Federal contract award
N3943025F0193
FEASIBILITY ANALYSIS FOR DRILLING TWO 400-FT GROUND SOURCE HEAT PUMP (GSHP) WELLS AT DOD INSTALLATIONS IN WASHINGTON, INCLUDING BUILDINGS 7700 BANGOR AND 2029 EVERETT, AS OUTLINED IN THE PWS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | NAVFAC SYSTEMS AND EXP WARFARE CTR |
| NAICS | 541330 — Engineering Services |
| PSC | C219 — Other Architect and Engineering Services |
| Parent award / vehicle | N3943023D4051 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $241.7K |
| Current contract value | $241.7K |
| Potential contract value / ceiling | $241.7K |
| Start date | Sep 18, 2025 |
| Current end date | Apr 30, 2026 |
| Potential end date | Apr 30, 2026 |
| Latest award activity | Dec 8, 2025 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Dec 8, 2025 | P00002 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE CLIN POP DELIVERY DATE FROM 02 JANUARY 2026 TO 30 APRIL 2026. |
| Nov 25, 2025 | P00001 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE (POP) FROM 02 JANUARY 2026 TO 30 APRIL 2026. |
| Sep 18, 2025 | 0 | $241.7K | FEASIBILITY ANALYSIS FOR DRILLING TWO 400-FT GROUND SOURCE HEAT PUMP (GSHP) WELLS AT DOD INSTALLATIONS IN WASHINGTON, INCLUDING BUILDINGS 7700 BANGOR AND 2029 EVERETT, AS OUTLINED IN THE PWS. |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.