Federal contract award
N0002416C2111
IGF::OT::IGF VCS LEAD YARD SERVICES
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | SUP OF SHIPBUILDING GROTON |
| NAICS | 541330 — Engineering Services |
| PSC | AC35 — NATIONAL DEFENSE R&D SVCS; DEFENSE-RELATED ACTIVITIES; R&D FACILITIES & MAJ EQUIP |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $1.5B |
| Current contract value | $1.6B |
| Potential contract value / ceiling | $1.6B |
| Start date | Aug 26, 2016 |
| Current end date | Nov 30, 2026 |
| Potential end date | Nov 30, 2026 |
| Latest award activity | Jun 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 476 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 4, 2026 | A00379 | $0 | NO COST PERIOD OF PERFORMANCE (POP) EXTENSION MODIFICATION TO COMPLETE THE REMAINING PHASE II ENVIRONMENTAL SHOCK QUALIFICATION TESTING AND ANALYSIS. |
| Jun 4, 2026 | A00380 | $0 | DESIGN HYDRAULIC SYSTEM |
| Apr 1, 2026 | A00378 | $1.4M | CONTROLS SYSTEM REDESIGN |
| Feb 19, 2026 | A00377 | $0 | NO COST MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE TO CONTINUE WORKING THE REDESIGN EFFORTS. |
| Feb 10, 2026 | A00376 | $0 | CONTROLS SYSTEMS REDESIGN |
| Jan 29, 2026 | A00375 | $0 | RELEASE OF CLAIMS THROUGH DECEMBER 2024 |
| Nov 13, 2025 | A00374 | $1.3M | ADDING COST OVER RUN FUNDS FOR MAIN PROPULSION MACHINERY CONTROL SYSTEM REDESIGN PHASE III TESTING |
| Nov 4, 2025 | A00373 | $0 | RELEASE OF CLAIMS THROUGH 30 JUNE 2024 |
| Sep 24, 2025 | A00372 | $0 | NO COST PERIOD OF PERFORMANCE EXTENSION FOR VPM AIR REDUCING MANIFOLD DEVELOPMENT |
| Sep 17, 2025 | A00370 | $0 | NO COST PERIOD OF PERFORMANCE EXTENSION FOR THE BLK V (ICCP) IMPRESSED CATHODIC PROTECTION REDESIGN |
| Sep 17, 2025 | A00371 | $78.6K | SWITCHBOARD DESIGN, MANUFACTURE, AND QUALIFICATION |
| Aug 27, 2025 | A00369 | $0 | DIRECT CURRENT MOTOR CONTROLLER REDESIGN |
| Aug 25, 2025 | A00368 | $0 | NO COST PERIOD OF PERFORMANCE EXTENSION |
| Aug 21, 2025 | A00367 | $750.0K | FUNDING WAS INCREASE FOR THE CONTROLS REDESIGN |
| Aug 18, 2025 | A00365 | $0 | EXTENDED THE PERIOD OF PERFORMANCE FOR THE CRADLE LOCK |
| Aug 18, 2025 | A00366 | $209.7K | CRADLE LOCK REDESIGN |
| Aug 7, 2025 | P00065 | $0 | LEAD YARD SERVICES |
| Jul 29, 2025 | P00064 | $335.8K | LEAD YARD SERVICES |
| Jul 28, 2025 | P00063 | $1.5M | LEAD YARD SERVICES |
