Federal contract award

N6134022C0024

RRL ATT REQUIREMENT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAWC TRAINING SYSTEMS DIV
NAICS611420 — Computer Training
PSC6910 — Training Aids
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeCOST PLUS FIXED FEE
Obligations$60.8M
Current contract value$60.8M
Potential contract value / ceiling$69.7M
Start dateSep 20, 2022
Current end dateNov 13, 2026
Potential end dateNov 13, 2026
Latest award activityApr 15, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 13 of 13 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 15, 2026P00012$4.5MCONTENT ACCELERATOR AND MISSION ESSENTIAL TRAINING
Dec 22, 2025P00011$0RRL ATT REQUIREMENT
Sep 26, 2025P00010$5.2MTHE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL BEE MLE MODULES
Sep 23, 2025P00009$4.5MSAILOR 2025 (S2025) FISCAL YEAR 2022 (FY22) READY RELEVANT LEARNING (RRL) SURFOR FIRE CONTROLMAN AEGIS (FCA) CONTENT CONVERSION (CC)
Jul 29, 2025P00008$993.8KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ENGINEERING CHANGE PROPOSAL 05.
Apr 9, 2025P00007$0THE PURPOSE OF THIS MODIFICATION IS TO: SECTION I: IDENTIFIED CLAUSES TO BE REMOVED, ADDED, AND MODIFIED IN ACCORDANCE WITH PRESIDENTIAL EXECUTIVE ORDER14148, 14168 & 14173.
Nov 4, 2024P00006$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE SOW REVISION 4.
Sep 26, 2024P00005$3.1MTHS PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ENGINEERING CHANGE PROPOSAL 04.
Jul 29, 2024P00004$10.4MTHE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL ATT UPGRADES FOR NUMEROUS TRAINING SYSTEMS.
Sep 27, 2023P00003$23.1MINCREASING VALUE OF CLIN 0002 BY $23,071,359, THE CONTRACTOR TO DESIGN AND DEVELOP AND PILOT A SOJT PROTOTYPE CAPABILITY USING LARGE LANGUAGE MODEL (LLM) AND TRANSFORMER TECHNOLOGY. THIS MOD INCREASES THE VALUE FROM $7,985,502 TO $31,056,861.
Jul 14, 2023P00002$5.0MADD CLINS FOR NEW WORK TO BE PERFORMED UNDER DIRECTION OF THE UPDATED SOW. PID N61340-23-RFPREQ-136300G-0445
Oct 31, 2022P00001$0EXTEND THE DELIVERY DATE FROM 31 MARCH 2023 TO 15 DECEMBER 2023 AND UPDATE 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018) UNDER THE AUTHORITY OF CLAUSE 52.243-2 CHANGES-COST-REIMBURSEMENT.
Sep 20, 20220$3.0MRRL ATT REQUIREMENT

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2026-11-13 (19 days from calculation)
+35 points
3 historical awards in this buyer and category group
+10 points
13 recorded award transactions
+10 points
Latest award action: 2026-04-15
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.