Federal contract award
N4008521C0017
BASE BID - P1800 (BASE,OPTIONS 1-5)
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | NAVFACSYSCOM MID-ATLANTIC |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $206.4M |
| Current contract value | $206.4M |
| Potential contract value / ceiling | $212.5M |
| Start date | Dec 22, 2020 |
| Current end date | Feb 16, 2028 |
| Potential end date | Feb 16, 2028 |
| Latest award activity | May 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 74 of 74 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 4, 2026 | P00073 | $5.0M | N4008521C0017 P1800 II MEF OPERATIONS CENTER REPLACEMENT - P1801 2ND MARDIV / 2ND MLG OPERATIONS CENTER REPLACEMENT, MCB CAMP LEJEUNE, NC |
| Oct 30, 2025 | P00072 | $7.0K | N4008521C0017 P1800 II MEF OPERATIONS CENTER REPLACEMENT - P1801 2ND MARDIV / 2ND MLG OPERATIONS CENTER REPLACEMENT, MCB CAMP LEJEUNE, NC |
| Sep 29, 2025 | P00071 | $175.0K | N4008521C0017 P1800 II MEF OPERATIONS CENTER REPLACEMENT - P1801 2ND MARDIV / 2ND MLG OPERATIONS CENTER REPLACEMENT, MCB CAMP LEJEUNE, NC |
| Sep 22, 2025 | P00070 | $22.5K | N4008521C0017 P1800 II MEF OPERATIONS CENTER REPLACEMENT - P1801 2ND MARDIV / 2ND MLG OPERATIONS CENTER REPLACEMENT, MCB CAMP LEJEUNE, NC |
| Sep 3, 2025 | P00069 | $-31.6K | N4008521C0017 P1800 II MEF OPERATIONS CENTER REPLACEMENT - P1801 2ND MARDIV / 2ND MLG OPERATIONS CENTER REPLACEMENT, MCB CAMP LEJEUNE, NC |
| Aug 26, 2025 | P00068 | $11.0K | N4008521C0017 P1800 II MEF OPERATIONS CENTER REPLACEMENT - P1801 2ND MARDIV / 2ND MLG OPERATIONS CENTER REPLACEMENT, MCB CAMP LEJEUNE, NC |
| Jul 30, 2025 | P00067 | $723.3K | N4008521C0017 P1800 II MEF OPERATIONS CENTER REPLACEMENT - P1801 2ND MARDIV / 2ND MLG OPERATIONS CENTER REPLACEMENT, MCB CAMP LEJEUNE, NC |
| Jul 21, 2025 | P00066 | $3.3M | N4008521C0017 P1800 II MEF OPERATIONS CENTER REPLACEMENT - P1801 2ND MARDIV / 2ND MLG OPERATIONS CENTER REPLACEMENT, MCB CAMP LEJEUNE, NC |
| May 15, 2025 | P00065 | $11.9K | BASE BID - P1800 (BASE,OPTIONS 1-5) |
| Mar 27, 2025 | P00064 | $66.7K | P1800 II MEF - FLAGPOLE, KITCHEN EQUIPMENT, AND E STOP |
| Dec 10, 2024 | P00063 | $-141.3K | PC 98 - P1800 MEF DELETE ALL DESIGN EFFORTS FOR RF SHIELDING FOR P1800 II MEF SECOND FLOOR AREAS C & D. CREDIT PROVIDED FOR WORK NOT YET PERFORMED UNDER P00052. |
| Nov 19, 2024 | P00062 | $8.9M | FF&E P1800 II MEF |
| Aug 29, 2024 | P00061 | $10.4M | P1800 II MEF AV |
| Aug 7, 2024 | P00060 | $347.1K | P1800 II MEF - ADD TELECOM IN STO AND OCCUPANCY SENSORS |
