Federal contract award

N6247099C3633

UTILITY SERVICES

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM MID-ATLANTIC
NAICS926130 — Regulation and Administration of Communications, Electric, Gas, and Other Utilities
PSCS119 — Other Utilities
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$103.2M
Current contract value$103.2M
Potential contract value / ceiling$103.2M
Start dateAug 31, 2001
Current end dateSep 30, 2026
Potential end dateSep 30, 2026
Latest award activitySep 26, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 65 of 65 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 11, 2026P00088$67.6KLONG LEAD TIME EQUIPMENT PROCUREMENT, CONTRACT N62470-99-C-3633, LBES 20MW POWER UPGRADES AT THE PHILADELPHIA NAVY YARD, PHILADELPHIA, PA
Sep 26, 2025P00087$1.1MMODIFICATION FOR CONTRACT N62470-99-C-3633, BLDG. 77L SECURE PERIMETER PROJECT, ELECTRICAL SERVICE REQUEST FOR LIGHT POLE INSTALLATION, PNYA
Sep 9, 2025P00086$30.2KMODIFICATION FOR CONTRACT N62470-99-C-3633, BLDG. 77L SECURE PERIMETER PROJECT, ELECTRICAL SERVICE REQUEST FOR LIGHT POLE INSTALLATION, PNYA
Apr 14, 2025P00085$515.3KTEMPORARY MUSE TRANSFORMER BUILDING 592, PNYA
Jan 24, 2025P00084$20.2M20MW LBES POWER EXPANSION
Sep 30, 2024P00083$3.0M20MW POWER UPGRADE, LONG LEAD EQUIPMENT PROCUREMENT, PNYA
Jun 26, 2024P00082$60.6KENGINEERING AND DESIGN SERVICES FOR PECO INTERCONNECT AGREEMENT, PNYA
Feb 20, 2024P00081$260.4KDESIGN AND ENGINEERING SERVICES FOR DIRECTIONAL DRILLING, BUILDING 77H, PNYA
Dec 27, 2023P00080$19.6KEVALUATION OF LIGHTING AND ELECTRICAL REPAIRS, BLDG 546
Sep 28, 2023P00079$2.4MDESIGN AND CONSTRUCTION OF OFF-YARD INFRASTRUCTURE REQUIRED TO PROVIDE 20 MW TO BLDG. 77H AT PNYA
Sep 8, 2023P00078$737.9KDESIGN AND ENGINEERING SUPPORT FOR LBES 20MW EXPANSION
Apr 3, 2023P00077$200.0KDESIGN AND CONSTRUCTION ESTIMATING SERVICES FOR A NEW 20MW SERVICE LINE
Mar 16, 2023P00076$32.3KADD UNDER VOLTAGE PROTECTION AT B77 SWITCHGEAR
Jan 20, 2023P00075$9.9K20MW CONTINUED SUPPORT
Dec 12, 2022P00074$020MW POWER SERVICE TO BUILDING 77H - PNSY
Sep 15, 2022P00073$11.0KDIEF CONTROLS ASSOCIATED WITH 20MW POWER UPGRADE
Aug 9, 2022P00072$29.3KTEST AND ANALYSIS OF SUBSTANCE FOUND AROUND NEW MANHOLES.
Apr 20, 2022P00071$64.8K10 MW POWER STUDY BUILDING 77H
Mar 18, 2022P00070$237.4KREPAIR OR REPLACEMENT OF ELECTRIC MANHOLE #340
Dec 15, 2020P00069$19.7MMODIFICATION FOR A 20MW POWER DISTRIBUTION UPGRADE AT PNYA.
Nov 19, 2020P00068$1.4M20MW CAPACITY INCREASE SWITCHGEAR
Sep 28, 2020P00067$1.0MUTILITY ELECTRICAL SERVICES IN SUPPORT OF P-106
Aug 12, 2020P00066$0SEWER&WATER SERVICE CONNECTION BLDG. 662