| Jun 26, 2025 | A00364 | $1.5M | ADDING FUNDS TO THE MULTI-CLASS STATIC AUTOMATIC BUS TRANSFER (MC-SABT)OBSOLESCENCE AND REDESIGN AND PERIOD OF PERFORMANCE EXTENSION. |
| Jun 25, 2025 | A00363 | $0 | DESIGN HYDRAULIC SYSTEM |
| May 29, 2025 | A00362 | $-3.0M | TECHNOLOGY INSERTION DEVELOPMENT EFFORTS |
| May 21, 2025 | A00361 | $3.0M | TECHNOLOGY INSERTION DEVELOPMENT EFFORTS |
| May 7, 2025 | A00360 | $0 | PERIOD OF PERFORMANCE EXTENSION REQUEST NO COST |
| May 5, 2025 | A00358 | $0 | CATHODIC REDESIGN |
| May 5, 2025 | A00359 | $0 | CONTROL SYSTEM REDESIGN |
| May 2, 2025 | A00357 | $750.0K | CONTROL SYSTEM REDESIGN |
| Apr 8, 2025 | A00356 | $0 | PERIOD OF PERFORMANCE EXTENSION REQUEST NO COST |
| Apr 2, 2025 | A00355 | $0 | RELEASE OF CLAIMS THROUGH DECEMBER 2023 |
| Apr 1, 2025 | A00354 | $0 | RELEASE OF CLAIMS THROUGH 30 JUNE 2023 |
| Mar 12, 2025 | A00353 | $4.3M | ADJUDICATED MODIFICATION OF ORDER 6121.006 |
| Mar 7, 2025 | A00352 | $0 | PERIOD OF PERFORMANCE EXTENSION |
| Feb 14, 2025 | A00351 | $0 | ADMINISTRATIVE MODIFICATION |
| Feb 13, 2025 | A00349 | $0 | ORDER 6016 PERIOD OF PERFORMANCE EXTENSION |
| Feb 13, 2025 | A00350 | $750.0K | FUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION |
| Feb 4, 2025 | A00348 | $0 | LEAD YARD SERVICES - EXTEND THE PERIOD OF PERFORMANCE |
| Jan 30, 2025 | A00347 | $0 | EXTENSION THE PERIOD OF PERFORMANCE |
| Dec 13, 2024 | A00346 | $500.0K | CONTROL SYSTEM REDESIGN. |
| Nov 26, 2024 | A00344 | $0 | LEAD YARD SERVICES PERIOD OF PERFORMANCE EXTENSION |
| Nov 26, 2024 | A00345 | $0 | PERIOD PERFORMANCE EXTENSION |
| Nov 20, 2024 | A00343 | $750.0K | ORDER 6121 FUNDING INCREASE - CONTROLS SYSTEM REDESIGN |
| Oct 11, 2024 | A00342 | $326.7K | ELECTRONIC GROUNDING UNIT (EGU) REDESIGN DUE TO OBSOLESCENCE |
| Aug 29, 2024 | A00341 | $500.0K | ORDER 6141 FUNDING INCREASE |
| Aug 1, 2024 | A00340 | $750.0K | ORDER 6121 FUNDING INCREASE - CONTROLS SYSTEM REDESIGN |
| Jun 20, 2024 | A00339 | $0 | PERIOD OF PERFORMANCE EXTENSION FOR THIS ORDER |
| Jun 3, 2024 | A00338 | $750.0K | ORDER 6121 FUNDING INCREASE |
| May 28, 2024 | A00337 | $0 | LEAD YARD SERVICES. EXTEND THE PERIOD OF PERFORMANCE |
| May 23, 2024 | A00336 | $450.0K | ORDER 6141 FUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION |
| May 16, 2024 | A00335 | $0 | EXTENSION OF PERIOD OF PERFORMANCE |
| Apr 24, 2024 | A00334 | $0 | ORDER 6143 PERIOD OF PERFORMANCE EXTENSION |
| Apr 11, 2024 | A00333 | $0 | ORDER 6141 PERIOD OF PERFORMANCE EXTENSION |