| Jul 17, 2024 | P00059 | $796.4K | P1800 II MEF LIFT SUSPENSION AREA C&D FROM PERIOD 05-04-2023 THRU 11-16-2023 TO MINIMIZE REWORK OF RF SHIELDING. |
| May 22, 2024 | P00058 | $2.5M | P1801 MLG RF SHIELDING CONSTRUCTION - MODIFICATION TO INCORPORATE RF SHIELDING DESIGN AND PAY FOR CONSTRUCTION. |
| Apr 16, 2024 | P00057 | $0 | P1800 II MEF - INCORPORATE APPROVED CSP AND MOU. THIS CHANGE IS TO INCORPORATE THE APPROVED CONSTRUCTION SECURITY PLAN AND MEMORANDUM OF UNDERSTANDING AS DRAFTED BY II MEF SSO INTO THE CONTRACT. |
| Apr 8, 2024 | P00056 | $7.2K | ADD PDS DROP. PROVIDE ADDITIONAL PDS DROP IN A/V ROOM 223 |
| Mar 5, 2024 | P00055 | $93.4K | RFP NO. 99 MARDIV SCIF ACCREDITATION CHANGE TO INCLUDE RF SHIELDING DESIGN |
| Nov 20, 2023 | P00054 | $2.1M | BASE BID - P1800 (BASE,OPTIONS 1-5) |
| Sep 30, 2023 | P00053 | $0 | LOA CORRECTION OF P1801 REPROGRAMMED FUNDS |
| Sep 28, 2023 | P00052 | $203.0K | P1800 MEF - RF SHIELDING SCIF |
| Sep 19, 2023 | P00051 | $-8.0K | RFP#84 P-1801 MLG DELETE RETURN FILTER GRILLES (RFI#50). CREDIT |
| Sep 13, 2023 | P00050 | $19.8K | UNFORESEEN WATER LINE METAL CASING AND ASBESTOS LINE |
| Sep 7, 2023 | P00049 | $2.3M | RFP#44 MARDIV CONVERT ADDITION TO OSS & COMM CHANGES IN ADDITION. INCORPORATE THE BELOW CHANGES INTO THE CONTRACT. |
| Sep 5, 2023 | P00048 | $180.4K | P1800 RFP#91 MEF HARDSTAND ELECTRICAL DISCONNECT |
| Aug 31, 2023 | P00047 | $475.5K | P1801 - PLANNED ELECTRICAL AV MODIFICATION FOR MLG |
| Aug 24, 2023 | P00046 | $53.4K | RFP#97 MLG SCIF ACCREDITATION CHANGE TO INCLUDE RF SHIELDING |
| Jul 27, 2023 | P00045 | $125.3K | P1801 MARDIV SAVE THE TREES |
| Jun 8, 2023 | P00044 | $0 | ADD IFCS TO P1800 MEF |
| May 8, 2023 | P00043 | $88.6K | RFP#35 MARDIV G-2 FLOOR PLAN CHANGES (ENLARGED SCIF) |
| Apr 18, 2023 | P00042 | $0 | INCORPORATE THE MLG 100% FINAL DESIGNS DP-1 IFC DATED 5/11/22 DP-2 IFC DATED 12/6/22 |
| Mar 30, 2023 | P00041 | $5.2M | EXERCISE OPTION FOR BLDG 2 RENOVATION (CLIN 0009) |
| Mar 2, 2023 | P00040 | $82.5K | PC 81 - RFP#94 MLG CLAY CORE FOR SEDIMENT BASIN FURNISH AND INSTALL A CLAY CORE TO THE BASIN #2 EMBANKMENT. |
| Feb 24, 2023 | P00039 | $47.4K | RFP#93 MLG TRANSITE (ASBESTOS) STORM DRAIN LINE ABATE AND DISPOSE OF THE 36 INCH TRANSITE (ASBESTOS) STORM DRAIN LINE AT FUTURE MANHOLES E1 AND F1 AS NECESSARY TO INSTALL THE NEW STORM DRAIN MANHOLES. |
| Feb 6, 2023 | P00038 | $15.9K | RFP#96 MARDIV CAD ENGINEERING SUPPORT PROVIDE CIVIL ENGINEERING SUPPORT IN PERSON DURING THE 100% PRE-FINAL DESIGN REVIEW MEETING. |
