Federal contract award
N0002417C6311
IGF::OT::IGF GUN MISSION MODULES (GMM)
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | NAVSEA HQ |
| NAICS | 334511 — Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing |
| PSC | 2330 — Trailers |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $506.8M |
| Current contract value | $601.1M |
| Potential contract value / ceiling | $1.6B |
| Start date | Mar 16, 2017 |
| Current end date | Apr 30, 2027 |
| Potential end date | Apr 30, 2027 |
| Latest award activity | May 14, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 160 of 160 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 14, 2026 | P00151 | $11.1M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Apr 9, 2026 | A00006 | $-359.2K | GUN MISSION MODULES (GMM). DE-OB MOD. |
| Mar 26, 2026 | P00150 | $7.0M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Mar 12, 2026 | P00149 | $0 | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Mar 10, 2026 | P00148 | $4.0M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Feb 26, 2026 | P00147 | $0 | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jan 16, 2026 | P00146 | $0 | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Dec 23, 2025 | P00145 | $2.9M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Nov 21, 2025 | P00144 | $4.5M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Sep 30, 2025 | P00143 | $8.4M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Aug 27, 2025 | P00142 | $5.1M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jul 31, 2025 | P00141 | $7.4M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jul 2, 2025 | P00140 | $1.6M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jun 17, 2025 | P00139 | $-109.8K | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jun 11, 2025 | A00005 | $-951.2K | SUPPLY CONTRACTS AND PRICED ORDERS |
| May 28, 2025 | P00138 | $2.7M | ENGINEERING CHANGE PROPOSAL SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| May 5, 2025 | P00137 | $6.4M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| May 1, 2025 | P00136 | $-4.6M | REDUCED WEIGHT BASIC OUTFITTING ASSEMBLY ECPS |
| Apr 11, 2025 | P00134 | $2.7M | SURFACE WARFARE SPARES |
| Apr 11, 2025 | P00135 | $3.0M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Mar 26, 2025 | P00133 | $1.8M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Mar 13, 2025 | P00132 | $6.5M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jan 23, 2025 | P00131 | $6.8M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jan 4, 2025 | P00130 | $2.1M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Dec 12, 2024 | P00129 | $1.3M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Oct 18, 2024 | P00128 | $14.0M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Sep 30, 2024 | P00127 | $3.0M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Sep 18, 2024 | P00126 | $3.7M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Sep 4, 2024 | P00125 | $6.8M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jul 22, 2024 | P00124 | $3.7M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jun 28, 2024 | P00123 | $1.5M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jun 14, 2024 | P00122 | $166.1K | ENGINEERING PROPOSAL 195 |
| May 16, 2024 | A00004 | $-731.8K | GUN MISSION MODULES (GMM) |
