Federal contract award

N0002422C5405

GENERAL ENGINEERING SERVICES

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVSEA HQ
NAICS541330 — Engineering Services
PSC1095 — Miscellaneous Weapons
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$153.5M
Current contract value$153.5M
Potential contract value / ceiling$153.5M
Start dateJan 3, 2022
Current end dateJan 2, 2027
Potential end dateJan 2, 2027
Latest award activityMay 20, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 128 of 128 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 20, 2026P00063$35.0KPURPOSE OF P00063: 1. ESTABLISH NEW SLINS AND OBLIGATE, DE-OBLIGATE, AND REALIGN SLIN FUNDING 2. ESTABLISH INSPECTION & ACCEPTANCE CRITERIA AND POPS FOR NEW SLINS
May 20, 2026P00063$10.8MPURPOSE OF P00063: 1. ESTABLISH NEW SLINS AND OBLIGATE, DE-OBLIGATE, AND REALIGN SLIN FUNDING 2. ESTABLISH INSPECTION & ACCEPTANCE CRITERIA AND POPS FOR NEW SLINS
Apr 15, 2026P00062$0THE PURPOSE OF P00062: 1. ESTABLISH AND FUND NEW SLIN 0402AQ 2. ESTABLISH INSPECTION AND ACCEPTANCE CRITERIA FOR SLIN 0402AQ 3. ESTABLISH POP FOR NEW SLIN 0402AQ.
Apr 15, 2026P00062$3.1MTHE PURPOSE OF P00062: 1. ESTABLISH AND FUND NEW SLIN 0402AQ 2. ESTABLISH INSPECTION AND ACCEPTANCE CRITERIA FOR SLIN 0402AQ 3. ESTABLISH POP FOR NEW SLIN 0402AQ.
Mar 13, 2026P00061$2.0MTHE PURPOSE OF THIS MOD IS TO: ESTABLISH AND INCREMENTALLY FUND CLINS, REALIGN FUNDING ON CLINS, AND DE-OBLIGATE FUNDING FROM CLINS.
Mar 13, 2026P00061$2.2MTHE PURPOSE OF THIS MOD IS TO: ESTABLISH AND INCREMENTALLY FUND CLINS, REALIGN FUNDING ON CLINS, AND DE-OBLIGATE FUNDING FROM CLINS.
Feb 18, 2026P00060$0THE PURPOSE OF THIS MOD IS TO: ESTABLISH & FUND NEW SLINS UNDER CLINS 0401, 0402, 0404, AND 0405 CHANGE ALL REMAINING CLINS AND SLINS WITH DODAAC Q90793 TO CAGE CODE 15090 IN SECTION F SINCE DODAAC Q90793 HAS BEEN INACTIVE SINCE 03/20/2025.
Feb 18, 2026P00060$2.0MTHE PURPOSE OF THIS MOD IS TO: ESTABLISH & FUND NEW SLINS UNDER CLINS 0401, 0402, 0404, AND 0405 CHANGE ALL REMAINING CLINS AND SLINS WITH DODAAC Q90793 TO CAGE CODE 15090 IN SECTION F SINCE DODAAC Q90793 HAS BEEN INACTIVE SINCE 03/20/2025.
Dec 19, 2025P00059$600.0KFUNDS REALIGNMENT, CEILING REALIGNMENT, INCREMENTALLY FUND AND EXERCISE OPTION CLINS, ESTABLISH INSPECTION & ACCEPTANCE, EXTEND POP, AND UPDATE DELIVERY DODAAC.
Dec 19, 2025P00059$3.2MFUNDS REALIGNMENT, CEILING REALIGNMENT, INCREMENTALLY FUND AND EXERCISE OPTION CLINS, ESTABLISH INSPECTION & ACCEPTANCE, EXTEND POP, AND UPDATE DELIVERY DODAAC.
Sep 29, 2025P00058$0THE PURPOSE OF THIS MODIFICATION IS TO: 1. ESTABLISH AND FUND NEW SLINS UNDER CLINS 0301, 0302, 0304, AND 0305 2. OBLIGATE, REALIGN, AND/OR DE-OBLIGATE FUNDS FROM CLINS 0202, 0205, 0301, 0302, 0303, 0304, AND 0305 AND 3. UPDATE ATTACHMENT 3 - GFP.
