OF PERFORMANCE EXTENSION
Dec 12, 2023A00323$0ORDER 6119 PERIOD OF PERFORMANCE EXTENSION
Dec 11, 2023A00322$0RELEASE OF CLAIMS MOD
Nov 22, 2023A00321$0PERIOD OF PERFORMANCE EXTENSION FOR MAIN PROPULSION MACHINERY CONTROL SYSTEMS
Nov 17, 2023A00319$0ORDER 6136 PERIOD OF PERFORMANCE EXTENSION
Nov 17, 2023A00320$1.8MORDER 6121 FUNDING INCREASE
Oct 6, 2023P00062$3.0MLEAD YARD SERVICES
Oct 3, 2023A00318$0ORDER 6016 PERIOD OF PERFORMANCE EXTENSION
Sep 20, 2023A00317$81.8KFUNDING INCREASE FOR VENTILATION VALVE FOR VIRGINIA PAYLOAD MODULE
Sep 13, 2023A00314$0ORDER 6117 PERIOD OF PERFORMANCE EXTENSION
Sep 13, 2023A00315$0EXTEND THE PERIOD OF PERFORMANCE FOR THE REDESIGN OF THE CRADLE LOCK ELECTROMECHANICAL POWER CONDITIONER AND CONTROLLER
Sep 13, 2023A00316$0ORDER 6118 PERIOD OF PERFORMANCE EXTENSION.
Sep 8, 2023A00313$0EXTEND THE PERIOD OF PERFORMANCE FOR DIESEL GENERATOR
Sep 6, 2023A00310$750.0KINCREASE FUNDING AND EXTEND THE PERIOD OF PERFORMANCE
Sep 6, 2023A00311$-39.1KORDER 6139 DE-OBLIGATION OF FUNDS
Sep 6, 2023A00312$0ADMINISTRATIVE MODIFICATION TO CORRECT PAGE 2 ON MODIFICATION AZ0031.
Aug 11, 2023A00308$758.0KORDER 6121 FUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION
Aug 11, 2023A00309$268.1KCONTROL SYSTEM REDESIGN.
Aug 10, 2023A00307$0ORDER 6143 PERIOD OF PERFORMANCE EXTENSION
Jul 20, 2023A00306$0PERIODIC RELEASE OF CLAIMS
May 30, 2023A00305$0EXTENDING THE PERIOD OF PERFORMANCE FOR THIS CHANGE
May 19, 2023A00304$0ADMINISTRATIVE MODIFICATION TO CORRECT AN ERROR ON PAGE 2.
May 11, 2023A00303$1.3MORDER 6141 FUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION
May 10, 2023A00302$1.0MORDER 6121 FUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION
May 10, 2023P00061$417.5KLEAD YARD SUPPORT
Mar 29, 2023A00301$676.3KCONTROL SYSTEM REDESIGN.
Mar 28, 2023AZ0033$2.5MORDER 6135 FULLY PRICED SUPPLEMENTAL AGREEMENT: MULTI-CLASS AUTOMATIC BUS TRANSFER OBSOLESCENCE AND REDESIGN
Mar 24, 2023AZ0032$583.3KADJUDICATING MOD AND PERIOD OF PERFORMANCE EXTENSION.
Mar 9, 2023A00300$1.0MORDER 6121 - COST INCREASE AND PERIOD OF PERFORMANCE EXTENSION
Feb 10, 2023A00299$0NO COST PERIOD OF PERFORMANCE EXTENSION
Jan 19, 2023A00297$1.3MFUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION
Jan 19, 2023A00298$0EXTENSION OF THE PERIOD OF PERFORMANCE FOR THIS CONTRACT CHANGE.