| Mar 19, 2024 | A00332 | $1.2M | FUNDING INCREASE FOR THE REDESIGN OF THE CONTROL SYSTEM |
| Mar 7, 2024 | A00331 | $0 | ORDER 6122 PERIOD OF PERFORMANCE EXTENSION |
| Feb 13, 2024 | A00330 | $-198.7K | ORDER 6137 DE-OBLIGATION OF FUNDS |
| Jan 18, 2024 | A00328 | $820.0K | ORDER 6121 FUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION |
| Jan 18, 2024 | A00329 | $900.0K | CONTROL SYSTEM REDESIGN. |
| Jan 12, 2024 | A00327 | $0 | ORDER 6108.001 PERIOD OF PERFORMANCE EXTENSION |
| Dec 19, 2023 | A00325 | $0 | ORDER 6112 PERIOD OF PERFORMANCE EXTENSION |
| Dec 19, 2023 | A00326 | $0 | RELEASE OF CLAIMS THROUGH DECEMBER 2022 |
| Dec 13, 2023 | A00324 | $0 | ORDER 6122 PERIOD OF PERFORMANCE EXTENSION |
| Dec 12, 2023 | A00323 | $0 | ORDER 6119 PERIOD OF PERFORMANCE EXTENSION |
| Dec 11, 2023 | A00322 | $0 | RELEASE OF CLAIMS MOD |
| Nov 22, 2023 | A00321 | $0 | PERIOD OF PERFORMANCE EXTENSION FOR MAIN PROPULSION MACHINERY CONTROL SYSTEMS |
| Nov 17, 2023 | A00319 | $0 | ORDER 6136 PERIOD OF PERFORMANCE EXTENSION |
| Nov 17, 2023 | A00320 | $1.8M | ORDER 6121 FUNDING INCREASE |
| Oct 6, 2023 | P00062 | $3.0M | LEAD YARD SERVICES |
| Oct 3, 2023 | A00318 | $0 | ORDER 6016 PERIOD OF PERFORMANCE EXTENSION |
| Sep 20, 2023 | A00317 | $81.8K | FUNDING INCREASE FOR VENTILATION VALVE FOR VIRGINIA PAYLOAD MODULE |
| Sep 13, 2023 | A00314 | $0 | ORDER 6117 PERIOD OF PERFORMANCE EXTENSION |
| Sep 13, 2023 | A00315 | $0 | EXTEND THE PERIOD OF PERFORMANCE FOR THE REDESIGN OF THE CRADLE LOCK ELECTROMECHANICAL POWER CONDITIONER AND CONTROLLER |
| Sep 13, 2023 | A00316 | $0 | ORDER 6118 PERIOD OF PERFORMANCE EXTENSION. |
| Sep 8, 2023 | A00313 | $0 | EXTEND THE PERIOD OF PERFORMANCE FOR DIESEL GENERATOR |
| Sep 6, 2023 | A00310 | $750.0K | INCREASE FUNDING AND EXTEND THE PERIOD OF PERFORMANCE |
| Sep 6, 2023 | A00311 | $-39.1K | ORDER 6139 DE-OBLIGATION OF FUNDS |
| Sep 6, 2023 | A00312 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT PAGE 2 ON MODIFICATION AZ0031. |
| Aug 11, 2023 | A00308 | $758.0K | ORDER 6121 FUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION |
| Aug 11, 2023 | A00309 | $268.1K | CONTROL SYSTEM REDESIGN. |
| Aug 10, 2023 | A00307 | $0 | ORDER 6143 PERIOD OF PERFORMANCE EXTENSION |
| Jul 20, 2023 | A00306 | $0 | PERIODIC RELEASE OF CLAIMS |
| May 30, 2023 | A00305 | $0 | EXTENDING THE PERIOD OF PERFORMANCE FOR THIS CHANGE |
