Federal contract award
N0002417C2117
COLUMBIA CLASS DESIGN COMPLETION
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | SUP OF SHIPBUILDING GROTON |
| NAICS | 541330 — Engineering Services |
| PSC | 1905 — Combat Ships and Landing Vessels |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS INCENTIVE FEE |
| Obligations | $32.2B |
| Current contract value | $71.9B |
| Potential contract value / ceiling | $71.9B |
| Start date | Sep 21, 2017 |
| Current end date | Dec 31, 2031 |
| Potential end date | Dec 31, 2031 |
| Latest award activity | Jun 5, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 345 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 12, 2026 | P00175 | $114.6M | FUNDING |
| Jun 5, 2026 | A00169 | $0 | DOCUMENTING COUPONS APPROVED THUS FAR. |
| Jun 5, 2026 | A00170 | $0 | REPLACEMENT FIRE CONTROL AND SHIP ELECTRICAL INTERCONNECTIONS |
| May 29, 2026 | A00168 | $0 | CHANGE CABLE TYPE - WATERTIGHT BULKHEAD FOR INTERFACE BETWEEN CIRCUIT AND ECS. |
| May 22, 2026 | A00167 | $0 | REVIEW AND DEVELOP CIRCUIT DIAGRAMS |
| May 18, 2026 | A00165 | $0 | EXTENDING USE OF THE PURE WATER TRAILER |
| May 18, 2026 | A00166 | $0 | IMPLEMENT SIGNAL NAME UPDATES TO DISCLOSURES |
| May 8, 2026 | A00164 | $0 | IMPLEMENT CYBERSECURITY REQUIREMENTS, ASSISTING SUPPLIERS TO OBTAIN CERTIFICATION |
| Apr 28, 2026 | P00174 | $99.2M | FUNDING |
| Apr 16, 2026 | A00163 | $0 | REDESIGN AND UPGRADE FIBER OPTIC CABLE |
| Apr 13, 2026 | A00162 | $0 | DESIGN IMPACTS, WEAPONS LAUNCH CONSOLE DUE TO HARDWARE OBSOLESCENCE |
| Apr 10, 2026 | A00161 | $0 | OTTO FUEL DETECTOR REPLACEMENT REDESIGN |
| Apr 8, 2026 | A00160 | $0 | OBSOLESCENCE OF MONITORING AND CONTROL DRIVE AND KEYBOARD, VIDEO, AND MOUSE SWITCH AND DISPLAY SUB-COMPONENTS WITHIN THE HULL. |
| Apr 3, 2026 | A00157 | $0 | ANTENNA TUNING GROUP SYSTEM FROM EXTERIOR COMMUNICATIONS SYSTEM ON COLUMBIA |
| Apr 3, 2026 | A00158 | $0 | CHANGE CABLE TYPE - MISSILE COMPARTMENT BULKHEAD |
| Apr 3, 2026 | A00159 | $0 | REVISION TO GOVERNMENT FURNISHED EQUIPMENT SCHEDULE |
| Mar 31, 2026 | P00173 | $153.8M | FUNDING ACTION ONLY |
| Mar 19, 2026 | A00156 | $0 | UTILIZATION OF THE MULTI-CABLE TRANSIT (MCT DUE TO PRODUCT LINE OBSOLESCENCE, A NO-COST REPLACEMENT. |
| Mar 18, 2026 | P00172 | $845.9M | FUNDING |
| Mar 16, 2026 | P00171 | $3.2B | ADDITIONAL SCOPE CLINS 1000, 1300, 2000 |