Dec 19, 2022A00296$0LEAD YARD SERVICES PERIOD OF PERFORMANCE EXTENSION
Nov 22, 2022A00295$1.0MORDER 6121 - COST INCREASE & PERIOD OF PERFORMANCE EXTENSION
Nov 7, 2022A00294$1.6MORDER 6141 - COST INCREASE & PERIOD OF PERFORMANCE EXTENSION
Sep 23, 2022A00293$0JUNE 2021 RELEASE OF CLAIMS
Sep 12, 2022A00291$895.6KLEAD YARD SERVICES MPM CONTROLS REDESIGN PHASE III
Sep 12, 2022A00292$535.3KFUNDING ONLY ACTION
Sep 2, 2022A00290$-125.1KORDER 6006 - FUNDING DE-OBLIGATION
Aug 26, 2022A00288$1.1MLEAD YARD SERVICES MPM CONTROL SYSTEM REDESIGN PHASE III
Aug 26, 2022A00289$800.0KLEAD YARD SERVICES MAIN PROPULSION MACHINERY (MPM) CONTROL REDESIGN SYSTEM PHASE II
Aug 3, 2022A00287$-358.4KLEAD YARD SERVICES - LOAD CENTER SWITCHBOARD
Jul 27, 2022A00285$0ORDER 6016 - POP EXTENSION
Jul 27, 2022A00286$0ORDER 6112 PERIOD OF PERFORMANCE EXTENSION
Jul 26, 2022A00284$0PERIOD OF PERFORMANCE EXTENTION
Jul 13, 2022A00283$1.5MLEAD YARD SERVICES - MPM CONTROLS REDESIGN PHASE III
Jun 30, 2022A00282$600.0KORDER 6121 - FUNDING INCREASE
Jun 16, 2022A00281$328.4KORDER 6141 - FUNDING INCREASE
Jun 7, 2022A00280$773.4KFUNDING TO 75% OF THE PROPOSED AMOUNT
Jun 2, 2022A00278$0JUN 2020 RELEASE OF CLAIMS
Jun 2, 2022A00279$0PERIODIC RELEASE OF CLAIMS N00024-16-C-2111 DECEMBER 2021
May 19, 2022A00277$08101 ADMIN MOD
May 16, 2022A00276$36.0KORDER 6119 PERIOD OF PERFORMANCE EXTENSION WITH FUNDING
May 13, 2022A00275$621.5KPERIOD OF PERFORMANCE EXTENSION & FUNDING FOR 6121
Apr 27, 2022A00274$778.4KBEARING REPLACEMENT.
Apr 6, 2022A00273$723.4KORDER 6141 COST GROWTH FUNDING MODIFICATION
Apr 1, 2022A00271$-400.0KMOD TO PROVIDE ADDITIONAL COST GROWTH FUNDING TO ENSURE CONTINUED PERFORMANCE AND TO EXTEND THE PERIOD OF PERFORMANCE
Apr 1, 2022A00272$0ORDER 6141 PERIOD OF PERFORMANCE EXTENSION
Mar 21, 2022A00270$0ORDER 6112 - POP EXTENSION
Mar 17, 2022A00269$0INCREASE OF THE LEVEL OF EFFORT HOURS
Mar 16, 2022A00268$0ORDER 8103.004 INCREASE LOE
Mar 2, 2022A00267$740.0KADDITIONAL FUNDING BECAUSE OF COST GROWTH
Feb 25, 2022A00265$386.0KLEAD YARD SERVICES, STERN AREA SYSTEM (SAS)- INCREASE IN LEVEL OF EFFORT
Feb 25, 2022A00266$0INCREASE OF THE LEVEL OF EFFORT HOURS
Jan 25, 2022A00263$-750.0KCLIN 8101 ORDER 8101.002 - DE-OBLIGATION
Jan 25, 2022A00264$801.6KCOST GROWTH FUNDING FOR CLIN 6121
Jan 20, 2022A00262$0CLIN 6129 PERIOD OF PERFORMANCE EXTENSION
Jan 18, 2022A00260$0POP EXTENSION
