Federal contract award

N0024425PS208

REPLACEMENT PARTS FOR THE DEGRADED UNINTERRUPTIBLE POWER SUPPLY SYSTEM (UPS) NO. EJ085BAA02 AND EJ085BAA03 IN ACCORDANCE WITH VENDOR QUOTE 3898 ATTACHED IN SECTION J AND THE STATEMENT OF REQUIREMENTS (SOR) IN SECTION C OF THE CONTRACT HEREIN

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVSUP FLT LOG CTR PEARL HARBOR
NAICS334112 — Computer Storage Device Manufacturing
PSC7B20 — Hardware, software, and other equipment needed for specialized High Performance Computing (HPC) systems used in solving complex computational problems through massive concurrent use of computing resources and parallel processing techniques.
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$344.5K
Current contract value$344.5K
Potential contract value / ceiling$344.5K
Start dateSep 29, 2025
Current end dateDec 31, 2025
Potential end dateDec 31, 2025
Latest award activityNov 21, 2025
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Nov 21, 2025P00002$14.8KREPLACEMENT PARTS FOR THE DEGRADED UNINTERRUPTIBLE POWER SUPPLY SYSTEM (UPS) NO. EJ085BAA02 AND EJ085BAA03 IN ACCORDANCE WITH VENDOR QUOTE 3898 ATTACHED IN SECTION J AND THE STATEMENT OF REQUIREMENTS (SOR) IN SECTION C OF THE CONTRACT HEREIN
Nov 3, 2025P00001$0REPLACEMENT PARTS FOR THE DEGRADED UNINTERRUPTIBLE POWER SUPPLY SYSTEM (UPS) NO. EJ085BAA02 AND EJ085BAA03 IN ACCORDANCE WITH VENDOR QUOTE 3898 ATTACHED IN SECTION J AND THE STATEMENT OF REQUIREMENTS (SOR) IN SECTION C OF THE CONTRACT HEREIN
Sep 29, 20250$329.8KREPLACEMENT PARTS FOR THE DEGRADED UNINTERRUPTIBLE POWER SUPPLY SYSTEM (UPS) NO. EJ085BAA02 AND EJ085BAA03 IN ACCORDANCE WITH VENDOR QUOTE 3898 ATTACHED IN SECTION J AND THE STATEMENT OF REQUIREMENTS (SOR) IN SECTION C OF THE CONTRACT HEREIN

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.