Federal contract award
N6274214C1327
IGF::OT::IGF FY13 P904 MV-22 HANGAR&INFRASTRUCTURE AND FY 13 P905 AIRCRAFT STAGING AREA
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | NAVFACSYSCOM HAWAII |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1BZ — CONSTRUCTION OF OTHER AIRFIELD STRUCTURES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $69.8M |
| Current contract value | $69.8M |
| Potential contract value / ceiling | $69.8M |
| Start date | Dec 17, 2013 |
| Current end date | Jun 18, 2021 |
| Potential end date | Jun 18, 2021 |
| Latest award activity | May 29, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 55 of 55 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 29, 2026 | P00003 | $0 | N62742-14-C-1327; PCM X-79 REQUEST FOR CURRENT YEAR FUNDS TO PAY FINAL INVOICE (AS PREVIOUS FUNDS WERE CANCELLED). |
| Aug 6, 2024 | P00002 | $356.7K | PCM X-75 |
| Aug 25, 2021 | A00051 | $507.3K | P904 MV-22 HANGAR & INFRASTRUCTURE_PCM X-74_OWS WIRING |
| Feb 19, 2021 | A00050 | $15.8K | P904 MV-22 HANGAR & INFRASTRUCTURE_PCM X-73 MISSING SPARE CONDUITS |
| Dec 17, 2020 | A00049 | $5.0K | P904 MV-22 HANGAR & INFRASTRUCTURE_PCM X-72 CONCRETE REPAIR RFI 523 |
| Sep 14, 2020 | A00048 | $3.9K | P904 MV-22 HANGAR&INFRASTRUCTURE _ PCM X-71 DISPOSE OF OLD FREQUENCY CONVERTERS |
| Aug 18, 2020 | A00047 | $12.2K | P904 MV-22 HANGAR&INFRASTRUCTURE PCM X-69 CTS AND AMMETER |
| Feb 11, 2020 | A00046 | $931.6K | P904 MV-22 HANGAR&INFRASTRUCTURE - PCM X-64, DSGN ERROR AFFF REVISIONS AND PCM X-68, DSGN ERROR STORM DRAIN REVISIONS |
| Aug 22, 2019 | A00045 | $-45.5K | N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-67, DELETE REMOVAL OF CIRCUITS 3A AND 3B |
| Jul 11, 2019 | A00044 | $982.8K | N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-31R1, PRIMARY FEEDER UPGRADES |
| May 7, 2019 | A00043 | $14.0K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-66, REPLACE CRUSHED HAND HOLES |
| Apr 25, 2019 | A00042 | $441.8K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-53, UPGRADE FREQUENCY CONVERTERS |
| Mar 20, 2019 | A00041 | $193.6K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-50, NEW HAZMAT LOCKER |
| Jan 24, 2019 | A00040 | $377.4K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCMS X-26R2, REPLACE LIGHT FIXTURES; X-27R1 VARIOUS DESIGN CHANGES; X-44, DESIGN REVISIONS RFIS; X-45, DELETE OSP WORK; X-51 OIL WATER SEPARATOR; X-54 ADD SPLIT UNIT |
| Dec 19, 2018 | A00039 | $29.4K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-37R2, REVISE HVAC PLAN; ADD RECEPTACLES |
| Nov 20, 2018 | A00038 | $108.2K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-52, INSTALL CARBON MONOXIDE DETECTORS; PCM X-65, AFFF REPAIRS, MCBH |
| May 8, 2018 | A00037 | $89.1K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-49, VARIOUS DESIGN REVISIONS |
| Sep 19, 2017 | A00036 | $0 | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, DE-OBLIGATE FY13 FUNDS AND RE-OBLIGATE FY17 FUNDS. |
| May 25, 2017 | A00035 | $445.9K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-24, VARIOUS DESIGN REVISIONS |
| May 16, 2017 | A00034 | $148.9K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-36, PV REVISIONS AND PCM X-40R3, ALS ROOM SEAL OFF WINDOW |
| Mar 20, 2017 | A00033 | $122.0K | IGF::OT::IGF N62742-15-C-1301, MV22 P-907, PARKING APRON AND INFRASTRUCTURE AND P-908, HANGAR, MCBH, PCM X-47R1, DESIGN REVISIONS TO FIRE ALARM SYSTEM |
| Jan 24, 2017 | A00032 | $105.9K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-46, AIR DROPS, HOSE REELS, CONDUIT AND RACEWAYS FOR ANTENNA |