| May 19, 2023 | A00304 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT AN ERROR ON PAGE 2. |
| May 11, 2023 | A00303 | $1.3M | ORDER 6141 FUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION |
| May 10, 2023 | A00302 | $1.0M | ORDER 6121 FUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION |
| May 10, 2023 | P00061 | $417.5K | LEAD YARD SUPPORT |
| Mar 29, 2023 | A00301 | $676.3K | CONTROL SYSTEM REDESIGN. |
| Mar 28, 2023 | AZ0033 | $2.5M | ORDER 6135 FULLY PRICED SUPPLEMENTAL AGREEMENT: MULTI-CLASS AUTOMATIC BUS TRANSFER OBSOLESCENCE AND REDESIGN |
| Mar 24, 2023 | AZ0032 | $583.3K | ADJUDICATING MOD AND PERIOD OF PERFORMANCE EXTENSION. |
| Mar 9, 2023 | A00300 | $1.0M | ORDER 6121 - COST INCREASE AND PERIOD OF PERFORMANCE EXTENSION |
| Feb 10, 2023 | A00299 | $0 | NO COST PERIOD OF PERFORMANCE EXTENSION |
| Jan 19, 2023 | A00297 | $1.3M | FUNDING INCREASE AND PERIOD OF PERFORMANCE EXTENSION |
| Jan 19, 2023 | A00298 | $0 | EXTENSION OF THE PERIOD OF PERFORMANCE FOR THIS CONTRACT CHANGE. |
| Dec 19, 2022 | A00296 | $0 | LEAD YARD SERVICES PERIOD OF PERFORMANCE EXTENSION |
| Nov 22, 2022 | A00295 | $1.0M | ORDER 6121 - COST INCREASE & PERIOD OF PERFORMANCE EXTENSION |
| Nov 7, 2022 | A00294 | $1.6M | ORDER 6141 - COST INCREASE & PERIOD OF PERFORMANCE EXTENSION |
| Sep 23, 2022 | A00293 | $0 | JUNE 2021 RELEASE OF CLAIMS |
| Sep 12, 2022 | A00291 | $895.6K | LEAD YARD SERVICES MPM CONTROLS REDESIGN PHASE III |
| Sep 12, 2022 | A00292 | $535.3K | FUNDING ONLY ACTION |
| Sep 2, 2022 | A00290 | $-125.1K | ORDER 6006 - FUNDING DE-OBLIGATION |
| Aug 26, 2022 | A00288 | $1.1M | LEAD YARD SERVICES MPM CONTROL SYSTEM REDESIGN PHASE III |
| Aug 26, 2022 | A00289 | $800.0K | LEAD YARD SERVICES MAIN PROPULSION MACHINERY (MPM) CONTROL REDESIGN SYSTEM PHASE II |
| Aug 3, 2022 | A00287 | $-358.4K | LEAD YARD SERVICES - LOAD CENTER SWITCHBOARD |
| Jul 27, 2022 | A00285 | $0 | ORDER 6016 - POP EXTENSION |
| Jul 27, 2022 | A00286 | $0 | ORDER 6112 PERIOD OF PERFORMANCE EXTENSION |
| Jul 26, 2022 | A00284 | $0 | PERIOD OF PERFORMANCE EXTENTION |
| Jul 13, 2022 | A00283 | $1.5M | LEAD YARD SERVICES - MPM CONTROLS REDESIGN PHASE III |
| Jun 30, 2022 | A00282 | $600.0K | ORDER 6121 - FUNDING INCREASE |
| Jun 16, 2022 | A00281 | $328.4K | ORDER 6141 - FUNDING INCREASE |
| Jun 7, 2022 | A00280 | $773.4K | FUNDING TO 75% OF THE PROPOSED AMOUNT |
| Jun 2, 2022 | A00278 | $0 | JUN 2020 RELEASE OF CLAIMS |
