Federal contract award

N4008518F7202

IGF::OT::IGF X041 REPLACE CHILLERS NH100 NAVAL HOSPITAL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM MID-ATLANTIC
NAICS238220 — Plumbing, Heating, and Air-Conditioning Contractors
PSCZ2JZ — REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleN4008514D7744
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$5.6M
Current contract value$5.6M
Potential contract value / ceiling$5.6M
Start dateSep 28, 2018
Current end dateApr 8, 2021
Potential end dateApr 8, 2021
Latest award activityJul 28, 2021
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 28, 2021P00007$0TIME EXTENSION DUE TO ITEM DELAYS - REPLACE CHILLERS NH100 NAVAL HOSPITAL
Jan 25, 2021P00006$38.1KREPLACE CHILLERS NH100 NAVAL HOSPITAL
Jun 8, 2020P00005$334.3KMODIFICATION TO X041 REPLACE CHILLERS NH100 NAVAL HOSPITAL
Dec 3, 2019P00004$16.9KPROVIDE ADDITIONAL PIPE SUPPORTS.
Oct 17, 2019P00003$8.1KREDIRECT CONDENSATE LINE.
Sep 18, 2019P00002$19.0K1. REMOVE ASPHALT AS NEEDED TO EXPOSE ALL LOOSE AREAS OF SUBGRADE ESTIMATED 1100 SF. 2. EXCAVATE ALL LOOSE SUBGRADE MATERIAL FROM THE SITE ESTIMATED 1100 SF 8' DEEP. 3. VERIFY NO EXISTING DAMAGE TO THE STORMWATER PIPING, MANHOLE (MANHOLE HAS 5 PIPE PENETRATIONS) AND 8" WATER LINES. IF DAMAGES NOTED INFORM NMCCL ENGINEERING STAFF OF THE DAMAGES AND HOW TO PROCEED. 4. BACKFILL AREA AND REPAIR THE ASPHALT AS CALLED FOR IN THE DRAWINGS/SPECIFICATIONS FROM THIS CONTRACT.
Sep 11, 2019P00001$104.9KPC 02 - AT LOCATION SPECIFIED ON ATTACHED DRAWING, INSTALL 1200 AMP MANUAL TRANSFER SWITCH TO POWER THE TEMPORARY CHILLER WITH SHORE POWER OR POWER FROM THE TEMPORARY GENERATOR. - 1200 AMP MANUAL TRANSFER SWITCH WILL INCLUDE CAMLOK CONNECTIONS -CAMLOK FITTINGS TO BE FILLED WITH STRAIN RELIEF OR MOUNTED INTO THE PANEL. $99,257.00 AND 21 DAYS PC 03 1. CORRECT THE OFFSET/DEFLECTION OF THE SPRINKLER PIPING IN HALLWAY E163A. 2. MOVE CONDUIT AS REQUIRED TO STRAIGHTEN SPRINKLER PIPING. $3,808.00 AND 0 DAYS PC 04 1. EXTEND EXISTING 1" REFRIGERATION CONDENSER DISCHARGE WATER UPSTREAM OF EXISTING SHUTOFF VALVE TO TIE-IN TO NEW CONDENSER WATER RETURN. SEE ATTACHED DRAWING. $1,855.00 AND 1 DAY PC 06 TIME EXTENSION FOR EXCUSABLE DELAY. 129 DAYS
Sep 28, 20180$5.1MIGF::OT::IGF X041 REPLACE CHILLERS NH100 NAVAL HOSPITAL

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.