Federal contract award

N4008525F0233

DESIGN THE REPAIR AND REPLACEMENT OF FIRE SUPPRESSION SYSTEMS FOR BUILDINGS B77, B159, B164 AT THE NAVAL SUBMARINE BASE NEW LONDON. DESIGN FOR REPLACING A FIRE PUMP CONTROLLER FOR B488

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM MID-ATLANTIC
NAICS541330 — Engineering Services
PSCC1JZ — ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS
Parent award / vehicleN4008522D0004
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$276.4K
Current contract value$276.4K
Potential contract value / ceiling$352.6K
Start dateJul 17, 2025
Current end dateMay 6, 2026
Potential end dateMay 6, 2026
Latest award activityJun 11, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 11, 2026P00002$-6.4KREDUCE THE SCOPE OF WORK.
Jan 15, 2026P00001$0DESIGN THE REPAIR AND REPLACEMENT OF FIRE SUPPRESSION SYSTEMS FOR BUILDINGS B77, B159, B164 AT THE NAVAL SUBMARINE BASE NEW LONDON. DESIGN FOR REPLACING A FIRE PUMP CONTROLLER FOR B488
Jul 21, 20250$282.8KDESIGN THE REPAIR AND REPLACEMENT OF FIRE SUPPRESSION SYSTEMS FOR BUILDINGS B77, B159, B164 AT THE NAVAL SUBMARINE BASE NEW LONDON. DESIGN FOR REPLACING A FIRE PUMP CONTROLLER FOR B488

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.