| Jun 2, 2022 | A00279 | $0 | PERIODIC RELEASE OF CLAIMS N00024-16-C-2111 DECEMBER 2021 |
| May 19, 2022 | A00277 | $0 | 8101 ADMIN MOD |
| May 16, 2022 | A00276 | $36.0K | ORDER 6119 PERIOD OF PERFORMANCE EXTENSION WITH FUNDING |
| May 13, 2022 | A00275 | $621.5K | PERIOD OF PERFORMANCE EXTENSION & FUNDING FOR 6121 |
| Apr 27, 2022 | A00274 | $778.4K | BEARING REPLACEMENT. |
| Apr 6, 2022 | A00273 | $723.4K | ORDER 6141 COST GROWTH FUNDING MODIFICATION |
| Apr 1, 2022 | A00271 | $-400.0K | MOD TO PROVIDE ADDITIONAL COST GROWTH FUNDING TO ENSURE CONTINUED PERFORMANCE AND TO EXTEND THE PERIOD OF PERFORMANCE |
| Apr 1, 2022 | A00272 | $0 | ORDER 6141 PERIOD OF PERFORMANCE EXTENSION |
| Mar 21, 2022 | A00270 | $0 | ORDER 6112 - POP EXTENSION |
| Mar 17, 2022 | A00269 | $0 | INCREASE OF THE LEVEL OF EFFORT HOURS |
| Mar 16, 2022 | A00268 | $0 | ORDER 8103.004 INCREASE LOE |
| Mar 2, 2022 | A00267 | $740.0K | ADDITIONAL FUNDING BECAUSE OF COST GROWTH |
| Feb 25, 2022 | A00265 | $386.0K | LEAD YARD SERVICES, STERN AREA SYSTEM (SAS)- INCREASE IN LEVEL OF EFFORT |
| Feb 25, 2022 | A00266 | $0 | INCREASE OF THE LEVEL OF EFFORT HOURS |
| Jan 25, 2022 | A00263 | $-750.0K | CLIN 8101 ORDER 8101.002 - DE-OBLIGATION |
| Jan 25, 2022 | A00264 | $801.6K | COST GROWTH FUNDING FOR CLIN 6121 |
| Jan 20, 2022 | A00262 | $0 | CLIN 6129 PERIOD OF PERFORMANCE EXTENSION |
| Jan 18, 2022 | A00260 | $0 | POP EXTENSION |
| Jan 18, 2022 | A00261 | $0 | POP EXTENSION CLIN 6112 |
| Jan 13, 2022 | A00259 | $0 | GOVERNMENT PROPERTY TRANSFER |
| Jan 11, 2022 | A00258 | $0 | POP EXTENSION CLIN 6118 |
| Jan 4, 2022 | A00257 | $0 | UPDATED SUBCONTRACT PLAN |
| Dec 23, 2021 | A00256 | $0 | ADMIN MODIFICATION TO CORRECT PREVIOUSLY RELEASED MODIFICATION A00253, EXECUTED 21 DEC 2021 |
| Dec 22, 2021 | A00254 | $1.0M | COST GROWTH 6141 |
| Dec 22, 2021 | A00255 | $0 | EXTEND PERIOD OF PERFORMANCE ON CLIN 6125 |
| Dec 21, 2021 | A00253 | $1.5M | POINT CHANGE 6108.001 - ELECTRONIC GROUNDING UNIT (EGU) OBSOLESCENCE |
| Dec 10, 2021 | A00252 | $0 | CLINS 8000, 8101, 8102, 8103 POP EXTENSIONS |
| Dec 7, 2021 | AZ0031 | $1.1M | ORDER 6143 FPSA DC MOTOR CONTROLLER |
| Nov 19, 2021 | A00251 | $1.5M | CLIN 6141 COST GROWTH |
| Nov 9, 2021 | A00250 | $0 | ORDER 6141 POP EXTENSION |
| Nov 5, 2021 | A00249 | $0 | ORDER 6136 - POP EXTENSION |
| Oct 29, 2021 | A00248 | $800.0K | CLIN 6121 COST GROWTH AND PERIOD OF PERFORMANCE EXTENSION |
