Federal contract award

N4215825PE106

FLUID FILTER 3/4IN PIPE SIZE, 1IN TUBE SIZE3000 PSI PRESSURE RATING 4500 PSID ELEMENT COLLAPSEWITH FNPT END CONNECTIONS CRES HOUSING, CRES WIRE MESH FILTER ELEMENT70 DURO BUNA-N O-RING 40 MICRON NOM (75 ABSOLUTE)NORMAN FILTER P/N: 4326GG-40VL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNORFOLK NAVAL SHIPYARD GF
NAICS333998 — All Other Miscellaneous General Purpose Machinery Manufacturing
PSC4330 — Centrifugals, Separators, and Pressure and Vacuum Filters
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$6.3K
Current contract value$6.3K
Potential contract value / ceiling$6.3K
Start dateJun 10, 2025
Current end dateSep 26, 2025
Potential end dateSep 26, 2025
Latest award activitySep 30, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 30, 2025P00002$0FLUID FILTER 3/4IN PIPE SIZE, 1IN TUBE SIZE3000 PSI PRESSURE RATING4500 PSID ELEMENT COLLAPSEWITH FNPT END CONNECTIONSCRES HOUSING, CRES WIRE MESH FILTER ELEMENT70 DURO BUNA-N O-RING40 MICRON NOM (75 ABSOLUTE)NORMAN FILTER P/N: 4326GG-40VL
Sep 5, 2025P00001$139FLUID FILTER 3/4IN PIPE SIZE, 1IN TUBE SIZE3000 PSI PRESSURE RATING4500 PSID ELEMENT COLLAPSEWITH FNPT END CONNECTIONSCRES HOUSING, CRES WIRE MESH FILTER ELEMENT70 DURO BUNA-N O-RING40 MICRON NOM (75 ABSOLUTE)NORMAN FILTER P/N: 4326GG-40VL
Jul 1, 20250$6.2KFLUID FILTER 3/4IN PIPE SIZE, 1IN TUBE SIZE3000 PSI PRESSURE RATING 4500 PSID ELEMENT COLLAPSEWITH FNPT END CONNECTIONS CRES HOUSING, CRES WIRE MESH FILTER ELEMENT70 DURO BUNA-N O-RING 40 MICRON NOM (75 ABSOLUTE)NORMAN FILTER P/N: 4326GG-40VL

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.