Federal contract award

N4425525F0061

PROJECT WILL REMOVE AND DISPOSE OF EXISTING OILY WASTEWATER TREATMENT SYSTEM (OWTS) AT FACILITY 705 (DRY DOCK 5). DEMOLITION AND DISPOSAL WILL INCLUDE FOUR ASSOCIATED WATER STORAGE TANKS TO INCLUDE TWO 40,000 GALLON AND TWO 20,000-GALLON TANKS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM NORTHWEST
NAICS236220 — Commercial and Institutional Building Construction
PSCY1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleN4425523D1603
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$14.3M
Current contract value$14.3M
Potential contract value / ceiling$14.3M
Start dateMay 15, 2025
Current end dateAug 25, 2026
Potential end dateAug 25, 2026
Latest award activityApr 29, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 29, 2026P00004$21.9KPROJECT WILL REMOVE AND DISPOSE OF EXISTING OILY WASTEWATER TREATMENT SYSTEM (OWTS) AT FACILITY 705 (DRY DOCK 5). DEMOLITION AND DISPOSAL WILL INCLUDE FOUR ASSOCIATED WATER STORAGE TANKS TO INCLUDE TWO 40,000 GALLON AND TWO 20,000-GALLON TANKS.
Feb 3, 2026P00003$3.8MPROJECT WILL REMOVE AND DISPOSE OF EXISTING OILY WASTEWATER TREATMENT SYSTEM (OWTS) AT FACILITY 705 (DRY DOCK 5). DEMOLITION AND DISPOSAL WILL INCLUDE FOUR ASSOCIATED WATER STORAGE TANKS TO INCLUDE TWO 40,000 GALLON AND TWO 20,000-GALLON TANKS.
Jun 6, 2025P00002$0PROJECT WILL REMOVE AND DISPOSE OF EXISTING OILY WASTEWATER TREATMENT SYSTEM (OWTS) AT FACILITY 705 (DRY DOCK 5). DEMOLITION AND DISPOSAL WILL INCLUDE FOUR ASSOCIATED WATER STORAGE TANKS TO INCLUDE TWO 40,000 GALLON AND TWO 20,000-GALLON TANKS.
May 15, 20250$10.4MPROJECT WILL REMOVE AND DISPOSE OF EXISTING OILY WASTEWATER TREATMENT SYSTEM (OWTS) AT FACILITY 705 (DRY DOCK 5). DEMOLITION AND DISPOSAL WILL INCLUDE FOUR ASSOCIATED WATER STORAGE TANKS TO INCLUDE TWO 40,000 GALLON AND TWO 20,000-GALLON TANKS.
May 15, 2025P00001$0PROJECT WILL REMOVE AND DISPOSE OF EXISTING OILY WASTEWATER TREATMENT SYSTEM (OWTS) AT FACILITY 705 (DRY DOCK 5). DEMOLITION AND DISPOSAL WILL INCLUDE FOUR ASSOCIATED WATER STORAGE TANKS TO INCLUDE TWO 40,000 GALLON AND TWO 20,000-GALLON TANKS.