Federal contract award

N4008022C0001

REPAIR MACDONOUGH HALL BUILDING 102, USNA, ANNAPOLIS, MD

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM WASHINGTON
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2CZ — REPAIR OR ALTERATION OF OTHER EDUCATIONAL BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$56.8M
Current contract value$56.8M
Potential contract value / ceiling$56.8M
Start dateNov 12, 2021
Current end dateOct 1, 2026
Potential end dateOct 1, 2026
Latest award activityJun 1, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 25 of 25 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 1, 2026P00024$0N4008022C0001 / P00024 / PC-166 PERMISSIVE ACCESS
Jan 5, 2026P00023$9.4KN4008022C0001 / P00023 / PC-154 INSTALL BUNGI PIT SYSTEM STEEL ANGLES
Nov 5, 2025P00022$0N4008022C0001 PC110/CR246 - DELETE PRIMER ON ROOF (CREDIT FY23), PC 157/CR 308 - GUTTER LINER AT COLONNADE, REF. RFI 503 (FY23)
Nov 3, 2025P00021$771.0KN4008022C0001 P00021 MULTIPLE PROPOSED CHANGES (PCS 130, 137, 138, 145, 146, 147, 150, 153, 156, 161, 163, 164)
Sep 5, 2025P00020$0N4008022C0001 P00020 MULTIPLE PROPOSED CHANGES (PCS 143, 151, 155, 158, 162)
Aug 25, 2025P00019$26.1KN4008022C0001 P00019 PC-159 REPLACE 3RD FLOOR ATHLETIC EQUIPMENT ANCHORS
Jan 29, 2025P00018$994.3KN4008022C0001 MACDONOUGH HALL RENOVATION, USNA P00018 MULTIPLE PROPOSED CHANGES (51, 71, 101, 102, 103, 104, 107, 108, 109, 111, 112, 113, 114, 115, 116, 117, 118, 119, 120, 121, 122, 123, 124, 125, 126, 127, 128)
Sep 19, 2024P00017$0N4008022C0001 P00017 MULTIPLE PCS (85, 87, 95, 96, 98, 99, 100, 105, 106)
Aug 21, 2024P00016$65.6KP00016 PC-093 ADDITIONAL GROUNDING
Jul 24, 2024P00015$0P00015 MULTIPLE PCS (73, 86, 91, 92, 94, 97)
Apr 18, 2024P00014$0N4008022C0001 P00014 MULTIPLE PCS (72, 81, 82, 83, 89, 90)
Feb 23, 2024P00013$0N4008022C0001 MACDONOUGH HALL RENOVATION, USNA P00013 MULTIPLE PCS (44, 49, 68, 70, 75, 76, 77, 78, 80, 84)
Oct 12, 2023P00012$0P00012 MULTIPLE PCS (57,63,65,69,74,79)
Sep 14, 2023P00011$2.7MP00011 UPOB-PCS39/40 STREET AND SCOTT MECHANICAL WORK
Sep 7, 2023P00010$5.6MP00010 ROOF REPAIR SCOPE MODIFICATION - ADDITIONAL WORK
Aug 16, 2023P00009$142.1KP00009 PC064
Jun 7, 2023P00008$0MOD P00008 PC 42, 43, 46, 47, 48, 52, 53, 54, 59, 60, 61, 66
Mar 27, 2023P00007$0P00007 PC 56 ADD HELICAL PILES
Mar 15, 2023P00006$0GENERAL CONSTRUCTION
Sep 20, 2022P00005$973.1KP00005 - PCS 25,27,33,35,38,41. CCD REMAINS THE SAME
Sep 19, 2022P00004$343.4KP00004 - PCS 29, 30, 31, 34, 36
Sep 15, 2022P00003$3.8MP00003 MULTIPLE PCS 1,7, 8, 9, 10, 13, 14, 15, 16, 17, 18, 19, 21, 23, 24, 26, 28, 32, 37
Sep 6, 2022P00002$12.6KTHIS MOD INCORPORATES PCS 2,3,5,6,20. THE CCD REMAINS THE SAME.
Aug 12, 2022P00001$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE PCS 4,11,12. NO ADDITIONAL COST OR TIME
Nov 12, 20210$41.5MREPAIR MACDONOUGH HALL BUILDING 102, USNA, ANNAPOLIS, MD

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.