Federal contract award

N6133123F3002

AIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVAL SURFACE WARFARE CENTER
NAICS541330 — Engineering Services
PSCR425 — Engineering and Technical Services
Parent award / vehicleN0017819D7206
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$8.9M
Current contract value$12.8M
Potential contract value / ceiling$16.3M
Start dateApr 16, 2023
Current end dateApr 15, 2027
Potential end dateApr 15, 2028
Latest award activityJun 1, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 31 of 31 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 1, 2026P00030$601.3KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATEDLOGISTICS SUPPORT
Apr 29, 2026P00029$331.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATEDLOGISTICS SUPPORT
Apr 10, 2026P00028$210.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATEDLOGISTICS SUPPORT
Mar 24, 2026P00027$10.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATEDLOGISTICS SUPPORT
Sep 26, 2025P00026$432.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Sep 23, 2025P00025$90.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Sep 9, 2025P00024$160.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Jul 24, 2025P00023$194.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Jun 27, 2025P00022$75.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
May 22, 2025P00021$32.5KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
May 5, 2025P00020$43.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Apr 24, 2025P00019$62.7KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Apr 4, 2025P00018$145.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Mar 20, 2025P00017$116.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Mar 10, 2025P00016$60.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Feb 18, 2025P00015$140.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Jan 6, 2025P00014$100.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Oct 31, 2024P00013$80.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Aug 26, 2024P00012$277.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Aug 15, 2024P00011$-96.5KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Jun 28, 2024P00010$173.6KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
May 21, 2024P00009$499.2KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Apr 23, 2024P00008$100.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Mar 28, 2024P00007$100.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Feb 20, 2024P00006$50.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Aug 15, 2023P00005$1.2MAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
May 1, 2023P00004$25.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Apr 24, 2023P00003$722.9KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Mar 24, 2023P00002$307.2KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Feb 21, 2023P00001$0AIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT
Feb 2, 20230$10.0KAIRBORNE MINE COUNTERMEASURES (AMCM) SYSTEMS DEPOT LEVEL REPAIR, MAINTENANCE, OVERHAUL, IN-SERVICE ENGINEERING AGENT (ISEA), PERFORMANCE SUPPORT SYSTEM (PSS) LIFE CYCLE MANAGEMENT, LIFE CYCLE MAINTENANCE, AND INTEGRATED LOGISTICS SUPPORT

Estimated positioning window

Apr 15, 2027 – Oct 15, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2028-04-15 (538 days from calculation)
+25 points
74 historical awards in this buyer and category group
+15 points
31 recorded award transactions
+10 points
Latest award action: 2026-06-01
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.