Federal contract award

N6247821F4087

FY21 MCON PROJECT P-044 WATERFRONT IMPROVEMENTS WHARVES S8, S9, AND S10 AND FY21 MCON PROJECT P-1006 WATERFRONT IMPROVEMENTS WHARVES S1, S11-S13, S20-S21 & Y2, JBPHH, HI

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM HAWAII
NAICS236220 — Commercial and Institutional Building Construction
PSCY1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Parent award / vehicleN6247820D4015
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$61.7M
Current contract value$61.7M
Potential contract value / ceiling$61.7M
Start dateApr 30, 2021
Current end dateFeb 15, 2024
Potential end dateFeb 15, 2024
Latest award activityMay 1, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 1, 2026P00008$103.6KTHIS MODIFICATION IS FOR WORK INCLUDING REPLACING HIGH-PRESSURE AIR OUTLETS, REPAIRING A CONCRETE MANHOLE, INSTALLING NEW HARDWARE AND DUCTING, AND ALTERING THE HIGH-PRESSURE AIR SYSTEMS CONNECTION POINT.
Jan 29, 2026P00007$322.0KMODIFICATION P00007 (PC 7 8 24 26) MCON PROJECT P-044 P-1006 WATERFRONT IMPROVEMENTS, JBPHH HI
Sep 17, 2025P00006$41.5KMODIFICATION P00006 (PC 15) MCON PROJECT P-044 P-1006 WATERFRONT IMPROVEMENTS, JBPHH HI
Sep 15, 2025P00005$361.6KMODIFICATION P00005 (PC 13 14 20 21 22 27 28 29) MCON PROJECT P-044 P-1006 WATERFRONT IMPROVEMENTS, JBPHH HI
Aug 4, 2025P00004$196.8KMODIFICATION P00004 (PC 6 11 16 17 18 19) MCON PROJECT P-044 P-1006 WATERFRONT IMPROVEMENTS, JBPHH HI
Apr 17, 2025P00003$1.2MN6247820D4015-N6247821F4087 MCON P-044_P-1006 WF WHARVES MODS FOR PC 2 (ADDTL PILE LENGTH S21B) PC 4 (INC S10 TRENCH DRAIN DEPTH RFI 44) PC 5 (BACKERBOARD MATERIAL CHANGE) PC 34 (WORK PLATFORM AT STA K20) AND PC 35 (INTERLOCK SWITCH S10, S11, S12).
Apr 9, 2025P00002$-81.2KN62478-20-D-4015-N6247821F4087 P-044 AND P-1006 WF WHARVES MODIFICATION FOR PC 3 DESCOPE OF THE SERVICE LIFE DESIGN REQUIREMENT AND REVISED ALTERNATE TESTING REQUIREMENT PER RFI 9.1.
Mar 20, 2025P00001$981.8KN62478-20-D-4015-N6247821F4087 WATERFRONT IMPROVEMENTS WHARVES, JBPHH, HI. MODIFICATION FOR PC 1 FOR ADDITIONAL COST AND TIME DUE TO UNFORESEEN EXISTING FENDER PILE IN S9B #62 AND PILE EXTRACTION ALTERNATE METHODS REQUIRED.