Federal contract award

N0003016C0100

FY17 LONG LEAD MATERIAL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeSTRATEGIC SYSTEMS PROGRAMS
NAICS336414 — Guided Missile and Space Vehicle Manufacturing
PSC1420 — Guided Missile Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE INCENTIVE
Obligations$720.3M
Current contract value$720.7M
Potential contract value / ceiling$802.0M
Start dateJul 14, 2016
Current end dateMay 31, 2024
Potential end dateMay 31, 2024
Latest award activityMar 28, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 140 of 140 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 28, 2025P00060$0D5 RFP MISSILE BODY/INSTRUMENTATION/* INCREASE FUNDING FPI CLINS 0001 FOR $368,850 FOR PRODUCTION QUALITY INCENTIVE TOTAL FUNDING IS $797739264.05
Mar 28, 2025P00061$0OVERRUN AND APPLICATION OF COST SHARE LINE UNDER CPIF CLIN 0010.
Nov 7, 2024A00033$0SERVICE CONTRACTS
Sep 17, 2024P00059$-1.6MD5 RFP MISSILE BODY/INSTRUMENTATION/*
May 16, 2024P00058$-15.1MD5 RFP MISSILE BODY/INSTRUMENTATION/*
Aug 8, 2023P00057$248.6KD5 RFP MISSILE BODY/INSTRUMENTATION/*
Aug 3, 2023P00056$0D5 RFP MISSILE BODY/INSTRUMENTATION/*
Jun 27, 2023P00055$496.0KD5 RFP MISSILE BODY/INSTRUMENTATION/*
Oct 19, 2022P00054$0D5 RFP MISSILE BODY/INSTRUMENTATION/*
Jul 7, 2022P00052$2.6MD5 RFP MISSILE BODY/INSTRUMENTATION/*
Jul 7, 2022P00053$-3.3MD5 RFP MISSILE BODY/INSTRUMENTATION/*
May 19, 2022P00051$-219.2KD5 RFP MISSILE BODY/INSTRUMENTATION/*
Apr 21, 2022P00050$-175.9KD5 RFP MISSILE BODY/INSTRUMENTATION/*
Dec 21, 2021A00030$0FY17 LONG LEAD MATERIAL
Dec 9, 2021P00049$-52.4KD5 RFP MISSILE BODY/INSTRUMENTATION/*
Oct 25, 2021P00048$0D5 RFP MISSILE BODY/INSTRUMENTATION/*
Sep 28, 2021P00047$428.6KD5 RFP MISSILE BODY/INSTRUMENTATION/*
Jul 20, 2021P00046$120.5KD5 RFP MISSILE BODY/INSTRUMENTATION/*
Jun 22, 2021P00045$0D5 RFP MISSILE BODY/INSTRUMENTATION/*
Apr 23, 2021A00029$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Apr 23, 2021A00031$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Apr 23, 2021A00032$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Apr 12, 2021P00044$0PDS COMPLIANCE CORRECTION MODIFICATION
Apr 12, 2021P00044$0PDS COMPLIANCE CORRECTION MODIFICATION
Oct 28, 2020P00042$2.4MPERFORMANCE INCENTIVE PAYMENT
Oct 28, 2020P00042$205.8KPERFORMANCE INCENTIVE PAYMENT
Oct 28, 2020P00043$2.4MPERFORMANCE INCENTIVE PAYMENT
Oct 28, 2020P00043$205.8KPERFORMANCE INCENTIVE PAYMENT
Sep 30, 2020P00041$0NO COST CHANGE TO EXHIBIT U.
Sep 30, 2020P00041$0NO COST CHANGE TO EXHIBIT U
Sep 16, 2020P00040$37.3KHIGHER THAN EXPECTED UNDERRUN ON CLIN 6 AND POP EXTENSION ON CLIN 16.
Sep 16, 2020P00040$9.3KHIGHER THAN EXPECTED UNDERRUN ON CLIN 6 AND POP EXTENSION ON CLIN 16
Jul 20, 2020A00028$0FY17 LONG LEAD MATERIAL
Jun 3, 2020P00039$1.1MREA UNDER CLIN 11
Jun 3, 2020P00039$0CLIN 11 REA
Apr 2, 2020A00025$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Apr 2, 2020A00027$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Mar 25, 2020P00038$-2.3MTHE PURPOSE OF THIS MODIFICATION IS TO ALLOW THE CONTRACTOR TO BILL FOR VARIOUS INCENTIVES EARNED UNDER CLINS 0001, 0010, 0011 AND 0044.