Jan 18, 2022A00261$0POP EXTENSION CLIN 6112
Jan 13, 2022A00259$0GOVERNMENT PROPERTY TRANSFER
Jan 11, 2022A00258$0POP EXTENSION CLIN 6118
Jan 4, 2022A00257$0UPDATED SUBCONTRACT PLAN
Dec 23, 2021A00256$0ADMIN MODIFICATION TO CORRECT PREVIOUSLY RELEASED MODIFICATION A00253, EXECUTED 21 DEC 2021
Dec 22, 2021A00254$1.0MCOST GROWTH 6141
Dec 22, 2021A00255$0EXTEND PERIOD OF PERFORMANCE ON CLIN 6125
Dec 21, 2021A00253$1.5MPOINT CHANGE 6108.001 - ELECTRONIC GROUNDING UNIT (EGU) OBSOLESCENCE
Dec 10, 2021A00252$0CLINS 8000, 8101, 8102, 8103 POP EXTENSIONS
Dec 7, 2021AZ0031$1.1MORDER 6143 FPSA DC MOTOR CONTROLLER
Nov 19, 2021A00251$1.5MCLIN 6141 COST GROWTH
Nov 9, 2021A00250$0ORDER 6141 POP EXTENSION
Nov 5, 2021A00249$0ORDER 6136 - POP EXTENSION
Oct 29, 2021A00248$800.0KCLIN 6121 COST GROWTH AND PERIOD OF PERFORMANCE EXTENSION
Oct 14, 2021AZ0030$557.7KCLIN 6122 POINT CHANGE 6122.001 CRADLE LOCK REDESIGN ADJUDICATING MOD
Oct 12, 2021A00247$75.4KCLIN 6107 FUNDING ONLY
Oct 4, 2021A00246$0CLIN 6131 POP EXTENSION
Sep 30, 2021A00243$1.7MCLIN 6141 POP EXTENSION & COST GROWTH
Sep 30, 2021A00244$0ORDER 6108 POP EXTENSION
Sep 30, 2021A00245$517.9KORDER 6143 INCREASE OF LIMITATION OF GOVERNMENT LIABILITY TO 75% AND INCREASE OF PERIOD OF PERFORMANCE
Sep 29, 2021A00241$0CLIN 6125 SWAP FUNDING AND POP EXTENSION
Sep 29, 2021A00242$0CLIN 6121 POP EXTENSION
Sep 23, 2021A00240$1.0MINCREASE LEVEL OF EFFORT FOR CLIN 8000
Sep 17, 2021A00238$0CLIN 8101 ADMIN MOD CORRECTING A00233
Sep 17, 2021A00239$500.0KADDITIONAL LEVEL OF EFFORT FOR CLIN 8101
Sep 3, 2021A00237$0ADMIN TO CORRECT CLIN 6141 ACCOUNTING DATA
Aug 17, 2021A00236$0CLIN 6125 POP EXT. TO 30 SEPTEMBER 2021
Aug 13, 2021A00235$1.6MCLIN 6141 COST GROWTH
Aug 3, 2021A00233$0BARGE RENTAL EXTENSION CLIN 8101
Aug 3, 2021A00234$1.6MCLIN 6141 COST GROWTH
Jul 29, 2021A00232$0CLIN 6137 PERIOD OF PERFORMANCE EXTENSION
Jul 27, 2021A00231$3.3MUCA FOR ORDER 6135 - MULTI CLASS AUTOMATIC BUS TRANSFER
Jul 15, 2021A00230$0TRANSFERRED GFP FROM 05-C-2103 (A00172)
Jul 13, 2021A00228$0UPDATED ACCOUNTING DATA FOR CLIN 6121
Jul 13, 2021A00229$0ORDER 6117.001 POP EXTENSION
Jul 8, 2021A00227$0ORDER 6119 POP EXTENSION FOR LYS
Jul 7, 2021A00226$1.4MCOST GROWTH FUNDING AND POP EXTENSION
Jun 30, 2021A00225$0CLIN 8102 ADDITIONAL LEVEL OF EFFORT HOURS
Jun 29, 2021A00224$0ADMINISTRATIVE MODIFICATION TO IMPLEMENT NAVSEA 0400-AD-URM-010 (TAG OUT USERS MANUAL), REV 7, ACN 1/A AND ACN 2/A