| May 9, 2024 | P00121 | $10.0M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Apr 4, 2024 | P00120 | $6.3M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Mar 28, 2024 | P00119 | $352.3K | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Mar 15, 2024 | P00118 | $2.7M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Feb 22, 2024 | P00117 | $0 | UPDATE ADMINISTRATIVE OFFICE |
| Feb 1, 2024 | P00116 | $4.5M | ENGINEERING AND SUSTAINMENT SUPPORT |
| Jan 19, 2024 | P00115 | $5.7M | PROCURE COMMON SUPPORT CONTAINER (CSC) KITS INCREMENTAL FUNDING |
| Dec 8, 2023 | P00114 | $-7.8M | SURFACE-TO-SURFACE MISSILE MODULE |
| Nov 16, 2023 | P00113 | $378.0K | ENGINEERING/SUSTAINMENT SUPPORT |
| Oct 6, 2023 | P00112 | $0 | SURFACE-TO-SURFACE MISSILE MODULE |
| Sep 30, 2023 | P00111 | $244.6K | SUSTAINMENT SUPPORT |
| Sep 28, 2023 | P00110 | $727.6K | ENGINEERING AND SUSTAINMENT SUPPORT |
| Sep 26, 2023 | P00109 | $1.3M | SURFACE-TO-SURFACE MISSILE MODULE |
| Sep 8, 2023 | P00108 | $15.6M | TECHNICAL SUPPORT |
| Aug 31, 2023 | P00107 | $0 | SURFACE-TO-SURFACE MISSILE MODULE |
| Aug 30, 2023 | A00003 | $-321.1K | GUN MISSION MODULES (GMM) |
| Aug 18, 2023 | P00106 | $0 | TECHNICAL SUPPORT |
| Aug 17, 2023 | P00105 | $728.5K | TECHNICAL SUPPORT |
| Aug 2, 2023 | A00002 | $-1.5M | GUN MISSION MODULES (GMM) |
| Jul 31, 2023 | P00104 | $8.5M | SURFACE-TO-SURFACE MISSILE MODULE |
| Jun 27, 2023 | P00103 | $8.5M | SURFACE-TO-SURFACE MISSILE MODULE ECP 216, KNIFEFISH SYSTEM CONTAINER ECPS 252/255, 2 MONTH POP EXTENSION TO ENGINEERING, PRODUCTION, CONSTRUCTION SUPPORT UNDER 6501, SUSTAINMENT, FIELD ENGINEERING SUPPORT UNDER 6701, AND MATERIAL/TRAVEL UNDER 6801. |
| Jun 21, 2023 | P00102 | $1.4M | SURFACE-TO-SURFACE MISSILE MODULE SPARES |
| May 12, 2023 | P00101 | $392.5K | PRODUCTION ENGINEERING |
| May 8, 2023 | P00100 | $295.0K | ENGINEERING SERVICES |
| Apr 18, 2023 | P00099 | $287.5K | SURFACE-TO-SURFACE MISSILE MODULE |
| Mar 14, 2023 | P00098 | $12.5M | SURFACE-TO-SURFACE MISSILE MODULE |
| Feb 10, 2023 | P00097 | $2.3M | INCREMENTAL FUNDING |
| Nov 23, 2022 | P00096 | $170.0K | ENGINEERING SERVICES |
| Nov 3, 2022 | P00095 | $4.0M | ENGINEERING AND SUSTAINMENT SERVICES |
| Aug 30, 2022 | P00094 | $9.5M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FUNDING FOR CLINS 6500, 6600, 6700 AND 6800. |
| Jul 28, 2022 | P00093 | $1.1M | THE PURPOSE OF THIS MODIFICATION IS TO MODIFY SECTION B AND SECTION G TO INCREMENTALLY FUND CLINS 6500 AND 6600 FOR ENGINEERING SUPPORT. |
| Jul 26, 2022 | A00001 | $-905 | IGF GUN MISSION MODULES (GMM) |
| Jul 12, 2022 | P00092 | $658.0K | SURFACE-TO-SURFACE MISSILE MODULE |
| Jun 27, 2022 | P00091 | $1.8M | INSTALLATION SUPPORT |
| May 20, 2022 | P00090 | $12.7M | SURFACE-TO-SURFACE MISSILE MODULE |
| Apr 21, 2022 | P00089 | $2.8M | SURFACE-TO-SURFACE MISSILE MODULE |
| Mar 14, 2022 | P00087 | $3.7M | DEVELOPMENT, ENGINEERING, PRODUCTION AND SUSTAINMENT |
| Mar 14, 2022 | P00088 | $5.1M | SURFACE-TO-SURFACE MISSILE MODULE |
| Feb 10, 2022 | P00086 | $4.6M | SURFACE-TO-SURFACE MISSILE MODULE |
| Feb 4, 2022 | P00085 | $1.7M | SURFACE-TO-SURFACE MISSILE MODULE |
| Dec 17, 2021 | P00084 | $4.8M | TO PROVIDE FUNDING FOR ENGINEERING, PRODUCTION, CONSTRUCTION SUPPORT AND FUNDING FOR SUSTAINMENT, FIELD ENGINEERING SUPPORT |
| Nov 23, 2021 | P00083 | $240.6K | SURFACE-TO-SURFACE MISSILE MODULE |
| Nov 15, 2021 | P00082 | $1.7M | SURFACE-TO-SURFACE MISSILE MODULE |