Mar 25, 2020P00038$-181.8KEXCESS FUNDS DEOBLIGATION, COST INCENTIVES, AND CORRECTIONS.
Feb 18, 2020P00037$4.8MTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ESTIMATED COST UNDER CLIN 0031 AS A RESULT OF A PROJECTED COST OVERRUN EXPERIENCED DURING CONTRACT PERFORMANCE, AND MUTUALLY AGREE TO EXTEND THE DELIVERY DATE OF CLIN 0073 FROM 31 MARCH 2020 TO 30 SEPTEMBER 2020 IN SECTION F.
Feb 18, 2020P00037$0THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ESTIMATED COST UNDER CLIN 0031 AS A RESULT OF A PROJECTED COST OVERRUN EXPERIENCED DURING CONTRACT PERFORMANCE, AND MUTUALLY AGREE TO EXTEND THE DELIVERY DATE OF CLIN 0073 FROM 31 MARCH 2020 TO 30 SEPTEMBER 2020 IN SECTION F.
Nov 27, 2019A00024$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Nov 27, 2019A00026$0ACCEPT TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Aug 6, 2019P00032$320.0KINCREMENTAL FUNDING ITEM 0073
Aug 6, 2019P00032$0INCREMENTAL FUNDING ITEM 0073
Aug 6, 2019P00033$-2.9MTHE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS DUE TO UNDERRUNS EXPERIENCED DURING CONTRACT PERFORMANCE.
Aug 6, 2019P00033$0THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDS DUE TO UNDERRUNS EXPERIENCED DURING CONTRACT PERFORMANCE. THERE WERE NO U.K. FUNDS TO DE-OB.
Aug 6, 2019P00034$0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE DELIVERY DATE UNDER CLIN 0060 FOR CDRLS A090, A091, A092 UNTIL 16 SEPTEMBER 2020.
Aug 6, 2019P00034$0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE DELIVERY DATE UNDER CLIN 0060 FOR CDRLS A090, A091, A092 UNTIL 16 SEPTEMBER 2020.
Aug 6, 2019P00035$3.4MTHE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY TERMINATE CLIN 0001 AND INCREASE FUNDING UNDER CLIN 0031 AS A RESULT OF OVERRUNS EXPERIENCED DURING CONTRACT PERFORMANCE.
Aug 6, 2019P00035$0THE PURPOSE OF THIS MODIFICATION IS TO PARTIALLY TERMINATE CLIN 0001 AND INCREASE FUNDING UNDER CLIN 0031 DUE TO OVERRUNS EXPERIENCED DURING CONTRACT PERFORMANCE. THERE WERE NO U.K. FUNDS IMPACTED.
Aug 6, 2019P00036$3.8MTHE PURPOSE OF THIS MODIFICATION IS TO ALLOW THE CONTRACTOR TO BILL FOR VARIOUS INCENTIVES EARNED UNDER CLINS 0001, 0010, 0011 AND 0044.
Aug 6, 2019P00036$317.1KTHE PURPOSE OF THIS MODIFICATION IS TO ALLOW THE CONTRACTOR TO BILL FOR VARIOUS INCENTIVES EARNED UNDER CLINS 0001, 0010, 0011 AND 0044.