| Feb 1, 2023 | P00037 | $60.0K | RFP#66 MARDIV SAVE THE TREES DESIGN PERFORM AN 8 HOUR DESIGN WORKSHOP WITH THE CIVIL DOR IN PERSON AND ON BASE FOR THE SITE CIVIL PACKAGE STARTING WITH THE ATTACHED CONCEPT DRAWING. |
| Jan 30, 2023 | P00036 | $9.1K | RFP#76 MEF CONTROL ROOM DOOR FURNISH AND INSTALL A STC 35 DOOR AND HARDWARE BETWEEN THE II MEF AUDITORIUM AND THE TECHNICIAN CONTROL ROOM INCLUDING ALL THE ADDED ESS AND IDS INFRASTRUCTURE. |
| Jan 5, 2023 | P00035 | $-19.1K | PC 58 - P1800 DELETE THE REQUIREMENT FOR AUTOMATIC AND HARD WIRED SOAP DISPENSERS, FOR HAIR DRYERS, THE SHELF REQUIREMENT AT THE ABA COMPLIANT MIRROR, AND THE STANDALONE PAPER TOWEL DISPENSERS. |
| Dec 21, 2022 | P00034 | $48.6K | P1800 - RFP#71 CHECKPOINT OFFICES ON THE FIRST FLOOR NEEDS A COUNTER WITH DRAWERS UNDERNEATH A SERVICE WINDOW FOR DISPENSING BADGES. RFP#74 MEF AUDITORIUM PDS DROPS. RFP#62 MEF SECURITY PLAN |
| Dec 14, 2022 | P00033 | $-7.9K | RFP#56 THE MOTORIZED SHADES ARE NO LONGER REQUIRED DUE TO THE UNLIKELIHOOD OF MAINTENANCE ON THESE TYPE OF WINDOW SHADES. |
| Dec 1, 2022 | P00032 | $4.3K | P1081-RFP#60 ADD DEADBOLTS AT DOORS. RFP#61 MLG CONSTRUCTION SECURITY PLAN INCORPORATE THE ATTACHED MLG CONSTRUCTION SECURITY PLAN AND MEMORANDUM INTO THE MLG PROJECT. |
| Nov 17, 2022 | P00031 | $22.2K | BASE BID - P1800 (BASE,OPTIONS 1-5) |
| Oct 18, 2022 | P00030 | $106.1K | P-1801 MARDIV, RFP#27 FLIR RADAR. PROVIDE CONTINUOUS POWER AND COMMUNICATION SERVICES TO THE FLIR RADAR/CAMERA SYSTEM FOR THE DURATION OF CONSTRUCTION OF THIS PROJECT. |
| Oct 4, 2022 | P00029 | $1.7K | P1800-RFP#75 MEF HOSE BIBBS FOR LWTC FURNISH AND INSTALL TWO HOSE BIBB LOCATIONS TO SUPPORT THE CLEANING OF THE LWTC AND AUDITORIUM SPACES. RFP#77 MEF DUTY HUT SPEAK-THROUGH HOLE |
| Sep 27, 2022 | P00028 | $46.7K | RFP#27 P-1801 MARDIV FLIR RADAR |
| Sep 6, 2022 | P00027 | $-6.8K | P-1801 MLG, DELETE THE REQUIREMENT FOR INTERIOR FIXED BALLISTIC LEVEL 3 STC RATED PARTITIONS AND REPLACE WITH STC 45 RATED WALLS AND DOOR IN THE DUTY HUT. |
| Aug 29, 2022 | P00026 | $-221.5K | P1800 DEDUCT MOD. |
| Aug 24, 2022 | P00025 | $5.6K | P1801 MLG CONTRACTOR IS TO FURNISH AND INSTALL THE FOOD SERVICE EQUIPMENT PER E109002. FOOD SERVICE EQUIPMENT IS TO BE LIGHT COMMERCIAL GRADE. UPGRADE THE BUILT-IN COFFEE BAR |
| Aug 18, 2022 | P00024 | $355.2K | P-1800 PER RFI#46 DELETE THE HARD PARTITION WALLS TO CEILING ADDED IN OPEN OFFICE 15.231 AND REPLACE WITH DEMOUNTABLE SYSTEM AND DOORS. PER RFI#13 ANTENNAS LOCATION. RFP#79 REMOVE AND DISPOSE OF ALL OF THE OLD BUILDING FOUNDATION. |
| Jul 28, 2022 | P00023 | $497.9K | P1801 DELTA T |