Sep 29, 2025P00058$12.0MTHE PURPOSE OF THIS MODIFICATION IS TO: 1. ESTABLISH AND FUND NEW SLINS UNDER CLINS 0301, 0302, 0304, AND 0305 2. OBLIGATE, REALIGN, AND/OR DE-OBLIGATE FUNDS FROM CLINS 0202, 0205, 0301, 0302, 0303, 0304, AND 0305 AND 3. UPDATE ATTACHMENT 3 - GFP.
Sep 25, 2025P00057$-688.3KTHE PURPOSE OF THIS MODIFICATION IS TO: 1.) DE-OBLIGATE FMS FUNDING 2.) ESTABLISH NEW CLINS AND OBLIGATE FMS FUNDING 3.) EXTEND POP OF SLIN 0304AC AND ESTABLISH POPS FOR NEW SLINS
Sep 25, 2025P00057$0THE PURPOSE OF THIS MODIFICATION IS TO: 1.) DE-OBLIGATE FMS FUNDING 2.) ESTABLISH NEW CLINS AND OBLIGATE FMS FUNDING 3.) EXTEND POP OF SLIN 0304AC AND ESTABLISH POPS FOR NEW SLINS
Jul 25, 2025P00056$0THE PURPOSE OF THIS MODIFICATION IS TO: 1. ESTABLISH NEW SLINS AND OBLIGATE FUNDING IN SECTIONS B & G 2. ESTABLISH INSPECTION AND ACCEPTANCE CRITERIA FOR NEW SLINS IN SECTION E AND 3. ESTABLISH PERIOD OF PERFORMANCE FOR NEW SLINS IN SECTION F.
Jul 25, 2025P00056$11.4MTHE PURPOSE OF THIS MODIFICATION IS TO: 1. ESTABLISH NEW SLINS AND OBLIGATE FUNDING IN SECTIONS B & G 2. ESTABLISH INSPECTION AND ACCEPTANCE CRITERIA FOR NEW SLINS IN SECTION E AND 3. ESTABLISH PERIOD OF PERFORMANCE FOR NEW SLINS IN SECTION F.
May 28, 2025P00055$3.9MP55 PURPOSE: 1. ESTABLISH AND FUND NEW SLINS 2. ESTABLISH INSPECTION AND ACCEPTANCE CRITERIA FOR NEW SLINS 3. ESTABLISH PERIOD OF PERFORMANCES FOR NEW SLINS AND 4. UPDATE TEXT G-242-H001 TO INCLUDE DESIGNATED COR.
May 28, 2025P00055$4.4MP55 PURPOSE: 1. ESTABLISH AND FUND NEW SLINS 2. ESTABLISH INSPECTION AND ACCEPTANCE CRITERIA FOR NEW SLINS 3. ESTABLISH PERIOD OF PERFORMANCES FOR NEW SLINS AND 4. UPDATE TEXT G-242-H001 TO INCLUDE DESIGNATED COR.
Apr 17, 2025P00054$0P00054 PURPOSE: 1. REFLECT SLIN-SHARING FOR TI-102 AND TI-104 FOR SLINS 0102AC AND 0105AC 2. ESTABLISH, OBLIGATE, AND DE-OBLIGATE SLIN FUNDING 3. UPDATE CONTRACT CLAUSES PER STANDARD DEVIATIONS 2025-O0003 AND 2025-O0004.
Apr 17, 2025P00054$8.8MP00054 PURPOSE: 1. REFLECT SLIN-SHARING FOR TI-102 AND TI-104 FOR SLINS 0102AC AND 0105AC 2. ESTABLISH, OBLIGATE, AND DE-OBLIGATE SLIN FUNDING 3. UPDATE CONTRACT CLAUSES PER STANDARD DEVIATIONS 2025-O0003 AND 2025-O0004.