| Mar 13, 2026 | A00155 | $0 | REPLACEMENT FIRE CONTROL SYSTEM REFRESH SUPPORT |
| Mar 13, 2026 | P00170 | $61.7M | EARNED PERFORMANCE INCENTIVE FEE |
| Mar 9, 2026 | P00169 | $0 | ADD CLARIFICATION TO CLIN 1300 STATEMENT OF WORK AND DELETE EEO CLAUSES |
| Mar 6, 2026 | A00152 | $0 | HUNTINGTON INGALLS INDUSTRIES-NEWPORT NEWS SHIPBUILDING ADDITIONAL FIXTURES |
| Mar 6, 2026 | A00153 | $0 | REPLACEMENT MISSILE CONTROL CENTER ARRANGEMENT REQUIREMENT COORDINATION DOCUMENT |
| Mar 6, 2026 | A00154 | $0 | UPDATE GOVERNMENT FURNISHED INFORMATION (GFI), CABLING INFORMATION UPDATED SIGNAL FUNCTION GFI |
| Mar 4, 2026 | A00149 | $0 | GOVERNMENT PROPERTY - WATER TRAILER TRANSFER |
| Mar 4, 2026 | A00150 | $0 | NO COST UPDATE STRATEGIC WEAPONS SYSTEM GOVERNMENT FURNISHED CABLE RUNNING SHEETS FOR CABLE JUMPERING. |
| Mar 4, 2026 | A00151 | $0 | ENGINEERING, DESIGN AND PLANNING SUPPORT OF SURFACE WEAPON TECHNICAL SUPPORT |
| Feb 13, 2026 | A00148 | $0 | LARGE APERTURE BOW COPPER CABLE CHANGE |
| Feb 11, 2026 | A00147 | $0 | REPLACEMENT MISSILE CONTROL CENTER ARRANGEMENT REQUIREMENTS COORDINATION DOCUMENT |
| Jan 29, 2026 | A00146 | $0 | INCONEL REPLACEMENT ON MULTIPLE TORPEDO TUBE SUB-SYSTEMS |
| Jan 14, 2026 | P00168 | $2.2B | FUNDING |
| Dec 19, 2025 | A00145 | $0 | RELEASE OF CLAIMS |
| Dec 17, 2025 | A00144 | $0 | ADMINISTRATIVE CHANGE TO PARAGRAPH TWO ON MODIFICATION A00141 |
| Dec 17, 2025 | P00166 | $0 | REVISE INCENTIVE MILESTONE DATES |
| Dec 17, 2025 | P00167 | $150.0M | FUNDING ACTION ONLY |
| Dec 9, 2025 | A00143 | $0 | DELIVERY OF UPDATED GOVERNMENT FURNISHED INFORMATION, TOWED COMMUNICATION BUOY ELECTRICAL AND INTERFACE DESIGN DOCUMENTS |
| Nov 26, 2025 | A00142 | $0 | WATER TRAILER REMOVAL FROM CONTRACT |
| Nov 24, 2025 | A00140 | $0 | ADD GOVERNMENT FURNISHED MISSILE CONTROL CENTER MODULE PLOTTING TABLE POWER DISTRIBUTION UNIT MOCKUP |
| Nov 24, 2025 | A00141 | $0 | GOVERNMENT FURNISHED INFORMATION UPDATE TO ELECTROSTATIC DISCHARGE MARKINGS ON COMPONENTS AND CABLE ASSEMBLIES |
| Nov 14, 2025 | A00138 | $0 | CHANGES TO EXTERNAL HULL PENETRATOR GOVERNMENT FURNISHED INFORMATION |
| Nov 14, 2025 | A00139 | $0 | IMPLEMENTATION OF KEY INFORMATION SECURITY REQUIREMENTS |
| Nov 12, 2025 | P00165 | $0 | DFARS 252.232-7998 |
| Nov 5, 2025 | A00137 | $0 | REVISE GOVERNMENT FURNISHED EQUIPMENT SCHEDULES |