| Jul 21, 2022 | P00022 | $-157.2K | MODIFICATION TO CORRECT THE INCREMENTAL FUNDING ON CLIN 0001 FROM MODIFICATION P00021. |
| May 26, 2022 | P00021 | $40.4M | ADD FUNDING FOR PROJECT P1800, CONTRACT LINE ITEM NUMBER (CLIN) 0001. |
| May 18, 2022 | P00020 | $5.6M | P1800 - INSTALL APPROXIMATELY 1000 LINEAR FEET OF 24 INCH HDPE PIPE TO REROUTE SANITARY SEWER FORCE MAIN. |
| May 10, 2022 | P00019 | $-5.2M | BASE BID - P1800 (BASE,OPTIONS 1-5) |
| May 2, 2022 | P00018 | $-6.8M | DELETE CLIN 0011 AND 0012, DEMOLITION OF H1 AND ASSOCIATED BLDGS |
| Mar 1, 2022 | P00017 | $0 | P1800 AND P1801 CREDIT MODS |
| Jan 14, 2022 | P00016 | $-3.0K | P-1801 MARDIV, INCORPORATE RFI#4 WHICH CHANGES THE RFP LANGUAGE FOR THE FIRE SPRINKLER AND FIRE ALARM SYSTEM FROM TWO BUILDINGS TO BE TREATED AS A SINGLE BUILDING. |
| Dec 21, 2021 | P00015 | $182.5K | P� 2D MARDIV COMMAND DECK OSS & BLDG PDS CHANGE THE COMMAND DECK IN ITS ENTIRETY TO OSS IN THE SECURITY OFFICE ROOM 338Z, ADD ONE (1) PDS DROP IN THE G-4 AREA ROOM 157, ADD ONE (1) PDS DROP |
| Dec 10, 2021 | P00014 | $-33.7K | BASE BID - P1800 (BASE,OPTIONS 1-5) |
| Oct 1, 2021 | P00013 | $0 | CORRECT LINE OF ACCOUNTING AND COMPLETION DATE. |
| Sep 30, 2021 | P00011 | $3.9M | BASE BID - P1800 (BASE,OPTIONS 1-5) |
| Sep 30, 2021 | P00012 | $0 | BASE BID - P1800 (BASE,OPTIONS 1-5) |
| Sep 29, 2021 | P00010 | $3.0M | BASE BID - P1800 (BASE,OPTIONS 1-5) |
| Sep 20, 2021 | P00008 | $0 | BASE BID - P1800 (BASE,OPTIONS 1-5) |
| Sep 20, 2021 | P00009 | $0 | RESCIND SUSPENSION OF WORK ISSUED ON MAY 14, 2021 VIA MODIFICATION P00005 AND AUGUST 24, 2021 VIA MODIFICATION P00007. |
| Aug 24, 2021 | P00006 | $199.2K | P-1800 MEF CHANGE SANITARY SEWER TIE-IN LOCATION. |
| Aug 24, 2021 | P00007 | $0 | SUSPEND WORK AT P1800 AND P1801 |
| May 14, 2021 | P00005 | $0 | SUSPEND WORK AT P1800 AND P1801 |
| Apr 20, 2021 | P00004 | $0 | LIFT SUSPENSION |
| Apr 6, 2021 | P00003 | $0 | SUSPEND WORK AT P1800 |
| Mar 2, 2021 | P00002 | $18.0M | ADD FUNDING FOR P1800 |
| Jan 8, 2021 | P00001 | $0 | ADMINISTRATIVE CHANGES - CHANGE THE ADMIN OFFICE, CORRECT THE WAWF INFORMATION, AND INCORPORATE THE PRE-AWARD SUBCONTRACTING PLAN |
| Dec 22, 2020 | 0 | $102.6M | BASE BID - P1800 (BASE,OPTIONS 1-5) |
Estimated positioning window
Feb 16, 2027 – Aug 16, 2027
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2028-02-16 (472 days from calculation)
- +25 points
- 179 historical awards in this buyer and category group
- +15 points
- 74 recorded award transactions
- +10 points
- Latest award action: 2026-05-04
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.