Jul 23, 2019P00031$24.7KHURRICANE IRMA REA
Jul 23, 2019P00031$0HURRICANE IRMA REA
Dec 7, 2018P00030$0ADMIN
Dec 7, 2018P00030$0ADMIN
Dec 3, 2018P00029$2.0MPAY EARNED INCENTIVES
Dec 3, 2018P00029$172.5KPAY EARNED INCENTIVES
Nov 19, 2018P00028$470.0KINC. FUND CLIN 0073
Nov 19, 2018P00028$0INC. FUND CLIN 0073
Nov 14, 2018P00027$0ADMIN MOD
Nov 14, 2018P00027$0ADMIN MOD
Oct 2, 2018A00023$0TRANSFER OF ACCOUNTABILITY OF GFX
Sep 27, 2018A00022$0TRANSFER OF ACCOUNTABILITY OF GFX
Sep 26, 2018A00020$0TRANSFER OF ACCOUNTABILITY OF GFX
Sep 26, 2018A00021$0TRANSFER OF ACCOUNTABILITY OF GFX
Sep 24, 2018P00026$34.8KIGF::CT::IGF FUND VARIANCE ON 0076
Sep 24, 2018P00026$0IGF::CT::IGF FUND VARIANCE ON 0076
Jul 25, 2018P00025$240.9KIGF::CT::IGF EXERCISE AND FUND 0044
Jul 25, 2018P00025$0IGF::CT::IGF EXERCISE AND FUND 0044
Jul 12, 2018A00015$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Jul 12, 2018A00016$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Jul 12, 2018A00017$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Jul 12, 2018A00018$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Jul 12, 2018A00019$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
May 25, 2018P00024$485.0KIGF::CT::IGF INCREMENTAL FUNDING
May 25, 2018P00024$0IGF::CT::IGF INCREMENTAL FUNDING
May 23, 2018P00023$2.4MIGF::CT::IGF PERFORMANCE INCENTIVE PAYMENT
May 23, 2018P00023$205.8KIGF::CT::IGF PERFORMANCE INCENTIVE PAYMENT
May 3, 2018P00022$5.1MIGF::CT::IGF EXERCISE AND FULLY FUND 0063, INC. FUND 0073
May 3, 2018P00022$0IGF::CT::IGF NO COST MOD TO ADD SPECIAL PROVISION
Apr 27, 2018P00021$0IGF::CT::IGF NO COST MOD TO ADD SPECIAL PROVISION
Apr 27, 2018P00021$0IGF::CT::IGF NO COST MOD TO ADD SPECIAL PROVISION
Mar 26, 2018P00020$0IGF::CT::IGF ADMIN MODIFICATION TO CORRECT DELIVERY DATES
Mar 26, 2018P00020$0IGF::CT::IGF ADMIN MODIFICATION TO CORRECT DELIVERY DATES
Feb 28, 2018A00012$0TRANSFER OF GOVERNMENT PROPERTY
Feb 28, 2018A00013$0TRANSFER OF GOVERNMENT PROPERTY
Feb 28, 2018A00014$0GOVERNMENT PROPERTY TRANSFER
Feb 1, 2018P00019$0IGF::CT::IGF ADMIN MODIFICATION TO REPLACE ATTACHMENT 42
Feb 1, 2018P00019$0IGF::CT::IGF ADMIN MODIFICATION TO REPLACE ATTACHMENT 42
Jan 19, 2018A00008$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY.
Jan 19, 2018A00009$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Jan 19, 2018A00010$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Jan 19, 2018A00011$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Jan 3, 2018A00007$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Oct 27, 2017A00005$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Oct 27, 2017A00006$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY
Sep 28, 2017P00018$365.0KIGF::CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND ITEM 0004 OF THE CONTRACT. THIS MODIFICATION RESULTS IN A $365,000 OBLIGATION UNDER ITEM 0004.
Sep 28, 2017P00018$0IGF::CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND ITEM 0004 OF THE CONTRACT. THIS MODIFICATION RESULTS IN A $365,000 OBLIGATION UNDER ITEM 0004.
Sep 7, 2017P00017$0IGF::CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR UNDER MOD. NO. P00015 WHERE THE ITEM 0014 AND 0041 OPTIONS WERE EXERCISED AND FULLY FUNDED BUT THE SECTION A AND B OF THE CONTRACT WERE NOT UPDATED TO REFLECT THE INCREASE IN CONTRACT VALUE AND THE EXERCISED OPTIONS. THIS MODIFICATION RESULTS IN NO CHANGE IN THE OBLIGATED AMOUNTS UNDER THE CONTRACT.
Sep 7, 2017P00017$0IGF::CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR UNDER MOD. NO. P00015 WHERE THE ITEM 0014 AND 0041 OPTIONS WERE EXERCISED AND FULLY FUNDED BUT THE SECTION A AND B OF THE CONTRACT WERE NOT UPDATED TO REFLECT THE INCREASE IN CONTRACT VALUE AND THE EXERCISED OPTIONS. THIS MODIFICATION RESULTS IN NO CHANGE IN THE OBLIGATED AMOUNTS UNDER THE CONTRACT. PROVIDE FOR THE NEW PROCUREMENT OF ITEM 0060, INFORMATION SYSTEMS PLANNING AND REFRESH, ITEM 0061, PROPULSION VIABILITY, ITEM 0062, SYSTEM SUPPORT COMPLETION/SUPPORT EQUIPMENT, AND OPTION ITEM 0063, PROPULSION VIABILITY. OPTION ITEM 0063 IS NOT EXERCISED UNDER THIS MODIFICATION. THIS MODIFICATION RESULTS IN: THE ESTABLISHMENT OF COST-PLUS-FIXED-FEE ITEM 0060 WITH AN ESTIMATED COST OF $2,938,368 AND FIXED FEE OF $223,006, COST-PLUS-FIXED FEE ITEM 0061 WITH AN ESTIMATED COST OF $2,363,798 AND FIXED FEE OF $176,370, COST-PLUS-FIXED-FEE ITEM 0062 WITH AN ESTIMATED COST OF $9,862,121 AND FIXED FEE OF $733,865, AND COST-PLUS-FIXED-FEE ITEM 0063 WITH AN ESTIMATED COST OF $4,638,379 AND FIXED FEE OF $352,017.