Mar 13, 2025P00053$0THE PURPOSE OF THIS MOD IS TO: 1. UPDATE SLIN DESCRIPTIONS TO REFLECT THE SETTLEMENT AGREEMENT OF PDAR 2022 V2 FOR FY23 2. UPDATE THE SLIN DESCRIPTION & TI FOR SLIN 0205AF 3. ESTABLISH NEW SLINS AND OBLIGATE, DE-OBLIGATE, AND REALIGN SLIN FUNDING
Mar 13, 2025P00053$8.6MPURPOSE OF THIS MODIFICATION IS TO: 1. UPDATE SLIN DESCRIPTIONS TO REFLECT THE SETTLEMENT AGREEMENT OF PDAR 2022 V2 FOR FY23 2. UPDATE THE SLIN DESCRIPTIONS AND TI FOR SLIN 0205AF 3. ESTABLISH NEW SLINS AND OBLIGATE, DE-OBLIGATE, AND REALIGN FUNDING
Jan 10, 2025P00052$0THE PURPOSE OF THIS MODIFICATION IS TO: ESTABLISH AND FUND SLIN 0305AE UPDATE NAVSEA TEXT C-245-H012 ESTABLISH INSPECTION & ACCEPTANCE CRITERIA AND POP FOR SLIN 0305AE UPDATE THE RTX POC IN NAVSEA TEXT G-242-H001
Jan 10, 2025P00052$5.0KTHE PURPOSE OF THIS MODIFICATION IS TO: ESTABLISH AND FUND SLIN 0305AE UPDATE NAVSEA TEXT C-245-H012 ESTABLISH INSPECTION & ACCEPTANCE CRITERIA AND POP FOR SLIN 0305AE UPDATE THE RTX POC IN NAVSEA TEXT G-242-H001
Dec 20, 2024P00051$795.0KP00051: DE-OBLIGATES FUNDS ON CLINS 0005, 0102, AND 0202 EXERCISES, ESTABLISHES, AND INCREMENTALLY FUNDS OPTION CLINS 0301-0305 ESTABLISHES AND EXTENDS POPS UPDATES THE LATEST OPTION EXERCISE DATE IN FAR 52.217-9 NAVSEA VAR I
Dec 20, 2024P00051$1.7MP00051: DE-OBLIGATES FUNDS ON CLINS 0005, 0102, AND 0202 EXERCISES, ESTABLISHES, AND INCREMENTALLY FUNDS OPTION CLINS 0301-0305 ESTABLISHES AND EXTENDS POPS UPDATES THE LATEST OPTION EXERCISE DATE IN FAR 52.217-9 NAVSEA VAR I
Dec 5, 2024P00050$810.0KTHE PURPOSE OF THIS MOD IS TO: 1. UPDATE THE DCMA ADMIN OFFICE 2. DECREASE CEILING ON SLINS 0202AA AND 0205AA 3. ESTABLISH & FUND NEW SLINS 4. ESTABLISH INSPECTION & ACCEPTANCE CRITERIA AND POPS FOR NEW SLINS
Dec 5, 2024P00050$0THE PURPOSE OF THIS MOD IS TO: 1. UPDATE THE DCMA ADMIN OFFICE 2. DECREASE CEILING ON SLINS 0202AA AND 0205AA 3. ESTABLISH & FUND NEW SLINS 4. ESTABLISH INSPECTION & ACCEPTANCE CRITERIA AND POPS FOR NEW SLINS
Nov 15, 2024P00049$352.5KTHE PURPOSE OF THIS MOD IS TO: 1. DECREASE CEILING ON SLIN 0205AA 2. INCREMENTALLY FUND SLIN 0205AL 3. UPDATE THE ALLOTMENT OF FUNDS 4. UPDATE POC INFO IN NAVSEA TEXT G-242-H001
Nov 15, 2024P00049$0THE PURPOSE OF THIS MOD IS TO: 1. DECREASE CEILING ON SLIN 0205AA 2. INCREMENTALLY FUND SLIN 0205AL 3. UPDATE THE ALLOTMENT OF FUNDS 4. UPDATE POC INFO IN NAVSEA TEXT G-242-H001
Oct 30, 2024P00048$0THE PURPOSE OF THIS MODIFICATION IS TO DECREASE CEILING FROM CLINS 0202AA, 0203AA, 0204AA, AND 0205AA TO CREATE AND FUND NEW SLINS.
Oct 30, 2024P00048$1.1MTHE PURPOSE OF THIS MODIFICATION IS TO DECREASE CEILING FROM CLINS 0202AA, 0203AA, 0204AA, AND 0205AA TO CREATE AND FUND NEW SLINS
Sep 20, 2024P00047$2.0KTHE PURPOSE OF THIS MOD IS TO: 1. UPDATE THE DESCRIPTION OF SLINS, 2. EXTEND THE POP ON CLINS/SLINS, 3. DE-OB/RE-ON SLIN 0202A, AND 4. INCREMENTALLY FUND CLINS 0201, 0202 , 0204, AND 0205.