| Oct 23, 2025 | A00134 | $0 | GOVERNMENT FURNISHED INFORMATION CHANGE FOR INBOARD POWER CABLES |
| Oct 23, 2025 | A00135 | $0 | OTTO FUEL DETECTOR REPLACEMENT |
| Oct 23, 2025 | A00136 | $0 | CHANGES TO ELECTRICAL HULL PENETRATOR. GOVERNIMENT FURNISHED INFORMATION. |
| Sep 26, 2025 | P00164 | $100.4M | FUNDING |
| Sep 16, 2025 | P00163 | $93.3M | FUNDING ONLY ACTION |
| Sep 12, 2025 | A00133 | $0 | GOVERNMENT PROPERTY TRANSFER OF HYDRAULIC POWER UNIT FROM PREVIOUS LEAD YARD SERVICE CONTRACT. |
| Sep 3, 2025 | A00131 | $0 | PROPOSED NOTICE OF CHANGE STRATEGIC WEAPON SYSTEM COORDINATION DOCUMENT |
| Sep 3, 2025 | A00132 | $0 | UPDATE GOVERNMENT FURNISHED INFORMATION CABLE ROUTING SHEETS |
| Sep 2, 2025 | A00130 | $0 | TEST AND APPROVE FLEX SEAL FOR APPLICATION |
| Aug 25, 2025 | P00162 | $171.3M | FUNDING ONLY ACTION |
| Aug 20, 2025 | A00128 | $0 | DRAWING UPDATES FOR GOVERNMENT FURNISHED INFORMATION AND ELECTROMAGNETIC INTERFERENCE AND ELECTROSTATIC DISCHARGE UPDATES |
| Aug 20, 2025 | A00129 | $0 | FABRICATION AND INSTALLATION OF A SMALL BOAT GATE INTO AN EXISTING WATERBORNE SECURITY BARRIER |
| Aug 15, 2025 | A00127 | $0 | HYDROGEN DETECTION SYSTEM AND HYDROGEN MIXING SYSTEM BATTERY COMPARTMENT HOT WORK |
| Aug 12, 2025 | A00126 | $0 | UPDATE TO TUBE GUIDE CAN AND DOOR GAP REQUIREMENT |
| Aug 4, 2025 | A00125 | $0 | TRANSFER WATER TRAILER |
| Jul 31, 2025 | P00161 | $0 | ADMINISTRATIVE ACTION |
| Jul 2, 2025 | A00124 | $0 | GOVERNMENT PROPERTY TRANSFER |
| Jun 18, 2025 | P00160 | $826.6M | ADDITIONAL SUPPLIER DEVELOPMENT AND CLASS LEAD YARD SUPPORT |
| Jun 10, 2025 | A00123 | $0 | GOVERNMENT PROPERTY TRANSFERS |
| May 22, 2025 | A00122 | $0 | UPDATING WEIGHTS AND MOMENTS |
| May 16, 2025 | A00121 | $0 | PORTABLE SHIP CONTROL SYSTEM UPDATES |
| May 14, 2025 | A00119 | $0 | DESIGN CHANGE BOLTED CONNECTIONS |
| May 14, 2025 | A00120 | $0 | GOVERNMENT PROPERTY TRANSFER |
| May 8, 2025 | A00117 | $0 | RELABELING OF SHIP'S CABLE SPARES AND ASSOCIATED DOCUMENTATION |
| May 8, 2025 | A00118 | $0 | UPDATING TI-20 DRAWING |
| Apr 30, 2025 | P00159 | $252.2M | CLIN 9611 SPECIAL INCENTIVES |
| Mar 14, 2025 | P00158 | $0 | REVISE CRI MILESTONE DATES |
| Mar 11, 2025 | P00157 | $1.7B | FUNDING |
| Mar 4, 2025 | A00116 | $0 | STREAMLINED CHANGES COUPONS |
| Mar 3, 2025 | A00115 | $0 | WEAPON CRADLE ROLLER LEAF SPRING FASTENERS HOLDING DESIGN LOAD REQUIREMENTS CHANGE |