Sep 6, 2017P00016$16.3MIGF::CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO: PROVIDE FOR THE NEW PROCUREMENT OF ITEM 0060, INFORMATION SYSTEMS PLANNING AND REFRESH, ITEM 0061, PROPULSION VIABILITY, ITEM 0062, SYSTEM SUPPORT COMPLETION/SUPPORT EQUIPMENT, AND OPTION ITEM 0063, PROPULSION VIABILITY. OPTION ITEM 0063 IS NOT EXERCISED UNDER THIS MODIFICATION. THIS MODIFICATION RESULTS IN: THE ESTABLISHMENT OF COST-PLUS-FIXED-FEE ITEM 0060 WITH AN ESTIMATED COST OF $2,938,368 AND FIXED FEE OF $223,006, COST-PLUS-FIXED FEE ITEM 0061 WITH AN ESTIMATED COST OF $2,363,798 AND FIXED FEE OF $176,370, COST-PLUS-FIXED-FEE ITEM 0062 WITH AN ESTIMATED COST OF $9,862,121 AND FIXED FEE OF $733,865, AND COST-PLUS-FIXED-FEE ITEM 0063 WITH AN ESTIMATED COST OF $4,638,379 AND FIXED FEE OF $352,017.
Sep 6, 2017P00016$0IGF::CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO: PROVIDE FOR THE NEW PROCUREMENT OF ITEM 0060, INFORMATION SYSTEMS PLANNING AND REFRESH, ITEM 0061, PROPULSION VIABILITY, ITEM 0062, SYSTEM SUPPORT COMPLETION/SUPPORT EQUIPMENT, AND OPTION ITEM 0063, PROPULSION VIABILITY. OPTION ITEM 0063 IS NOT EXERCISED UNDER THIS MODIFICATION. THIS MODIFICATION RESULTS IN: THE ESTABLISHMENT OF COST-PLUS-FIXED-FEE ITEM 0060 WITH AN ESTIMATED COST OF $2,938,368 AND FIXED FEE OF $223,006, COST-PLUS-FIXED FEE ITEM 0061 WITH AN ESTIMATED COST OF $2,363,798 AND FIXED FEE OF $176,370, COST-PLUS-FIXED-FEE ITEM 0062 WITH AN ESTIMATED COST OF $9,862,121 AND FIXED FEE OF $733,865, AND COST-PLUS-FIXED-FEE ITEM 0063 WITH AN ESTIMATED COST OF $4,638,379 AND FIXED FEE OF $352,017.
Jul 22, 2017P00015$8.8MIGF::CT::IGF THE PURPOSES OF THIS MORTIFICATION ARE TO: (1)REDUCE THE ESTIMATED COST, FIXED FEE, AND COST-PLUS FIXED FEE; UPDATE THE STATEMENT OF WORK; AND REDUCE THE PERIOD OF PERFORMANCE UNDER OPTION CLIN 0014 IN ACCORDANCE WITH SPECIAL PROVISION C-4 ENTITLED "OPTION CLINS"; (2) REDUCE THE ESTIMATED COST, FIXED FEE, COST-PLUS FIXED FEE, AND UPDATE THE ATTACHMENT 44 DELIVERABLE ITEMS UNDER OPTION CLIN 0041 IN ACCORDANCE WITH SPECIAL PROVISION C-4 ENTITLED "OPTION CLINS"; AND (3) EXERCISE AND FULLY FUND ITEMS 0014 AND 0041 IN ACCORDANCE WITH SPECIAL PROVISION C-4 ENTITLED "OPTION CLINS".
