Federal contract award

N4425522F4035

P454 MULTI-MISSION DRYDOCK - INITIAL STUDIES

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM NORTHWEST
NAICS541330 — Engineering Services
PSCC211 — Architect - Engineer Services (including landscaping, interior layout, and designing)
Parent award / vehicleN6274221D0001
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$249.8M
Current contract value$249.8M
Potential contract value / ceiling$249.8M
Start dateFeb 18, 2022
Current end dateJun 6, 2028
Potential end dateJun 6, 2028
Latest award activityMay 29, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 29 of 29 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 29, 2026P00028$1.3MP454 MULTI-MISSION DRYDOCK
Apr 1, 2026P00027$338.9KPREPARE, PRESENT, ATTEND, AND SUPPORT NAVFAC NW P454 PM AND DM IN NUMEROUS EXECUTIVE LEADERSHIP BRIEFS AND INDUSTRY EXCHANGE EVENTS PLANNED FOR MARCH THROUGH APRIL 2026.
Mar 11, 2026P00026$143.2KREQUEST FOR EQUITABLE ADJUSTMENT P 454 - MULTI MISSION DRY DOCK (M2D2) - INITIAL STUDIES PUGET SOUND NAVAL SHIPYARD (PSNS), BREMERTON, WASHINGTON
Mar 2, 2026P00025$2.7MP454 MULTI MISSION DRY DOCK - PERFORM BIO-ASSAY TESTING IN SUPPORT OF PERMITTING OF M2D2 CONSTRUCTION, KITSAP, BREMERTON.
Oct 17, 2025P00024$996.2KP454 MULTI MISSION DRY DOCK - PERFORM BIO-ASSAY TESTING IN SUPPORT OF PERMITTING OF M2D2 CONSTRUCTION, KITSAP, BREMERTON.
Sep 5, 2025P00023$10.4MP454 - PHASE 4.2: CREATION OF MULTIPLE CONSTRUCTION CONTRACTS DESIGN PACKAGES, IN NAVAL BASE KITSAP, BREMERTON
Aug 14, 2025P00022$76.0KREQUEST FOR EQUITABLE ADJUSTMENT
May 15, 2025P00021$0PROVIDE ALL EFFORTS AS REQUIRED TO INCORPORATE COST REDUCTION OPPORTUNITIES INTO THE P454 M2D2 DESIGN PACKAGE.
Apr 17, 2025P00020$9.0MPROVIDE ALL EFFORTS AS REQUIRED TO INCORPORATE COST REDUCTION OPPORTUNITIES INTO THE P454 M2D2 DESIGN PACKAGE.
Mar 27, 2025P00019$9.2KP454 MULTI-MISSION DRYDOCK (50% DESIGN, PHASE 4.5 80% OTS MEETING
Mar 25, 2025P00018$206.6KP454 MULTI-MISSION DRYDOCK, PHASE 3.5.1 MCCA
Mar 21, 2025P00017$0P454 MULTI-MISSION DRYDOCK, FUNDING ACRN UPDATES TO SLIN 001201 UNDER CLIN 0012.
Feb 19, 2025P00016$36.2MP454 MULTI-MISSION DRYDOCK- 80% TO FINAL DESIGN.
Jan 29, 2025P00015$0P454 MULTI-MISSION DRYDOCK - DESIGN PHASE 4.0.1 - 65% SHORE FACILITY DESIGN COORDINATION EXTENSION - NO COST MOD
Dec 18, 2024P00014$0ADMIN MODIFICATION TO ADD SDN TO FUNDING TAB
Nov 27, 2024P00013$249.5KPHASE 3.5 MULTIPLE CONSTRUCTION CONTRACT ASSESSMENT
Nov 25, 2024P00012$39.9MP454 MULTI-MISSION DRYDOCK - 80% AND OPTION FOR FINAL DESIGN
Aug 1, 2024P00011$239.1KP454 MULTI-MISSION DRYDOCK PHASE 3.4 COST SAVINGS REDUCTION
May 9, 2024P00010$931.3KP454 MULTI-MISSION DRY DOCK PHASE 3.1
Jan 24, 2024P00009$58.3KP454 MULTI-MISSION DRYDOCK (50% DESIGN)- REQUEST FOR EQUITABLE ADJUSTMENT - ESTABLISHMENT OF A CENTRAL ACCUMULATION AREA (CAA) AT PUGET SOUND NAVAL SHIPYARD, BREMERTON, WA
Nov 14, 2023P00008$50.0MP454 MULTI-MISSION DRYDOCK, AE SERVICES, PSNS, BREMERTON, WA
Nov 2, 2023P00007$130.6KP454 MULTI-MISSION DRYDOCK (35% DESIGN)
Jul 14, 2023P00006$-702.8KP454 MULTI-MISSION DRYDOCK (35% DESIGN)
Jun 9, 2023P00005$4.0MP454 MULTI-MISSION DRYDOCK (35% DESIGN) ADDITIONAL SURVEYS, TEST PILE PROGRAM STUDY, DREDGE MATERIAL CHARACTERIZATION
Apr 12, 2023P00004$0P454 MULTI-MISSION DRYDOCK (35% DESIGN)- NO-COST, ADMINISTRATIVE MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE FOR CLINS 0002 AND 0003.
Apr 10, 2023P00003$86.0KP454 MULTI-MISSION DRYDOCK DESIGN (VADM BRIEF - WASH DC)
Mar 14, 2023P00002$49.3MP454 MULTI-MISSION DRYDOCK (35% DESIGN)
Jul 11, 2022P00001$36.0MP454 MULTI-MISSION DRYDOCK (15% DESIGN) DEVELOPMENT OF A PRELIMINARY DESIGN: MCON PACKAGE TO A SCHEMATIC DESIGN SUBMITTAL (10%-15%) PER FC 1-300-09N OF A MULTI-MISSION DRY DOCK (M2D2) FACILITY.
Feb 18, 20220$8.1MP454 MULTI-MISSION DRYDOCK - INITIAL STUDIES

Estimated positioning window

Jun 6, 2027 – Dec 6, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2028-06-06 (590 days from calculation)
+25 points
29 historical awards in this buyer and category group
+15 points
29 recorded award transactions
+10 points
Latest award action: 2026-05-29
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.