Sep 20, 2024P00047$13.9MTHE PURPOSE OF THIS MOD IS TO: 1. UPDATE THE DESCRIPTION OF SLINS, 2. EXTEND THE POP ON CLINS/SLINS, 3. DE-OB/RE-ON SLIN 0202A, AND 4. INCREMENTALLY FUND CLINS 0201, 0202 , 0204, AND 0205.
Jul 26, 2024P00046$35.0KDMS PRODUCTION MATERIAL
Jul 26, 2024P00046$7.9MLPWS PRODUCT IMPROVEMENT LABOR
Jun 24, 2024P00045$295.0KDMS PRODUCTION MATERIAL
Jun 24, 2024P00045$5.3MLPWS PRODUCT IMPROVEMENT LABOR
Apr 16, 2024P00044$0DMS PRODUCTION MATERIAL
Apr 16, 2024P00044$100.0KLPWS PRODUCT IMPROVEMENT LABOR
Mar 18, 2024P00043$431.0KDMS PRODUCTION MATERIAL
Mar 18, 2024P00043$1.2MLPWS PRODUCT IMPROVEMENT LABOR
Mar 5, 2024P00042$30.0KDMS PRODUCTION MATERIAL
Mar 5, 2024P00042$0LPWS PRODUCT IMPROVEMENT LABOR
Jan 31, 2024P00041$0DMS PRODUCTION MATERIAL
Jan 31, 2024P00041$-10.0KLPWS PRODUCT IMPROVEMENT LABOR
Dec 22, 2023P00040$1.9MDMS PRODUCTION MATERIAL
Dec 22, 2023P00040$668.7KLPWS PRODUCT IMPROVEMENT LABOR
Nov 16, 2023P00039$55.0KDMS PRODUCTION MATERIAL
Nov 16, 2023P00039$2.0MLPWS PRODUCT IMPROVEMENT LABOR
Oct 31, 2023P00038$0DMS PRODUCTION MATERIAL
Oct 31, 2023P00038$125.0KLPWS PRODUCT IMPROVEMENT LABOR
Sep 27, 2023P00036$280.0KFMS LABOR AND MATERIAL
Sep 27, 2023P00036$1.1MLPWS PRODUCT IMPROVEMENT LABOR
Sep 27, 2023P00037$0DMS PRODUCTION MATERIAL
Sep 27, 2023P00037$1.8MLPWS PRODUCT IMPROVEMENT LABOR
Sep 19, 2023P00035$0DMS PRODUCTION MATERIAL
Sep 19, 2023P00035$2.4MLPWS PRODUCT IMPROVEMENT LABOR
Aug 22, 2023P00034$0DMS PRODUCTION MATERIAL
Aug 22, 2023P00034$0LPWS PRODUCT IMPROVEMENT LABOR
Aug 3, 2023P00033$0DMS PRODUCTION MATERIAL
Aug 3, 2023P00033$3.3MLPWS PRODUCT IMPROVEMENT LABOR
Jul 25, 2023P00032$1.6MDMS PRODUCTION MATERIAL
Jul 25, 2023P00032$0LPWS PRODUCT IMPROVEMENT LABOR
Jun 14, 2023P00031$45.0KDMS PRODUCTION MATERIAL
Jun 14, 2023P00031$1.5MLPWS PRODUCT IMPROVEMENT LABOR
May 18, 2023P00030$0DMS PRODUCTION MATERIAL
May 18, 2023P00030$819.4KLPWS PRODUCT IMPROVEMENT LABOR
May 4, 2023P00029$10.0KDMS PRODUCTION MATERIAL
May 4, 2023P00029$100.0KLPWS PRODUCT IMPROVEMENT LABOR
Apr 21, 2023P00028$45.0KDMS PRODUCTION MATERIAL
Apr 21, 2023P00028$0LPWS PRODUCT IMPROVEMENT LABOR
Apr 18, 2023P00027$0DMS PRODUCTION MATERIAL
Apr 18, 2023P00027$4.0MLPWS PRODUCT IMPROVEMENT LABOR
Apr 4, 2023P00026$0DMS PRODUCTION MATERIAL
Apr 4, 2023P00026$3.4MLPWS PRODUCT IMPROVEMENT LABOR
Mar 23, 2023P00025$0DMS PRODUCTION MATERIAL
Mar 23, 2023P00025$0LPWS PRODUCT IMPROVEMENT LABOR
Mar 14, 2023P00024$459.7KDMS PRODUCTION MATERIAL
Mar 14, 2023P00024$0LPWS PRODUCT IMPROVEMENT LABOR
Mar 8, 2023P00023$0DMS PRODUCTION MATERIAL