| Oct 14, 2021 | AZ0030 | $557.7K | CLIN 6122 POINT CHANGE 6122.001 CRADLE LOCK REDESIGN ADJUDICATING MOD |
| Oct 12, 2021 | A00247 | $75.4K | CLIN 6107 FUNDING ONLY |
| Oct 4, 2021 | A00246 | $0 | CLIN 6131 POP EXTENSION |
| Sep 30, 2021 | A00243 | $1.7M | CLIN 6141 POP EXTENSION & COST GROWTH |
| Sep 30, 2021 | A00244 | $0 | ORDER 6108 POP EXTENSION |
| Sep 30, 2021 | A00245 | $517.9K | ORDER 6143 INCREASE OF LIMITATION OF GOVERNMENT LIABILITY TO 75% AND INCREASE OF PERIOD OF PERFORMANCE |
| Sep 29, 2021 | A00241 | $0 | CLIN 6125 SWAP FUNDING AND POP EXTENSION |
| Sep 29, 2021 | A00242 | $0 | CLIN 6121 POP EXTENSION |
| Sep 23, 2021 | A00240 | $1.0M | INCREASE LEVEL OF EFFORT FOR CLIN 8000 |
| Sep 17, 2021 | A00238 | $0 | CLIN 8101 ADMIN MOD CORRECTING A00233 |
| Sep 17, 2021 | A00239 | $500.0K | ADDITIONAL LEVEL OF EFFORT FOR CLIN 8101 |
| Sep 3, 2021 | A00237 | $0 | ADMIN TO CORRECT CLIN 6141 ACCOUNTING DATA |
| Aug 17, 2021 | A00236 | $0 | CLIN 6125 POP EXT. TO 30 SEPTEMBER 2021 |
| Aug 13, 2021 | A00235 | $1.6M | CLIN 6141 COST GROWTH |
| Aug 3, 2021 | A00233 | $0 | BARGE RENTAL EXTENSION CLIN 8101 |
| Aug 3, 2021 | A00234 | $1.6M | CLIN 6141 COST GROWTH |
| Jul 29, 2021 | A00232 | $0 | CLIN 6137 PERIOD OF PERFORMANCE EXTENSION |
| Jul 27, 2021 | A00231 | $3.3M | UCA FOR ORDER 6135 - MULTI CLASS AUTOMATIC BUS TRANSFER |
| Jul 15, 2021 | A00230 | $0 | TRANSFERRED GFP FROM 05-C-2103 (A00172) |
| Jul 13, 2021 | A00228 | $0 | UPDATED ACCOUNTING DATA FOR CLIN 6121 |
| Jul 13, 2021 | A00229 | $0 | ORDER 6117.001 POP EXTENSION |
| Jul 8, 2021 | A00227 | $0 | ORDER 6119 POP EXTENSION FOR LYS |
| Jul 7, 2021 | A00226 | $1.4M | COST GROWTH FUNDING AND POP EXTENSION |
| Jun 30, 2021 | A00225 | $0 | CLIN 8102 ADDITIONAL LEVEL OF EFFORT HOURS |
| Jun 29, 2021 | A00224 | $0 | ADMINISTRATIVE MODIFICATION TO IMPLEMENT NAVSEA 0400-AD-URM-010 (TAG OUT USERS MANUAL), REV 7, ACN 1/A AND ACN 2/A |
| Jun 24, 2021 | A00223 | $0 | POP EXTENSION - LEAD YARD SERVICES CLINS 8000, 8101, 8102, 8103 |
| Jun 23, 2021 | A00222 | $0 | CLIN 8101 INCREASES LEVEL OF EFFORT HOURS |
| Jun 10, 2021 | A00221 | $0 | ADMIN MOD TO CORRECT BLOCK 13 ON A00220 |
| Jun 9, 2021 | A00220 | $2.1M | FUNDING FOR COST GROWTH ON CLIN 6141 |
| Jun 8, 2021 | AZ0029 | $1.0M | ORDER 6108 - ELECTRONIC GROUNDING REDESIGN (EGU) |
| May 25, 2021 | A00219 | $2.7M | ADDITIONAL LEVEL OF EFFORT HOURS FOR CLIN 8000 |
