Federal contract award

N0002421C5411

LONG LEAD MATERIAL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeDCMA MISSILES
NAICS336414 — Guided Missile and Space Vehicle Manufacturing
PSC1410 — Guided Missiles
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST NO FEE
Obligations$719.4M
Current contract value$719.4M
Potential contract value / ceiling$719.4M
Start dateJan 11, 2021
Current end dateDec 31, 2026
Potential end dateDec 31, 2028
Latest award activityJun 1, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 50 of 50 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 1, 2026A00045$0GUIDED MISSILES
May 4, 2026A00044$0GUIDED MISSILES
Apr 29, 2026P00008$0UPDATE INSPECTION AND ACCEPTANCE CONTRACT LINE ITEM DESCRIPTIONS
Apr 13, 2026A00043$0GUIDED MISSILES
Mar 25, 2026A00042$0GUIDED MISSILES
Mar 2, 2026A00041$0GUIDED MISSILES
Jan 21, 2026A00040$0GUIDED MISSILES
Dec 8, 2025A00039$0GUIDED MISSILES
Nov 21, 2025A00030$0GUIDED MISSILES
Aug 18, 2025P00006$0SM-2 BLK IIIB (TAC) AUR
Mar 20, 2025A00023$0GUIDED MISSILES
Mar 20, 2025A00024$0GUIDED MISSILES
Mar 20, 2025A00025$0GUIDED MISSILES
Mar 20, 2025A00026$0GUIDED MISSILES
Mar 20, 2025A00028$0GUIDED MISSILES
Mar 20, 2025A00029$0GUIDED MISSILES
Mar 20, 2025A00031$0GUIDED MISSILES
Mar 20, 2025A00032$0GUIDED MISSILES
Mar 20, 2025A00033$0GUIDED MISSILES
Mar 20, 2025A00034$0GUIDED MISSILES
Mar 20, 2025A00035$0GUIDED MISSILES
Mar 20, 2025A00036$0GUIDED MISSILES
Mar 20, 2025A00037$0GUIDED MISSILES
Mar 20, 2025P00005$141.1MSM-2 BLK IIIB (TAC) AUR
Nov 6, 2024A00021$0GUIDED MISSILES
Nov 6, 2024A00022$0GUIDED MISSILES
Jul 8, 2024A00020$0LONG LEAD MATERIAL
Apr 23, 2024A00019$0LONG LEAD MATERIAL
Apr 9, 2024A00014$0LONG LEAD MATERIAL
Mar 12, 2024A00018$0GFP TRANSFER
Jan 24, 2024A00017$0LONG LEAD MATERIAL
Nov 8, 2023A00011$0LONG LEAD MATERIAL
Nov 8, 2023A00012$0LONG LEAD MATERIAL
Nov 8, 2023A00013$0LONG LEAD MATERIAL
Nov 8, 2023A00015$0LONG LEAD MATERIAL
Nov 8, 2023A00016$0LONG LEAD MATERIAL
Mar 28, 2023A00004$0LONG LEAD MATERIAL
Mar 28, 2023A00005$0LONG LEAD MATERIAL
Mar 28, 2023A00006$0LONG LEAD MATERIAL
Oct 3, 2022P00004$0CALIBRATION GRACE PERIOD TEXT
Jul 5, 2022A00001$0LONG LEAD MATERIAL
Jul 5, 2022A00002$0LONG LEAD MATERIAL
Jul 5, 2022A00003$0LONG LEAD MATERIAL
Jul 5, 2022A00007$0LONG LEAD MATERIAL
Jul 5, 2022A00008$0LONG LEAD MATERIAL
Jul 5, 2022A00010$0LONG LEAD MATERIAL
May 23, 2022P00003$0SM-2 BLK IIIB PBP
Dec 17, 2021P00002$574.1MTO PROCURE STANDARD MISSILE-2 (SM-2) PRODUCTION REQUIREMENTS INCLUDING ALL UP ROUNDS, INSTRUMENTATION KITS, ENGINEERING SERVICES AND SPARES AND TO DEFINITIZE THE LONG-LEAD-MATERIAL
Jun 25, 2021P00001$0LONG LEAD MATERIAL
Jan 11, 20210$4.3MLONG LEAD MATERIAL

Estimated positioning window

Dec 31, 2027 – Jun 30, 2028

Recompete signal:
60/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 60/100. Available recorded signals: 55 points.

Contract end 2028-12-31 (791 days from calculation)
+15 points
50 historical awards in this buyer and category group
+15 points
50 recorded award transactions
+10 points
Latest award action: 2026-06-01
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.