| Oct 22, 2021 | P00081 | $170.0K | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Sep 28, 2021 | P00080 | $493.6K | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Aug 19, 2021 | P00079 | $12.0K | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jul 2, 2021 | P00078 | $295.0K | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jun 23, 2021 | P00077 | $150.0K | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jun 17, 2021 | P00076 | $6.9M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| May 7, 2021 | P00075 | $0 | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Apr 7, 2021 | P00074 | $959.5K | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Mar 16, 2021 | P00073 | $21.9M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Mar 12, 2021 | P00072 | $17.6M | PROCURE SHIPPING CONTAINERS AND SUPPORT EQUIPMENT |
| Feb 4, 2021 | P00071 | $174.8K | SURFACE-TO-SURFACE MISSILE MODULE |
| Jan 22, 2021 | P00070 | $1.9M | SURFACE-TO-SURFACE MISSILE MODULE |
| Jan 21, 2021 | P00069 | $0 | REDUCED WEIGHT BASIC OUTFITTING ASSEMBLY |
| Dec 11, 2020 | P00068 | $5.2M | SURFACE-TO-SURFACE MISSILE MODULE |
| Dec 9, 2020 | P00067 | $863.1K | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Nov 20, 2020 | P00066 | $11.9M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Nov 2, 2020 | P00065 | $240.2K | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Sep 24, 2020 | P00064 | $425.7K | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Sep 15, 2020 | P00063 | $8.1M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Aug 31, 2020 | P00062 | $6.4M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Aug 27, 2020 | P00061 | $0 | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jul 30, 2020 | P00060 | $9.2M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jul 15, 2020 | P00059 | $-588.9K | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jun 22, 2020 | P00058 | $199.4K | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Jun 12, 2020 | PZ0001 | $512.5K | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Apr 3, 2020 | P00057 | $23.9K | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Mar 31, 2020 | P00056 | $1.2M | SUSTAINMENT, FIELD ENGINEERING, SUPPORT |
| Mar 28, 2020 | ARZ999 | $0 | COVID-19 DIB. GUN MISSION MODULES (GMM) |
| Mar 13, 2020 | P00055 | $21.9M | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Mar 12, 2020 | P00054 | $11.5M | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Feb 24, 2020 | P00053 | $661.6K | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Jan 31, 2020 | P00052 | $700.0K | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Jan 22, 2020 | P00051 | $556.0K | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Jan 8, 2020 | P00050 | $705.9K | INCREMENTAL FUNDING FOR ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Dec 11, 2019 | P00049 | $0 | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Nov 7, 2019 | P00048 | $1.6M | INCREMENTALLY FUND CLIN 3500 |
| Oct 30, 2019 | P00047 | $-321 | DEOBLIGATE FUNDS, EXTEND PERIOD OF PERFORMANCE, REVISED MATERIAL LIST. |
| Sep 27, 2019 | P00046 | $1.4M | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Sep 23, 2019 | P00045 | $-402.2K | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Aug 30, 2019 | P00044 | $8.4M | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Jul 2, 2019 | P00043 | $843.6K | PROVIDE INCREMENTAL FUNDING FOR CLIN 3500, AND CLIN 1018 |
| Jun 9, 2019 | P00042 | $0 | EXTEND PERIOD OF PERFORMANCE AT NO COST. REVISE ATTACHMENT. |
| Jun 6, 2019 | P00041 | $0 | CORRECT LINE OF ACCOUNTING IN SECTION G. |
| May 9, 2019 | P00040 | $2.1M | PROVIDE INCREMENTAL FUNDING, REVISE STATEMENT OF WORK. |
