Federal contract award

N0002422C5501

FY22 DBR DA/TE

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVSEA HQ
NAICS334511 — Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSC5840 — Radar Equipment, Except Airborne
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$170.6M
Current contract value$344.7M
Potential contract value / ceiling$440.6M
Start dateSep 21, 2022
Current end dateNov 1, 2029
Potential end dateNov 1, 2029
Latest award activityMay 26, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 52 of 52 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 26, 2026P00051$12.1MDESIGN AGENT AND TECHNICAL ENGINEERING (DA/TE) IN SUPPORT, AND SUSTAIN THE DUAL BAND RADAR (DBR) SYSTEM, COMPRISED OF BOTH THE AN/SPY-3(V)1 MULTI-FUNCTION RADAR (MFR) AND THE AN/SPY-4(V)2 VOLUME SEARCH RADAR (VSR)
Apr 7, 2026P00050$0DESIGN AGENT AND TECHNICAL ENGINEERING (DA/TE) IN SUPPORT, AND SUSTAIN THE DUAL BAND RADAR (DBR) SYSTEM, COMPRISED OF BOTH THE AN/SPY-3(V)1 MULTI-FUNCTION RADAR (MFR) AND THE AN/SPY-4(V)2 VOLUME SEARCH RADAR (VSR)
Mar 27, 2026P00049$2.1MDESIGN AGENT AND TECHNICAL ENGINEERING (DA/TE) IN SUPPORT, AND SUSTAIN THE DUAL BAND RADAR (DBR) SYSTEM, COMPRISED OF BOTH THE AN/SPY-3(V)1 MULTI-FUNCTION RADAR (MFR) AND THE AN/SPY-4(V)2 VOLUME SEARCH RADAR (VSR)
Mar 24, 2026P00048$2.0MDESIGN AGENT AND TECHNICAL ENGINEERING (DA/TE) IN SUPPORT, AND SUSTAIN THE DUAL BAND RADAR (DBR) SYSTEM, COMPRISED OF BOTH THE AN/SPY-3(V)1 MULTI-FUNCTION RADAR (MFR) AND THE AN/SPY-4(V)2 VOLUME SEARCH RADAR (VSR)
Mar 5, 2026P00047$1.3MDESIGN AGENT AND TECHNICAL ENGINEERING (DA/TE) IN SUPPORT, AND SUSTAIN THE DUAL BAND RADAR (DBR) SYSTEM, COMPRISED OF BOTH THE AN/SPY-3(V)1 MULTI-FUNCTION RADAR (MFR) AND THE AN/SPY-4(V)2 VOLUME SEARCH RADAR (VSR)
Jan 30, 2026P00046$6.1MOY3 OPTION EXERCISE AND INCREMENTAL FUNDING
Jan 21, 2026P00045$0UPDATE POP
Dec 15, 2025P00044$3.4MINCREMENTAL FUNDING, POP ADJUSTMENT, AND DELIVERY ADDRESS CHANGE
Dec 12, 2025P00043$0ADMIN POP CORRECTION
Dec 4, 2025P00042$2.6MLOE INCREMENTAL FUNDING
Dec 2, 2025P00041$0FY22 DBR DA/TE PIO NTE PLACEHOLDER
Nov 19, 2025P00040$0FY22 DBR DA/TE PIO NTE PLACEHOLDER
Sep 30, 2025P00039$-26.5KFY22 DBR DA/TE PIO NTE PLACEHOLDER
Sep 29, 2025P00038$4.4MFY22 DBR DA/TE PIO NTE PLACEHOLDER
Sep 8, 2025P00037$26.9MFY24 PIO SPARES AWARD
Aug 18, 2025P00036$0UPDATE GFP ATTACHMENT
Jun 30, 2025P00035$340.8KFY22 DBR DA/TE PIO NTE PLACEHOLDER
Jun 17, 2025P00034$3.8MFY22 DBR DA/TE PIO NTE PLACEHOLDER
Jun 4, 2025P00033$5.4MFY22 DBR DA/TE PIO NTE PLACEHOLDER
Mar 18, 2025P00032$1.7MFY22 DBR DA/TE PIO NTE PLACEHOLDER
Feb 20, 2025P00031$8.8MFY22 DBR DA/TE PIO NTE PLACEHOLDER
Jan 10, 2025P00030$0FY22 DBR DA/TE PIO NTE PLACEHOLDER
Dec 13, 2024P00029$490.0KREDUCE THE CEILING OF CEILING SUBCLIN 1001AA TO FUND SUBCLIN 1001BE ESTABLISH NSP CLIN/SUBCLINS 2005, 2005AA, 2005AB AND 2005AC FOR DEPOT REPAIRS DD250 3. REVISE SECTION C TO ADD CLINS 2003 AND 2005 UNDER THE STATEMENT OF WORK (SOW).
Nov 6, 2024P00028$11.4MMOD PURPOSE: EXERCISE OPTION OY2 CLINS 2001, 2002, AND 2004 ESTABLISH & FUND SLINS UPDATE SOW PARAGRAPH 4.2 ESTABLISH INSPECTION & ACCEPTANCE, POPS, DELIVERY DATES EXTEND POPS UPDATE THE LATEST OPTION EXERCISE DATE IN THE 52.217-7 NAVSEA VAR I.
Sep 27, 2024P00027$2.2MFY22 DBR DA/TE PIO NTE PLACEHOLDER