Aug 4, 2020P00065$240.3KELECTRIC SERVICES TO MODULAR FACILITY OUTSIDE OF BUILDING B29
Jun 12, 2020P00064$0MODIFICATION TO ADD FAR AND DFARS CLAUSES REGARDING THE HANDLING OF GOVERNMENT PROVIDED INFORMATION.
Apr 15, 2020P00063$0ADMINISTRATIVE MODIFICATION CORRECTION LINES OF ACCOUNTING.
Feb 19, 2020P00062$106.7KENVIRONMENTAL CONTAMINATION CLEAN UP
Jan 28, 2020P00061$0MODIFICATION TO INCORPORATE DFARS 252.232-7006, WIDE AREA WORKFLOW
Jan 24, 2020P00060$457.9K20MW CAPACITY INCREASE, 100% DESIGN
Sep 23, 2019P00059$350.0K20MW MODIFICATION, FUNDING PECO DESIGN EFFORT
Jul 31, 2019P00058$742.0K20MW POWER UPGRADE FOR NSWC
Jan 11, 2019P00057$797.6KMODIFICATION FOR UNFORESEEN CONDITIONS WHILE CONDUCTING WORK ON THE 8MW CAPACITY INCREASE
Jun 27, 2018P00056$17.0M8MW CAPACITY INCREASE
Apr 18, 2018P00055$323.4KIGF::OT::IGF T-1029 ELECTRICAL
Apr 16, 2018P00054$12.6KIGF::OT::IGF CORRECT LOA ON MANHOLE MOD
Mar 14, 2018P00053$889.8KIGF::OT::IGF 602A SWITCHGEAR
Mar 9, 2018P00052$0IGF::OT::IGF MANHOLE INVESTIGATION
Feb 20, 2018P00051$94.3K8MW CAPACITY INCREASE
Jan 22, 2018P00050$2.4MIGF::OT::IGF B20 FEEDER INSTALLATION
Jan 12, 2018P00049$8.3MIGF::OT:: 8.46MW CAPACITY INCREASE
Oct 5, 2017P00048$12.6MIGF::OT::IGF 8MW CAPACITY INCREASE
Aug 11, 2017P00047$55.3KSTEAM
Apr 26, 2017P00046$1.6MTHIS MODIFICATION IS ISSUED FOR AN ACTION AWARDED PRIOR TO 3/13; THIS MODIFICATION IS ISSUED FOR DESIGN WORK FOR CAPACITY INCREASE TO BE COMPLETED AT THE NFPC.
Sep 19, 2016P00045$38.4KPERFORM POWER ANALYSIS.
Jun 8, 2016P00044$562.0KREROUTE FEEDER F1312, ADD FEEDER F1321
Feb 3, 2016P00043$0VENDOR INFORMATION UPDATE TO ADDRESS, CAGE, AND DUNS FOR PHILADELPHIA AUTHORITY FOR INDUSTRIAL DEVELOPMENT.
Dec 1, 2015P00042$162.2KRE-ROUTE ELECTRIC SERVICE 77H COOLING TOWER
Sep 28, 2015P00041$1.1MELECTRICAL UPGRADE IN SUPPORT OF P547
May 13, 2015P00040$0STEAM
May 12, 2015P00039$0STEAM
Dec 18, 2014P00038$339.3KSTEAM
Jun 18, 2013P00037$0STEAM
Apr 29, 2013P00036$174.4KELECTRIC SERVICE MEDICAL CLINIC
Dec 27, 2012P00035$7.4KSTEAM
Sep 29, 2012P00034$332.8KSTEAM
May 2, 2012P00033$8.0KSUPPLY THE NECESSARY MANPOWER IN ORDER TO SAFELY CONDUCT THE SWITCHING AND LOCK-OUT/TAG-OUT OF FEEDERS 1311 AND 1319 IN CONTRACTOR'S SUBSTATION 93.
Jul 1, 2011P00032$33.0KTERMINATION OF UNUSED SECTION OF STORM SEWER.
Jan 3, 2011P00031$13.7KSTEAM
Sep 10, 2010P00030$1.1MSTEAM RATE ADJUSTMENT
Jun 7, 2010P00029$0STEAM
Mar 19, 2010P00028$351.5KSTEAM
Jan 6, 2010P00027$31.9KSTEAM
Sep 29, 2009P00026$1.6MUTILITY SERVICES
Apr 16, 2008P00019$480.2KELECTRICAL UPGRADE
Aug 31, 20010$0UTILITY SERVICES