Jul 22, 2017P00015$0IGF::CT::IGF THE PURPOSES OF THIS MORTIFICATION ARE TO: (1)REDUCE THE ESTIMATED COST, FIXED FEE, AND COST-PLUS FIXED FEE; UPDATE THE STATEMENT OF WORK; AND REDUCE THE PERIOD OF PERFORMANCE UNDER OPTION CLIN 0014 IN ACCORDANCE WITH SPECIAL PROVISION C-4 ENTITLED "OPTION CLINS"; (2) REDUCE THE ESTIMATED COST, FIXED FEE, COST-PLUS FIXED FEE, AND UPDATE THE ATTACHMENT 44 DELIVERABLE ITEMS UNDER OPTION CLIN 0041 IN ACCORDANCE WITH SPECIAL PROVISION C-4 ENTITLED "OPTION CLINS"; AND (3) EXERCISE AND FULLY FUND ITEMS 0014 AND 0041 IN ACCORDANCE WITH SPECIAL PROVISION C-4 ENTITLED "OPTION CLINS".
Jul 21, 2017P00014$17.0MIGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Jul 21, 2017P00014$0IGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Jun 29, 2017P00013$0IGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Jun 29, 2017P00013$0IGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
May 30, 2017P00012$14.9MIGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
May 30, 2017P00012$0IGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Apr 26, 2017P00011$1.9MIGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Apr 26, 2017P00011$0IGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Mar 31, 2017P00010$0IGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Mar 31, 2017P00010$0IGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Mar 22, 2017A00004$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY TO THIS CONTRACT.
Mar 15, 2017P00009$15.0MIGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Mar 15, 2017P00009$0IGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Mar 9, 2017A00002$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY TO THIS CONTRACT.
Mar 9, 2017A00003$0TRANSFER OF ACCOUNTABILITY OF GOVERNMENT PROPERTY TO THIS CONTRACT.
Mar 1, 2017A00001$0TRANSFER ACCOUNTABILITY OF GOVERNMENT PROPERTY TO THIS CONTRACT.
Feb 15, 2017P00008$490.1MIGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Feb 15, 2017P00008$50.7MIGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Jan 20, 2017P00007$0IGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Jan 20, 2017P00007$0IGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Dec 27, 2016P00006$8.8MIGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Dec 27, 2016P00006$0IGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Dec 22, 2016P00005$0IGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Dec 22, 2016P00005$0IGF::CT::IGF TRIDENT II (D5) MISSILE PRODUCTION AND DEPLOYED SYSTEM SUPPORT.
Dec 20, 2016P00004$10.8MIGF::CT::IGF TRIDENT II (D5) MISSILE DEPLOYED SYSTEM SUPPORT.
Dec 20, 2016P00004$488.0KIGF::CT::IGF TRIDENT II (D5) DEPLOYED SYSTEM SUPPORT.
Nov 30, 2016P00003$0IGF::CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE OPTION EXERCISE DATES SET FORTH IN SPECIAL PROVISION C-4 FOR UNDER ITEMS 0012 AND 0041. THIS MODIFICATION RESULTS IN NO CHANGES TO CONTRACT AMOUNTS.
Nov 30, 2016P00003$0IGF::CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE OPTION EXERCISE DATES SET FORTH IN SPECIAL PROVISION C-4 FOR UNDER ITEMS 0012 AND 0041. THIS MODIFICATION RESULTS IN NO CHANGES TO CONTRACT AMOUNTS.
Nov 17, 2016P00002$65.4MIGF::CT::IGF THE PURPOSES OF THIS MODIFICATION ARE TO (1) EXERCISE AND FULLY FUND OPTION ITEMS 0006, 0011, 0016, AND 0031 AND (2) INCREMENTALLY FUND ITEM 0004, 0038, AND 0040.
Nov 17, 2016P00002$248.0KIGF::CT::IGF THE PURPOSES OF THIS MODIFICATION ARE TO (1) EXERCISE AND FULLY FUND OPTION ITEMS 0006, 0011, 0016, AND 0031 AND (2) INCREMENTALLY FUND ITEM 0004, 0038, AND 0040.
Sep 30, 2016PZ0001$41.7MFY17 P&DSS
Sep 30, 2016PZ0001$2.2MFY17 P&DSS
Jul 14, 20160$21.8MFY17 LONG LEAD MATERIAL
Jul 14, 20160$0FY17 LONG LEAD MATERIAL

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.