Federal contract award
N0016725C0001
MEDIUM VOLTAGE ELECTRICAL TESTING IS REQUIRED TO ENSURE THE 2.4KV BLDG 4E INTERIOR SUBSTATION 4A AND ALL ASSOCIATED FEEDER EQUIPMENT IS SAFE TO ENERGIZE AND TO PROVIDE TEST RESULTS SUFFICIENT TO ALLOW SUBSTATION 4A TO BE ENERGIZED FROM UTILITY POWER.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | NSWC CARDEROCK |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1HB — CONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | 8(A) SOLE SOURCE |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $254.6K |
| Current contract value | $254.6K |
| Potential contract value / ceiling | $254.6K |
| Start date | May 23, 2025 |
| Current end date | Sep 19, 2025 |
| Potential end date | Sep 19, 2025 |
| Latest award activity | Sep 18, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 18, 2025 | P00003 | $162.2K | ADD REVISION #3 TO THE STATEMENT OF WORK TO ACCOMPLISH MAIN SUBSTATION TRANSFORMER OIL FILTRATION AND EXTEND THE PERIOD OF PERFORMANCE TO 19 SEPTEMBER 2025. |
| Aug 8, 2025 | P00002 | $29.5K | 1. ADD REVISION #2 TO THE STATEMENT OF WORK. 2. EXTEND THE PERIOD OF PERFORMANCE FROM 11 JUN 2025 TO 10 AUGUST 2025 TO REPAIR HMS 9 AND HMS 15 AND RETEST.3. REPLACE DAMAGED BARRIER BOARDS ON TRANSFORMER 38. |
| Jun 4, 2025 | P00001 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO: 1. ADD A REVISED STATEMENT OF WORK, 2. REMOVE FAR 52.236-1 DUE TO INAPPLICABILITY. MEDIUM VOLTAGE ELECTRICAL TESTING. |
| May 23, 2025 | 0 | $62.8K | MEDIUM VOLTAGE ELECTRICAL TESTING IS REQUIRED TO ENSURE THE 2.4KV BLDG 4E INTERIOR SUBSTATION 4A AND ALL ASSOCIATED FEEDER EQUIPMENT IS SAFE TO ENERGIZE AND TO PROVIDE TEST RESULTS SUFFICIENT TO ALLOW SUBSTATION 4A TO BE ENERGIZED FROM UTILITY POWER. |