| May 14, 2021 | A00218 | $0 | EXTEND PERIOD OF PERFORMANCE FOR CLIN 6118 |
| May 8, 2021 | A00217 | $1.4M | CLIN 6141 COST GROWTH FUNDING |
| May 3, 2021 | A00216 | $1.7M | CLIN 8000 ADDITIONAL LEVEL OF EFFORT (LOE) HOURS |
| Apr 28, 2021 | A00215 | $0 | ORDER 8101 INCREASE OF LEVEL OF EFFORT (LOE) HOURS |
| Apr 27, 2021 | A00214 | $42.9K | CLIN 6143 LOL INCREASE MOD |
| Apr 21, 2021 | A00213 | $0 | CLIN 6137 POP EXTENSION |
| Apr 19, 2021 | A00212 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT PREVIOUSLY EXECUTED MODIFICATION A00134 |
| Apr 16, 2021 | A00211 | $0 | CLIN 6125 PERIOD OF PERFORMANCE (POP) EXTENSION |
| Apr 1, 2021 | A00210 | $0 | LEAD YARD SERVICES POP EXTENSION |
| Mar 26, 2021 | A00209 | $1.4M | COST GROWTH FUNDING FOR CLIN 6141 |
| Mar 25, 2021 | P00060 | $0 | LEAD YARD SERVICES |
| Mar 18, 2021 | A00208 | $203.6K | LEAD YARD SERVICES 6117.001 ADJUDICATED MOD |
| Mar 16, 2021 | A00207 | $709.9K | INCREASE LOE FOR CLIN 8000 AND CORRECT SPS BEHIND THE SCENES. |
| Feb 26, 2021 | A00206 | $420.7K | FUNDING FOR CLIN 6121 |
| Feb 22, 2021 | A00205 | $0 | LEAD YARD SERVICES CLIN 6137 POP EXTENSION |
| Feb 11, 2021 | A00204 | $0 | EXTEND PERIOD OF PERFORMANCE FOR CLIN 6131 |
| Feb 9, 2021 | A00203 | $3.6M | LEAD YARD SERVICES FUNDING MOD |
| Jan 20, 2021 | A00201 | $0 | CLIN 8000 INCREASE OF LOE |
| Jan 20, 2021 | A00202 | $0 | ORDER 8102 LEVEL OF EFFORT (LOE) HOURS INCREASE |
| Jan 14, 2021 | A00200 | $1.8M | COST GROWTH CLIN 6141 |
| Dec 17, 2020 | A00198 | $0 | CLIN 6137 POP EXTENSION |
| Dec 17, 2020 | A00199 | $0 | RELEASE OF CLAIMS DEC 2019 |
| Dec 16, 2020 | A00197 | $0 | CLIN 6107/.001 PERIOD OF PERFORMANCE EXTENSION |
| Dec 14, 2020 | A00196 | $0 | ORDER 6122/.001 POP EXTENSIONS |
| Dec 11, 2020 | A00195 | $0 | ORDER 6113 POP EXTENSION |
| Dec 4, 2020 | AZ0028 | $40.9K | ADJUDICATE POINT CHANGE 6121.004 ON PHASE II COMMON WEAPON LAUNCH SOFTWARE UPGRADE |
| Dec 3, 2020 | A00194 | $713.1K | LEAD YARD SERVICES INCREASE FUNDING |
| Dec 1, 2020 | A00193 | $352.5K | CLIN 6016, ORDER 6016 - INCREMENTAL FUNDING |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2026-11-30 (29 days from calculation)
- +35 points
- 1 historical awards in this buyer and category group
- +0 points
- 476 recorded award transactions
- +10 points
- Latest award action: 2026-06-04
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.