Sep 23, 2024P00026$-59.2KFY22 DBR DA/TE PIO NTE PLACEHOLDER
Aug 23, 2024P00025$2.3M1. ESTABLISH AND FUND SLINS IN SECTION B AND G 2. INCORPORATE INSPECTION AND ACCEPTANCE CRITERIA AND POPS FOR NEW SLINS. 3. UPDATE THE ALLOTMENT OF FUNDS IN SECTION G
Aug 6, 2024P00024$3.9MPURPOSE OF P00024: 1. CORRECT THE REMAINING CEILING BALANCE ON SLIN 1003AA 2. ESTABLISH NEW SLINS & OBLIGATE FUNDING TO NEW AND EXISTING SLINS 3. ESTABLISH INSPECTION & ACCEPTANCE CRITERIA AND POPS FOR NEW SLINS 4. UPDATE THE ALLOTMENT OF FUNDS.
Jul 25, 2024P00023$1.6MFY22 DBR DA/TE PIO NTE PLACEHOLDER
Jun 28, 2024P00022$7.5MTHE PURPOSE OF P00022: 1. CORRECT THE DESCRIPTION OF SLIN 1001BA 2. ESTABLISH AND OBLIGATE FUNDING 3. ESTABLISH INSPECTION & ACCEPTANCE CRITERIA AND PERIOD OF PERFORMANCES FOR NEW SLINS 4. UPDATE THE ALLOTMENT OF FUNDS.
May 29, 2024P00021$500.0KFY22 DBR DA/TE PIO NTE PLACEHOLDER
May 20, 2024P00020$0P00020: REALIGNS ALL FUNDS FROM SLIN 1001AU TO SLIN 1001AZ IN ORDER TO CORRECT ACRN ERROR ON P00019 ESTABLISHES INSPECTION & ACCEPTANCE CRITERIA AND POP FOR SLIN 1001AZ UPDATES ATTACHMENT J-03 GFP LIST 4. UPDATE THE DCMA AND DFAS DODAAC IN SECTION G.
Apr 16, 2024P00019$7.3MFY22 DBR DA/TE PIO NTE PLACEHOLDER
Mar 29, 2024P00018$656.0KFY22 DBR DA/TE PIO NTE PLACEHOLDER
Mar 13, 2024P00017$2.7MDBR DA/TE INCREMENTAL FUNDING
Feb 7, 2024P00016$839.0KFY22 DBR DA/TE PIO NTE PLACEHOLDER
Jan 5, 2024P00015$2.5MFY22 DBR DA/TE PIO NTE PLACEHOLDER
Dec 6, 2023P00014$326.2KFY22 DBR DA/TE PIO NTE PLACEHOLDER
Nov 13, 2023P00013$1.1MTHE PURPOSE OF P00013 IS TO: 1. EXERCISE OPTION CLINS 1001, 1002, AND 1003 2. ESTABLISH NEW SLINS & OBLIGATE FUNDING 3. UPDATE NAVSEA TEXT G-232-H001 - ALLOTMENT OF FUNDS. 4. EXTEND THE LATEST OPTION EXERCISE DATE IN FAR 52.217-7 NAVSEA VAR I.
Sep 28, 2023P00012$6.0KTHE PURPOSE OF THIS MODIFICATION IS TO: 1. EXTENDED THE PERIOD OF PERFORMANCE 2. REALIGN THE CEILING IN 001AA AND 001AR
Sep 26, 2023P00011$2.1MTHE PURPOSE OF P00011: 1. REALIGN CEILING 2. ESTABLISH AND OBLIGATE FUNDING 3. EXTEND THE PERIOD OF PERFORMANCES 4. EXTEND THE LATEST OPTION EXERCISE DATE UNDER CLAUSE 52.217-7 FOR ALL OPTION CLINS
Sep 13, 2023P00010$300.0KFY22 DBR DA/TE INCREMENTAL FUNDING
Aug 15, 2023P00009$3.0MTHE PURPOSE OF P00009: 1. ESTABLISH AND FUND SLINS IN SECTIONS B AND G 2. EXTEND PERIOD OF PERFORMANCES IN SECTION F 3. UPDATE THE NAVSEA TEXT G-232-H001 ALLOTMENT OF FUNDS IN SECTION G.
Apr 25, 2023P00008$1.4MFY22 DBR DA/TE FUNDING
Mar 30, 2023P00007$11.1MFY22 DBR DA/TE LOE TRANSFER
Feb 21, 2023P00006$7.0MFY22 DBR DA/TE PIO NTE PLACEHOLDER
Feb 7, 2023P00005$4.0MFY22 DBR DA/TE PIO NTE PLACEHOLDER
Jan 9, 2023P00004$600.0KFY22 DBR DA/TE FUNDING
Dec 14, 2022P00003$0FY22 DBR DA/TE PIO NTE PLACEHOLDER
Dec 6, 2022P00002$0FY22 DBR DA/TE PIO NTE PLACEHOLDER
Nov 30, 2022P00001$500.0KFY22 DBR DA/TE PIO NTE PLACEHOLDER
Sep 21, 20220$7.2MFY22 DBR DA/TE

Estimated positioning window

Nov 1, 2028 – May 1, 2029

Recompete signal:
50/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 50/100. Available recorded signals: 45 points.

Contract end 2029-11-01 (1103 days from calculation)
+5 points
48 historical awards in this buyer and category group
+15 points
52 recorded award transactions
+10 points
Latest award action: 2026-05-26
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.