| Feb 13, 2025 | A00114 | $0 | SCHEDULE UPDATES |
| Feb 6, 2025 | A00113 | $0 | RELEASE OF CLAIMS 31 DEC 23 |
| Jan 29, 2025 | A00111 | $0 | ASSET PLAN TESTING |
| Jan 29, 2025 | A00112 | $0 | IMPLEMENT ELECTROSTATIC DISCHARGE SENSITIVITY (ESDS) GOVERNMENT FURNISHED INFORMATION UPDATES |
| Jan 28, 2025 | A00110 | $0 | GOVERNMENT PROPERTY TRANSFER |
| Jan 3, 2025 | P00156 | $0 | REVISE SOW |
| Dec 19, 2024 | A00109 | $0 | SPECIFICATION CHANGE, WELD LIMITATIONS |
| Dec 19, 2024 | P00155 | $0 | ADMINISTRATIVE CORRECTION |
| Dec 13, 2024 | P00153 | $78.3M | EARNED PERFORMANCE INCENTIVE FEE |
| Dec 13, 2024 | P00154 | $199.8M | FUNDING, KEY PERSONNEL AND SOW |
| Dec 4, 2024 | P00152 | $0 | FUNDING |
| Nov 20, 2024 | P00151 | $2.6B | INCREMENTAL AND INSTALLMENT FUNDING |
| Oct 11, 2024 | A00108 | $0 | ELECTRICAL UPDATES FOR COLUMBIA TEST SUPPORT SYSTEMS |
| Oct 8, 2024 | P00150 | $61.5M | FUNDING |
| Sep 24, 2024 | P00149 | $95.7M | FUNDING |
| Sep 19, 2024 | A00107 | $0 | GOVERNMENT PROPERTY TRANSFER |
| Sep 10, 2024 | A00106 | $0 | ADDITIONAL FIXTURES |
| Sep 10, 2024 | P00148 | $0 | REVISE SOW |
| Aug 26, 2024 | P00147 | $-43.8M | INCREMENTAL & INSTALLMENT FUNDING |
| Aug 20, 2024 | A00105 | $0 | SPECIFICATION CHANGE TO HARDNESS REQUIREMENTS FOR ANCHOR CHAIN SHELL BOLSTER |
| Aug 5, 2024 | A00103 | $0 | COMBAT CONTROL SYSTEM TECHNICAL INSERTION UPDATE |
| Aug 5, 2024 | A00104 | $0 | FIBER OPTIC CABLE SYSTEM INTERFACE CONTROL DRAWING AND DESIGN CORRECTIONS |
| Jul 24, 2024 | A00102 | $0 | PORTABLE SHIP CONTROL SYSTEM CHANGE |
| Jul 2, 2024 | A00101 | $0 | LOGISTIC ESCAPE TRUNK HATCH RESCUE SEAT PROTECTOR PROCUREMENT |
| Jun 28, 2024 | P00146 | $995.5M | CLIN 1300 & 2000 XFER |
| Jun 27, 2024 | A00100 | $0 | TRANSFER OF PORTABLE ROBOT |
| Jun 7, 2024 | A00099 | $0 | COIL HOLDER FASTENER TESTING |
| May 30, 2024 | A00098 | $0 | SCHEDULE UPDATES |
| May 23, 2024 | A00097 | $0 | UPDATE REQUIREMENT FOR USE OF OTHER THAN EFFECTIVE ISSUE AND COMMERCIAL SUBSTITUTION |
| May 7, 2024 | A00095 | $0 | MODIFICATIONS TO SECURITY REQUIREMENTS OF SPECIFICATION 000006 |
| May 7, 2024 | A00096 | $0 | INCORPORATION OF FIRE CONTROL SWITCHBOARD MINIMUM CURRENT REQUIREMENTS |
| May 3, 2024 | A00094 | $0 | OBSOLESCENCE OF THERMOCOUPLE CONNECTOR ASSEMBLY |
| May 2, 2024 | A00093 | $0 | GOVERNMENT PROPERTY TRANSFER |