Mar 8, 2023P00023$2.9MLPWS PRODUCT IMPROVEMENT LABOR
Feb 16, 2023P00022$750.0KDMS PRODUCTION MATERIAL
Feb 16, 2023P00022$221.3KLPWS PRODUCT IMPROVEMENT LABOR
Jan 24, 2023P00021$0DMS PRODUCTION MATERIAL
Jan 24, 2023P00021$1.6MLPWS PRODUCT IMPROVEMENT LABOR
Dec 14, 2022P00020$0DMS PRODUCTION MATERIAL
Dec 14, 2022P00020$1.3MLPWS PRODUCT IMPROVEMENT LABOR
Dec 6, 2022P00018$3.0MDMS PRODUCTION MATERIAL
Dec 6, 2022P00018$300.9KLPWS PRODUCT IMPROVEMENT LABOR
Dec 6, 2022P00019$250.0KDMS PRODUCTION MATERIAL
Dec 6, 2022P00019$0LPWS PRODUCT IMPROVEMENT LABOR
Nov 10, 2022P00017$451.4KDMS PRODUCTION MATERIAL
Nov 10, 2022P00017$220.4KLPWS PRODUCT IMPROVEMENT LABOR
Oct 13, 2022P00016$0DMS PRODUCTION MATERIAL
Oct 13, 2022P00016$481.0KLPWS PRODUCT IMPROVEMENT LABOR
Oct 12, 2022P00015$445.4KDMS PRODUCTION MATERIAL
Oct 12, 2022P00015$-65.0KLPWS PRODUCT IMPROVEMENT LABOR
Sep 26, 2022P00014$0DMS PRODUCTION MATERIAL
Sep 26, 2022P00014$200.0KLPWS PRODUCT IMPROVEMENT LABOR
Sep 14, 2022P00013$25.0KDMS PRODUCTION MATERIAL
Sep 14, 2022P00013$401.2KLPWS PRODUCT IMPROVEMENT LABOR
Aug 25, 2022P00012$318.9KDMS PRODUCTION MATERIAL
Aug 25, 2022P00012$0LPWS PRODUCT IMPROVEMENT LABOR
Aug 8, 2022P00011$0DMS PRODUCTION MATERIAL
Aug 8, 2022P00011$1.5MLPWS PRODUCT IMPROVEMENT LABOR
Jul 21, 2022P00010$4.1MDMS PRODUCTION MATERIAL
Jul 21, 2022P00010$3.1MLPWS PRODUCT IMPROVEMENT LABOR
Jun 27, 2022P00009$135.2KGENERAL ENGINEERING SERVICES
Jun 27, 2022P00009$34.0KLPWS PRODUCT IMPROVEMENT LABOR
May 24, 2022P00008$0GENERAL ENGINEERING SERVICES
May 24, 2022P00008$0LPWS PRODUCT IMPROVEMENT LABOR
May 10, 2022P00007$409.3KGENERAL ENGINEERING SERVICES
May 10, 2022P00007$1.7MLPWS PRODUCT IMPROVEMENT LABOR
Apr 5, 2022P00006$0GENERAL ENGINEERING SERVICES
Apr 5, 2022P00006$97.6KCRDC SUPPORT
Mar 25, 2022P00005$0GENERAL ENGINEERING SERVICES
Mar 25, 2022P00005$1.2MCRDC SUPPORT
Mar 23, 2022P00004$813.1KGENERAL ENGINEERING SERVICES
Mar 23, 2022P00004$5.3MCRDC SUPPORT
Feb 7, 2022P00003$722.5KGENERAL ENGINEERING SERVICES
Feb 7, 2022P00003$429.0KCRDC SUPPORT
Jan 31, 2022P00002$1.3MGENERAL ENGINEERING SERVICES
Jan 31, 2022P00002$483.2KCRDC SUPPORT
Dec 23, 2021P00001$165.0KGENERAL ENGINEERING SERVICES
Dec 23, 2021P00001$1.2MCRDC SUPPORT
Dec 20, 20210$1.6MGENERAL ENGINEERING SERVICES
Dec 20, 20210$927.5KCRDC SUPPORT

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2027-01-02 (69 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
128 recorded award transactions
+10 points
Latest award action: 2026-05-20
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.