Jun 24, 2021A00223$0POP EXTENSION - LEAD YARD SERVICES CLINS 8000, 8101, 8102, 8103
Jun 23, 2021A00222$0CLIN 8101 INCREASES LEVEL OF EFFORT HOURS
Jun 10, 2021A00221$0ADMIN MOD TO CORRECT BLOCK 13 ON A00220
Jun 9, 2021A00220$2.1MFUNDING FOR COST GROWTH ON CLIN 6141
Jun 8, 2021AZ0029$1.0MORDER 6108 - ELECTRONIC GROUNDING REDESIGN (EGU)
May 25, 2021A00219$2.7MADDITIONAL LEVEL OF EFFORT HOURS FOR CLIN 8000
May 14, 2021A00218$0EXTEND PERIOD OF PERFORMANCE FOR CLIN 6118
May 8, 2021A00217$1.4MCLIN 6141 COST GROWTH FUNDING
May 3, 2021A00216$1.7MCLIN 8000 ADDITIONAL LEVEL OF EFFORT (LOE) HOURS
Apr 28, 2021A00215$0ORDER 8101 INCREASE OF LEVEL OF EFFORT (LOE) HOURS
Apr 27, 2021A00214$42.9KCLIN 6143 LOL INCREASE MOD
Apr 21, 2021A00213$0CLIN 6137 POP EXTENSION
Apr 19, 2021A00212$0ADMINISTRATIVE MODIFICATION TO CORRECT PREVIOUSLY EXECUTED MODIFICATION A00134
Apr 16, 2021A00211$0CLIN 6125 PERIOD OF PERFORMANCE (POP) EXTENSION
Apr 1, 2021A00210$0LEAD YARD SERVICES POP EXTENSION
Mar 26, 2021A00209$1.4MCOST GROWTH FUNDING FOR CLIN 6141
Mar 25, 2021P00060$0LEAD YARD SERVICES
Mar 18, 2021A00208$203.6KLEAD YARD SERVICES 6117.001 ADJUDICATED MOD
Mar 16, 2021A00207$709.9KINCREASE LOE FOR CLIN 8000 AND CORRECT SPS BEHIND THE SCENES.
Feb 26, 2021A00206$420.7KFUNDING FOR CLIN 6121
Feb 22, 2021A00205$0LEAD YARD SERVICES CLIN 6137 POP EXTENSION
Feb 11, 2021A00204$0EXTEND PERIOD OF PERFORMANCE FOR CLIN 6131
Feb 9, 2021A00203$3.6MLEAD YARD SERVICES FUNDING MOD
Jan 20, 2021A00201$0CLIN 8000 INCREASE OF LOE
Jan 20, 2021A00202$0ORDER 8102 LEVEL OF EFFORT (LOE) HOURS INCREASE
Jan 14, 2021A00200$1.8MCOST GROWTH CLIN 6141
Dec 17, 2020A00198$0CLIN 6137 POP EXTENSION
Dec 17, 2020A00199$0RELEASE OF CLAIMS DEC 2019
Dec 16, 2020A00197$0CLIN 6107/.001 PERIOD OF PERFORMANCE EXTENSION
Dec 14, 2020A00196$0ORDER 6122/.001 POP EXTENSIONS
Dec 11, 2020A00195$0ORDER 6113 POP EXTENSION
Dec 4, 2020AZ0028$40.9KADJUDICATE POINT CHANGE 6121.004 ON PHASE II COMMON WEAPON LAUNCH SOFTWARE UPGRADE
Dec 3, 2020A00194$713.1KLEAD YARD SERVICES INCREASE FUNDING
Dec 1, 2020A00193$352.5KCLIN 6016, ORDER 6016 - INCREMENTAL FUNDING

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2026-11-30 (29 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
476 recorded award transactions
+10 points
Latest award action: 2026-06-04
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.