| May 1, 2024 | A00092 | $0 | ELECTRICAL AND STRUCTURAL UPDATE TO GOVERNMENT FURNISHED INFORMATION |
| Apr 24, 2024 | A00091 | $0 | OBSOLESCENCE OF CONNECTOR ASSEMBLY |
| Apr 17, 2024 | P00145 | $0 | REVISE SOW |
| Apr 16, 2024 | A00090 | $0 | THIN LINE TOWED ARRAY HANDLING SYSTEM (TLTAHS) ARRAY TERMINATION MODULE (ATM) DIVERSION TO SUPPORT GOVERNMENT TESTING. |
| Apr 11, 2024 | A00089 | $0 | OBSOLESCENCE OF MONITORING AND CONTROL SYSTEM SWITCH AND DISPLAY |
| Apr 10, 2024 | A00088 | $0 | CHANGES TO SPECIFICATION CHANGE PROPOSAL |
| Mar 29, 2024 | P00144 | $66.8M | FUNDING ONLY ACTION |
| Mar 7, 2024 | P00143 | $1.1B | FUNDING ONLY ACTION |
| Feb 29, 2024 | P00142 | $153.8M | FUNDING ONLY ACTION |
| Feb 9, 2024 | P00141 | $-121.1M | DEOBLIGATION, ADD AUSTAL SPECIAL REQUIREMENT, AND REVISE CLIN 1200 INSTALLMENT SCHEDULE |
| Jan 31, 2024 | A00087 | $0 | SONAR SYSTEM CABLE CHANGES |
| Jan 17, 2024 | P00140 | $456.9M | FUNDING AND ADMINISTRATIVE REVISION |
| Jan 16, 2024 | A00086 | $0 | DUAL MEDIA DISCHARGE |
| Dec 21, 2023 | A00085 | $0 | MODIFY ASHORE TELEPHONE SYSTEM |
| Dec 19, 2023 | A00084 | $0 | GOVERNMENT PROPERTY SCHEDULE UPDATES |
| Dec 13, 2023 | A00083 | $0 | SCHEDULE UPDATES |
| Dec 13, 2023 | P00139 | $141.6M | FUNDING AND EARNED PERFORMANCE INCENTIVE FEE |
| Dec 6, 2023 | P00138 | $0 | COVID IMPACT TO 52.216-10 |
| Dec 4, 2023 | P00137 | $0 | REVISE 1200 INSTALLMENT FUNDING PROFILE AND 8004 INCENTIVE MILESTONES |
| Nov 13, 2023 | A00082 | $0 | GOVERNMENT PROPERTY TRANSFER |
| Nov 9, 2023 | P00136 | $1.6B | FUNDING |
| Nov 2, 2023 | A00081 | $0 | CABLE RUNNING SHEET UPDATES |
| Oct 25, 2023 | P00135 | $6.1M | FUNDING |
| Oct 16, 2023 | A00079 | $0 | ALLOW ALTERNATIVE SHOT GEOMETRIES FOR HULL PENETRATIONS |
| Oct 16, 2023 | A00080 | $0 | COMMON POWER AND ELECTRONIC (CPEC) POWER CONVERSION MODULE (PCM) STOWAGE UPDATES, GOVERNMENT FURNISHED INFORMATION (GFI) CABLING RUNNING SHEET (CRS), AND ELECTROSTATIC DISCHARGE SENSITIVITY DESIGNATION (ESDS) UPDATES |
| Oct 13, 2023 | A00077 | $0 | MODIFY TECHNICAL PUBLICATION |
| Oct 13, 2023 | A00078 | $0 | MECHANICAL SEAL REDESIGN |
| Oct 11, 2023 | P00134 | $147.1M | FUNDING |
| Oct 4, 2023 | P00133 | $0 | REVISE SOW |
| Sep 27, 2023 | P00132 | $47.8K | FUNDING |
| Sep 26, 2023 | P00131 | $5.9M | EARNED INCENTIVE FEE, INSTALLMENT AND INCREMENTAL FUNDING |
