Federal contract award

N6247820F4128

ARCHITECT ENGINEER SERVICE FOR DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS TO REPAIR ROADS, INSTALL EROSION CONTROL AND ROCK FALL PROTECTION AT RED HILL. PROJECT RM17-1635 REPAIR ROADS AND EROSION CONTROL RED HILL, JOINT BASE PEARL HARBOR HICKAM

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM HAWAII
NAICS541330 — Engineering Services
PSCC211 — Architect - Engineer Services (including landscaping, interior layout, and designing)
Parent award / vehicleN6247818D5030
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$3.5M
Current contract value$3.5M
Potential contract value / ceiling$3.5M
Start dateApr 30, 2020
Current end dateDec 31, 2028
Potential end dateDec 31, 2028
Latest award activityMay 12, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 12, 2026P00004$0T.O. MODIFICATION UNDER A-E IDIQ CONTRACT TO EXTEND CCD FROM 05/15/2026 TO 12/31/2028 FOR RM17-1635 REPAIR ROADS AND EROSION CONTROL, RED HILL
Mar 15, 2024P00003$307.4KARCHITECT ENGINEERING SERVICE MODIFICATION TO MODIFY THE DESIGN BID BUILD CONSTRUCTION PACKAGE FOR RM 17-1635 REPAIR ROADS AND EROSION CONTROL, JOINT BASE PEARL-HARBOR HICKAM, RED HILL, HAWAII.
Dec 27, 2022P00002$306.7KMODIFICATION TO INCLUDE POST CONSTRUCTION AWARD SERVICE FOR ARCHITECT ENGINEERING SERVICE PROJECT RM17-1635 REPAIR ROADS AND EROSION CONTROL JOINT BASE PEARL HARBOR HICKAM, RED HILL
Feb 23, 2021P00001$299.9KMODIFICATION TO INCLUDE GRAVEL ROAD BETWEEN UPPER ACCESS ROAD AND RIDGE ROAD FOR ARCHITECT ENGINEERING SERVICE PROJECT REPAIR ROADS AND EROSION CONTROL - ADDITIONAL AREAS, JOINT BASE PEARL HARBOR HICKAM, RED HILL
Apr 30, 20200$2.6MARCHITECT ENGINEER SERVICE FOR DESIGN-BID-BUILD CONSTRUCTION DOCUMENTS TO REPAIR ROADS, INSTALL EROSION CONTROL AND ROCK FALL PROTECTION AT RED HILL. PROJECT RM17-1635 REPAIR ROADS AND EROSION CONTROL RED HILL, JOINT BASE PEARL HARBOR HICKAM

Estimated positioning window

Dec 31, 2027 – Jun 30, 2028

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2028-12-31 (798 days from calculation)
+15 points
135 historical awards in this buyer and category group
+15 points
5 recorded award transactions
+10 points
Latest award action: 2026-05-12
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.