Federal contract award

N0003925F3001

THE OBJECTIVE OF THIS T.O. IS TO PROVIDE INSTALLATION REQUIREMENT DRAWINGS (IRDS), WIRING DIAGRAMS, TECHNICAL DATA PACKAGES (TDPS), SHIP CHECKS, AND SHIP INSTALLATION DRAWINGS (SIDS) DEVELOPMENT AND DESIGN MANAGEMENT / DRAWING DEVELOPMENT SUPPORT.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVAL INFORMATION WARFARE SYSTEMS
NAICS541330 — Engineering Services
PSCR425 — Engineering and Technical Services
Parent award / vehicleN0017819D7983
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$8.7M
Current contract value$11.8M
Potential contract value / ceiling$34.3M
Start dateDec 4, 2024
Current end dateDec 3, 2026
Potential end dateJun 3, 2030
Latest award activityMay 29, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 14 of 14 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 29, 2026P00013$2.0MPEO C4I DESIGN DEVELOPMENT SUPPORT SERVICES
Mar 19, 2026P00012$1.5MPEO C4I DESIGN DEVELOPMENT SUPPORT SERVICES
Jan 29, 2026P00011$0PROVIDE INSTALLATION REQUIREMENT DRAWINGS (IRDS), WIRING DIAGRAMS, TECHNICAL DATA PACKAGES (TDPS), SHIP CHECKS, AND SHIP INSTALLATION DRAWINGS (SIDS) DEVELOPMENT AND DESIGN MANAGEMENT / DRAWING DEVELOPMENT SUPPORT FOR PEO C4I, NAVWAR.
Jan 26, 2026P00010$518.4KPROVIDE INSTALLATION REQUIREMENT DRAWINGS (IRDS), WIRING DIAGRAMS, TECHNICAL DATA PACKAGES (TDPS), SHIP CHECKS, AND SHIP INSTALLATION DRAWINGS (SIDS) DEVELOPMENT AND DESIGN MANAGEMENT / DRAWING DEVELOPMENT SUPPORT FOR PEO C4I, NAVWAR.
Dec 18, 2025P00009$662.9KTHIS TO PROVIDES INSTALLATION REQUIREMENT DRAWINGS (IRDS), WIRING DIAGRAMS, TECHNICAL DATA PACKAGES (TDPS), SHIP CHECKS, AND SHIP INSTALLATION DRAWINGS (SIDS) DEVELOPMENT AND DESIGN MANAGEMENT / DRAWING DEVELOPMENT SUPPORT FOR PEO C4I, NAVWAR.
Nov 25, 2025P00008$229.1KPROVIDE INSTALLATION REQUIREMENT DRAWINGS (IRDS), WIRING DIAGRAMS, TECHNICAL DATA PACKAGES (TDPS), SHIP CHECKS, AND SHIP INSTALLATION DRAWINGS (SIDS) DEVELOPMENT AND DESIGN MANAGEMENT / DRAWING DEVELOPMENT SUPPORT FOR PEO C4I, NAVWAR.
Nov 19, 2025P00007$-190.7KPROVIDE INSTALLATION REQUIREMENT DRAWINGS (IRDS), WIRING DIAGRAMS, TECHNICAL DATA PACKAGES (TDPS), SHIP CHECKS, AND SHIP INSTALLATION DRAWINGS (SIDS) DEVELOPMENT AND DESIGN MANAGEMENT / DRAWING DEVELOPMENT SUPPORT FOR PEO C4I, NAVWAR.
Sep 25, 2025P00006$264.1KPROVIDE INSTALLATION REQUIREMENT DRAWINGS (IRDS), WIRING DIAGRAMS, TECHNICAL DATA PACKAGES (TDPS), SHIP CHECKS, AND SHIP INSTALLATION DRAWINGS (SIDS) DEVELOPMENT AND DESIGN MANAGEMENT / DRAWING DEVELOPMENT SUPPORT FOR PEO C4I, NAVWAR.
Jul 22, 2025P00005$167.4KPROVIDE INSTALLATION REQUIREMENT DRAWINGS (IRDS), WIRING DIAGRAMS, TECHNICAL DATA PACKAGES (TDPS), SHIP CHECKS, AND SHIP INSTALLATION DRAWINGS (SIDS) DEVELOPMENT AND DESIGN MANAGEMENT / DRAWING DEVELOPMENT SUPPORT FOR PEO C4I, NAVWAR.
Jul 3, 2025P00004$1.3MTHE OBJECTIVE OF THIS TO PROVIDES FOR INSTALLATION REQUIREMENT DRAWINGS (IRDS), WIRING DIAGRAMS, TECHNICAL DATA PACKAGES (TDPS), SHIP CHECKS, SHIP INSTALLATION DRAWINGS (SIDS) DEVELOPMENT AND DESIGN MANAGEMENT SUPPORT FOR PEO C4I, NAVWAR.
Apr 14, 2025P00003$152.6KPROVIDE INSTALLATION REQUIREMENT DRAWINGS (IRDS), WIRING DIAGRAMS, TECHNICAL DATA PACKAGES (TDPS), SHIP CHECKS, AND SHIP INSTALLATION DRAWINGS (SIDS) DEVELOPMENT AND DESIGN MANAGEMENT / DRAWING DEVELOPMENT SUPPORT FOR PEO C4I, NAVWAR.
Mar 20, 2025P00002$0PROVIDE INSTALLATION REQUIREMENT DRAWINGS (IRDS), WIRING DIAGRAMS, TECHNICAL DATA PACKAGES (TDPS), SHIP CHECKS, AND SHIP INSTALLATION DRAWINGS (SIDS) DEVELOPMENT AND DESIGN MANAGEMENT / DRAWING DEVELOPMENT SUPPORT FOR PEO C4I.
Jan 30, 2025P00001$350.0KPROVIDE INSTALLATION REQUIREMENT DRAWINGS (IRDS), WIRING DIAGRAMS, TECHNICAL DATA PACKAGES (TDPS), SHIP CHECKS, AND SHIP INSTALLATION DRAWINGS (SIDS) DEVELOPMENT AND DESIGN MANAGEMENT / DRAWING DEVELOPMENT SUPPORT FOR PEO C4I, NAVWAR.
Dec 4, 20240$1.5MTHE OBJECTIVE OF THIS T.O. IS TO PROVIDE INSTALLATION REQUIREMENT DRAWINGS (IRDS), WIRING DIAGRAMS, TECHNICAL DATA PACKAGES (TDPS), SHIP CHECKS, AND SHIP INSTALLATION DRAWINGS (SIDS) DEVELOPMENT AND DESIGN MANAGEMENT / DRAWING DEVELOPMENT SUPPORT.

Estimated positioning window

Jun 3, 2029 – Dec 3, 2029

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2030-06-03 (1317 days from calculation)
+5 points
55 historical awards in this buyer and category group
+15 points
14 recorded award transactions
+10 points
Latest award action: 2026-05-29
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.