| Aug 25, 2023 | P00130 | $22.3M | INCREMENTAL FUNDING |
| Jul 31, 2023 | A00076 | $0 | CORE CAPABILITIES GAP STUDY FOR ONBOARDING CLASS |
| Jul 27, 2023 | A00075 | $0 | SPECIFICATION CHANGE PROPOSALS |
| Jul 26, 2023 | P00129 | $0 | CLIN 2000 REALIGNMENT |
| Jul 20, 2023 | P00128 | $2.3M | EARNED PERFORMANCE INCENTIVE FEE |
| Jul 19, 2023 | A00074 | $0 | GOVERNMENT PROPERTY TRANSFER |
| Jun 28, 2023 | P00125 | $0 | REVISE 9C & 9D MILESTONE 3 DATE |
| Jun 28, 2023 | P00126 | $29.8M | EARNED CLIN 8002 PERFORMANCE INCENTIVES |
| Jun 27, 2023 | A00073 | $0 | MAINTAINABILITY DELTA TASKING |
| Jun 26, 2023 | A00072 | $0 | MAIN PROPULSION SHAFT TREATMENT |
| Jun 16, 2023 | A00071 | $0 | STRATEGIC WEAPONS SYSTEM UPDATED |
| Jun 13, 2023 | P00124 | $0 | HII IPDE AND FMR 300008 |
| Jun 8, 2023 | A00069 | $0 | PROCUREMENT OF TRANSIENT ASSET PLAN (TAP) SIMULATION/STIMULATION EQUIPMENT |
| Jun 8, 2023 | A00070 | $0 | SCHEDULE UPDATES AND ACCEPTANCE OF GOVERNMENT PROPERTY TRANSFER |
| May 31, 2023 | P00123 | $0 | EXTEND POP FOR HII IPDE EFFORT |
| May 17, 2023 | P00122 | $11.0M | LEAD SHIP CONSTRUCTION (SSBN 826) |
| May 15, 2023 | A00067 | $0 | MODIFICATION OF INBOARD ELECTRICAL CONNECTORS |
| May 15, 2023 | A00068 | $0 | MODIFY REQUIREMENTS FOR CASUALTY POWER CONNECTORS |
| Apr 20, 2023 | A00066 | $0 | GOVERNMENT PROPERTY TRANSFER |
| Apr 20, 2023 | P00121 | $15.0M | EARNED PERFORMANCE INCENTIVE FEE |
| Apr 19, 2023 | P00120 | $0 | DELETE B-2-007, REVISE SOW & ACE |
| Apr 18, 2023 | P00119 | $35.0M | LEAD SHIP CONSTRUCTION (SSBN 826) |
| Mar 14, 2023 | P00118 | $1.7B | INSTALLMENT FUNDING |
| Mar 8, 2023 | P00117 | $0 | REVISE CLIN 1100 INSTALLMENT FUNDING PROFILE |
| Feb 27, 2023 | P00116 | $893.2M | INSTALLMENT FUNDING |
| Feb 21, 2023 | A00065 | $0 | INSTALLATION OF ADDITIONAL SOUND DAMPENING AND INSULATION MATERIAL |
| Feb 16, 2023 | A00064 | $0 | WEAPONS STOWAGE AND HANDLING ELECTRONIC CONTROL SYSTEM SAFETY ASSESSMENT REPORT AND HAZARD ANALYSIS |
| Jan 23, 2023 | P00115 | $457.5M | INSTALLMENT FUNDING |
| Dec 22, 2022 | P00114 | $0 | REVISE AMP MILESTONE DATE |
| Dec 21, 2022 | P00113 | $0 | BUILD II AP/AC LLTM, MT CP LLTM, SUPPLIER DEVELOPMENT AND CAPE FUNDING |
| Dec 19, 2022 | P00112 | $46.5M | EARNED PERFORMSANCE INCENTIVE FEE, INCREMENTAL AND INSTALLMANT FUNDING |
| Dec 12, 2022 | A00063 | $0 | GOVERNMENT FURNISHED PROPERTY SCHEDULE CHANGES |