| Apr 4, 2019 | P00039 | $280.6K | INCREMENTALLY FUND CLINS 3500 AND 3600. |
| Mar 15, 2019 | P00038 | $24.2M | EXERCISING CLINS 3500,3600,3700 AND 3800 AND EXTENDING POP FOR CLIN 1025 |
| Mar 7, 2019 | P00037 | $3.6K | ESTABLISH AND FUND SLIN 0906AD |
| Jan 21, 2019 | P00036 | $2.1M | ADD PIO SLINS, INCREMENTALLY FUND CLINS 2500 AND 2600 FOR ENGINEERING SERVICES |
| Dec 27, 2018 | P00035 | $1.9M | INCREMENTAL FUNDING FOR CLIN 2500 |
| Nov 28, 2018 | P00034 | $0 | EXTEND CLIN 1022 POP, UPDATE CLAUSES AND ATTACHMENTS |
| Nov 8, 2018 | P00033 | $1.5M | INCREMENTAL FUNDING FOR CLINS 2500 AND 2600 |
| Sep 24, 2018 | P00032 | $825.0K | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Sep 6, 2018 | P00031 | $7.4M | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Aug 13, 2018 | P00030 | $1.6M | DESIGN TRANSITION SERVICES&ODCS IN SUPPORT OF SAME; ENGINEERING, PRODUCTION,&CONSTRUCTION SUPPORT&ODCS IN SUPPORT OF SAME. |
| Jul 6, 2018 | P00029 | $2.5M | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Jun 12, 2018 | P00028 | $3.1M | PURCHASE OF GUN MISSION MODULES |
| May 24, 2018 | P00026 | $0 | ADMINISTRATIVE CHANGES |
| May 24, 2018 | P00027 | $3.1M | EXERCISE CLIN 1018 SURFACE-TO-SURFACE MISSILE DESIGN TRANSITION SERVICES |
| May 3, 2018 | P00025 | $7.7M | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Apr 16, 2018 | P00024 | $1.2M | ENGINEERING, PRODUCTION, CONSTRUCTION SUPPORT&ODCS IN SUPPORT OF SAME. |
| Apr 3, 2018 | P00023 | $2.2M | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Apr 2, 2018 | P00022 | $7.4M | GUN MISSION MODULES |
| Mar 14, 2018 | P00021 | $5.7M | ENGINEERING, PRODUCTION, CONSTR. SUPPORT |
| Feb 27, 2018 | P00020 | $361.0K | GUN MISSION MODULES (GMM) |
| Feb 16, 2018 | P00019 | $386.0K | GUN MISSION MODULES (GMM): TECHNICAL CHANGE TO STATEMENT OF WORK, EXTEND OPTION EXERCISE PERIOD, INCREMENTAL FUNDING. |
| Jan 25, 2018 | P00018 | $2.0M | GUN MISSION MODULES (GMM) |
| Jan 24, 2018 | P00017 | $0 | GUN MISSION MODULES (GMM) |
| Jan 16, 2018 | P00016 | $1.3M | GUN MISSION MODULES (GMM) |
| Dec 22, 2017 | P00015 | $500.0K | GUN MISSION MODULES (GMM) |
| Nov 14, 2017 | P00014 | $1.5M | GUN MISSION MODULES (GMM) |
| Oct 19, 2017 | P00013 | $2.8M | GUN MISSION MODULES (GMM) |
| Sep 27, 2017 | P00012 | $150.0K | IGF::OT::IGF GUN MISSION MODULES (GMM) |
| Sep 20, 2017 | P00011 | $1.2M | IGF::OT::IGF GUN MISSION MODULES (GMM) |
| Sep 14, 2017 | P00010 | $0 | IGF::OT::IGF GUN MISSION MODULES (GMM) |
| Sep 6, 2017 | P00009 | $0 | IGF::OT::IGF GUN MISSION MODULES (GMM) |
| Aug 31, 2017 | P00008 | $5.0M | IGF::OT::IGF GUN MISSION MODULES (GMM) |
| Aug 14, 2017 | P00007 | $4.3M | IGF::OT::IGF REDUCED WEIGHT BOA TDP |
| Jul 10, 2017 | P00006 | $5.2M | IGF::OT::IGF GUN MISSION MODULES (GMM) |
| Jun 16, 2017 | P00005 | $1.1M | IGF::OT::IGF, GUN MISSION MODULES (GMM) |
| May 23, 2017 | P00004 | $3.4M | IGF::OT::IGF, GUN MISSION MODULES (GMM) |
| May 5, 2017 | P00003 | $776.0K | IGF::OT::IGF MISSION MODULE SUPPORT AND SUSTAINMENT |
| Apr 19, 2017 | P00002 | $1.0M | IGF::OT::IGF GUN MISSION MODULES (GMM) |
| Apr 6, 2017 | P00001 | $138.4K | IGF::OT::IGF GUN MISSION MODULES (GMM) |
| Mar 16, 2017 | 0 | $23.0M | IGF::OT::IGF GUN MISSION MODULES (GMM) |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2027-04-30 (187 days from calculation)
- +35 points
- 1 historical awards in this buyer and category group
- +0 points
- 160 recorded award transactions
- +10 points
- Latest award action: 2026-05-14
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.