Federal contract award

N4008520F6501

HURRICANE FLORENCE RECOVERY MILCON PACKAGE 6, FACILITIES AT STONE BAY, CAMP LEJEUNE, NC

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM ATLANTIC
NAICS236220 — Commercial and Institutional Building Construction
PSCY1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleN4008520D0034
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$44.9M
Current contract value$44.9M
Potential contract value / ceiling$44.9M
Start dateSep 15, 2020
Current end dateMar 14, 2025
Potential end dateMar 14, 2025
Latest award activityAug 29, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 25 of 25 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 29, 2025P00024$0N408520D0034 T/O N4008520F6501 MILCON PACKAGE 6
Aug 13, 2025P00023$0N408520D0034 MACC DB/DBB LARGE PROJECTS GERNERAL CONSTRUCTION MAS T/O N4008520F6501 MILCON PACKAGE 6
May 7, 2025P00022$0P00022 - UPDATED CLAUSES IAW EOS AND CLASS DEVIATIONS
Mar 11, 2025P00021$0PC-21 P1507 UNFO ASBESTOS STEAM PIPE
Sep 11, 2024P00020$2.6KP00020 PC18 P1534 MASS NOTIFICATION
Jun 26, 2024P00019$-2.9KPC019 P1507 MODIFICATION TO MASS NOTIFICATION SYSTEM
Jun 6, 2024P00018$0P1534 BASE, OPTIONS 4-6
May 13, 2024P00017$1.4MP1534 BASE, OPTIONS 4-6
Apr 4, 2024P00016$65.1KP1534 BASE, OPTIONS 4-6
Jun 13, 2023P00015$367.7KAV
Sep 29, 2022P00014$656.4KPC013 P1507 FFE & PC014 P1534 IFC DRAWING
Sep 21, 2022P00013$34.0KPC011 P1534 RESTROOM IN LOBBY, FULL LENGTH SIDEWALK, MIRROR SIZE CHANGE
Aug 19, 2022P00012$2.6M10% INCREASE TO P1534
Aug 9, 2022P00011$0PC012 P1507 IFC DRAWINGS
Jul 26, 2022P00010$58.4KP1534 BASE, OPTIONS 4-6
Jul 14, 2022P00009$93.4KP1534 BASE, OPTIONS 4-6 EPOXY FLOORS REPLACEMENT MOD
Jun 3, 2022P00008$0P00008 - PC008 ADDITIONAL WAGE CLASSIFICATION-SPRINKLER FITTER & PC009 ADDITIONAL WAGE CLASSIFICATION-GLAZIER
May 25, 2022P00007$17.2KP00007 - PC003, P1534 BYPASS AROUND BUFFER TANK PC005, P1507 BYPASS AROUND BUFFER TANK AND INCORPORATE FAR 52.204-24
May 12, 2022P00006$48.5KPC004 - BALLISTIC WINDOWS FOR P1507
Dec 20, 2021P00005$1.0MP1534 BASE, OPTIONS 4-6 PC002 - 10% SCOPE INCREASE BUILDING P1534 - DESIGN
Jul 20, 2021P00004$368.3KP1507 BASE
Jul 1, 2021P00003$0P1534 BASE, OPTIONS 4-6
May 25, 2021P00002$0CDW TRADEOFFS
Dec 8, 2020P00001$0SIGNAGE REQUIREMENTS
Sep 15, 20200$38.2MHURRICANE FLORENCE RECOVERY MILCON PACKAGE 6, FACILITIES AT STONE BAY, CAMP LEJEUNE, NC

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.