| Nov 22, 2022 | P00111 | $304.5M | INCREMENTAL FUNDING |
| Nov 16, 2022 | P00110 | $507.6M | INCREMENTAL AND INSTALLMENT FUNDING |
| Oct 24, 2022 | P00108 | $-8.5M | DE-OBLIGATION |
| Oct 24, 2022 | P00109 | $8.5M | REOB |
| Oct 11, 2022 | P00107 | $240.1M | INSTALLMENT FUNDING |
| Oct 4, 2022 | A00062 | $0 | REVISE PAYMENT OF FEE CLAUSE |
| Sep 27, 2022 | A00061 | $0 | PROVIDE CABLE |
| Sep 21, 2022 | P00106 | $22.4M | FUNDING AND EARNED PERFORMANCE INCENTIVE FEE. |
| Sep 13, 2022 | A00060 | $0 | CAS 401 ENGINEERING OVERHEAD RECOVERY |
| Sep 2, 2022 | A00058 | $0 | OFFICE SPACE |
| Sep 2, 2022 | A00059 | $0 | PORTABLE AIR MONITOR REPLACEMENT AND FIRST AID KIT DESIGN CHANGES |
| Aug 24, 2022 | P00105 | $0 | ESTABLISH CLIN 8002 PERFORMANCE INCENTIVES |
| Aug 8, 2022 | P00104 | $43.9M | INCREMENTAL FUNDING |
| Aug 5, 2022 | A00057 | $0 | COST CONTAINMENT SIDE LOADED PADEYE ANALYSIS AND ONBOARD SPARES |
| Jul 14, 2022 | A00056 | $0 | SPECIFICATION CHANGE PROPOSAL NO COST AGREEMENT |
| Jul 1, 2022 | A00055 | $0 | GOV'T PROPERTY TRANSFER |
| May 25, 2022 | P00103 | $641.2M | EARNED PERFORMANCE INCENTIVE FEE, INSTALLMENT & INCREMENTAL FUNDING |
| May 18, 2022 | A00054 | $0 | COST CONTAINMENT ITEM |
| May 18, 2022 | P00102 | $0 | ADDITIONAL SCOPE FY22 SUP DEV, 4050 UK MFG |
| May 16, 2022 | A00053 | $0 | INVOKE SHIP SPECIFICATION CHANGES |
| May 9, 2022 | A00052 | $0 | SHIP SPECIFICATION CHANGES |
| Apr 4, 2022 | A00051 | $0 | NO COST RESOLUTION TO SPECIFICATION CHANGE PROPOSALS 0141 AND 0148 |
| Apr 1, 2022 | A00050 | $0 | GOVERNMENT FURNISHED PROPERTY SCHEDULE CHANGES |
| Mar 30, 2022 | P00101 | $472.6M | FUNDING |
| Mar 29, 2022 | P00100 | $0 | REVISE PERFORMANCE INCENTIVES |
| Mar 28, 2022 | A00049 | $0 | LIMITATION OF COST |
| Mar 9, 2022 | A00048 | $0 | MOUNTING BOX PROCEDURE CHANGE SSBN 826/827 |
| Mar 8, 2022 | P00099 | $142.9M | FUNDING |
| Mar 2, 2022 | P00098 | $393.4M | FUNDING |
Estimated positioning window
Dec 31, 2030 – Jun 30, 2031
35/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 35/100. Available recorded signals: 30 points.
- Contract end 2031-12-31 (1886 days from calculation)
- +5 points
- 1 historical awards in this buyer and category group
- +0 points
- 345 recorded award transactions
- +10 points
- Latest award action: 2026-06-05
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.