| Sep 6, 2016 | A00031 | $544.3K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-09, VARIOUS DESIGN CHANGES |
| Jul 19, 2016 | A00030 | $0 | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, ADMINISTRATIVE MOD TO CORRECT DRAWINGS/SPECS UNDER MODS A00025 AND A00027 |
| Jun 28, 2016 | A00029 | $16.5K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-42, REVISE STRIPING LAYOUT AND RELOCATE GATE AND FENCE |
| Jun 22, 2016 | A00028 | $187.5K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-18, ADD CLSM, INSTALL AC PAVEMENT, REMOVE TRANSITE PIPING, TAXIWAY E |
| Jun 9, 2016 | A00027 | $170.3K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-06, VARIOUS DESIGN CHANGES AND PCM X-43, INSTALL HAND HOLES |
| May 23, 2016 | A00026 | $3.0M | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-32, EXCESS BOULDER REMOVAL |
| May 5, 2016 | A00025 | $249.5K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCMS X-17, DESIGN REVISIONS, X-35, DEMOLISH CONCRETE DUCT BANKS, AND X-41, INSTALL MOISTURE REDUCING VAPOR BARRIER |
| Mar 17, 2016 | A00024 | $87.2K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-39, SOFFIT FRAMING AND PCM X-21, DESIGN REVISIONS |
| Sep 27, 2015 | A00023 | $0 | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, REVISE OBJECT CLASS CODE IN LINES OF ACCOUNTING |
| Aug 20, 2015 | A00022 | $-30.5K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-20, CREDIT FOR CONCRETE MIX VARIANCE |
| Jul 31, 2015 | A00021 | $269.1K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-22, OVEREXCAVATE UNSUITABLE MATERIALS, P-904, CLIN 0001 |
| Jun 18, 2015 | A00020 | $134.8K | IGF::OT::IGF N62742-14-C-1327, P-904, MV22 HANGAR AND INFRASTRUCTURE AND P-905, AIRCRAFT STAGING AREA, MCBH, PCM X-29, REPLACE DE-ENERGIZED CIRCUITS, P-904, CLIN 0001 |
| Apr 30, 2015 | A00019 | $95.8K | IGF::OT::IGF N62742-14-C-1327, MV22 HANGAR AND INFRASTRUCTURE, PCM X-19R1, COMM DUCTS, P-904, CLIN 0001, AND PCM X-05, DELAYS DUE TO ARCHAEOLOGICAL DISCOVERIES, P-904, CLIN 0001, MCBH |
| Apr 29, 2015 | A00018 | $1.0M | IGF::OT::IGF N62742-14-C-1327, P-904/P-905, MV22 HANGAR AND INFRASTRUCTURE, AWARD FF&E PLANNED MODIFICATION |
| Apr 24, 2015 | A00017 | $47.5K | IGF::OT::IGF N62742-14-C-1327, P-904/905, MV22 HANGAR AND INFRASTRUCTURE, PCM X-28, ROUTE CONDUCTORS, P-904, CLIN 0001, MCBH |
| Apr 3, 2015 | A00016 | $410.4K | IGF::OT::IGF N62742-14-C-1327, P-904/P-905, MV22 HANGAR AND INFRASTRUCTURE, PCM X-12R1, OVEREXCAVATE UNSATISFACTORY BOULDER MATERIAL, P-905, CLIN 0002 |
| Mar 19, 2015 | A00015 | $242.2K | IGF::OT::IGF N62742-14-C-1327, P-904/P-905, MV22 HANGAR AND INFRASTRUCTURE, PCM X-23, ADD FLY ASH TO CONCRETE, P-904, CLIN 0001, MCBH |
| Mar 10, 2015 | A00014 | $363.3K | IGF::OT::IGF N62742-14-C-1327, P904/P-905, MV22 HANGAR&INFRASTRUCTURE, PCM X-14R1, ADD FLY ASH TO CONCRETE IN APRON, P-905, CLIN 0002, MCBH |
| Jan 30, 2015 | A00013 | $0 | IGF::OT::IGF N62742-14-C-1327, P-904/905, MV22 HANGAR AND INFRASTRUCTURE, ADD DFARS CLAUSE 252.204-7012 |
| Dec 30, 2014 | A00012 | $23.4K | IGF::OT::IGF N62742-14-C-1327, P-904/905, MV22 HANGAR AND INFRASTRUCTURE, PCM X-16, ADD STONE TO HOLD SHORT PAD "E", MCBH |
| Nov 20, 2014 | A00011 | $39.8K | IGF::OT::IGF N62742-14-C-1327 P-904/905, MV22 HANGAR, PCM X-13, RUN NEW CONDUCTOR CABLES, MCBH |
| Nov 3, 2014 | A00010 | $27.3K | IGF::OT::IGF N6742-14-C-1327 P-904/905, MV22 HANGER, PCM X-15, SOIL REPLACEMENT AT HOLD SHORT PAD, TAXIWAY E, MCBH |
| Oct 21, 2014 | A00009 | $203.2K | IGF::OT::IGF N62742-14-C-1327, MV-22 APRON AND INFRASTRUCTURE, PCM X-11R1, WIDEN HOLD SHORT PADS AND ADD FLY ASH TO CONCRETE, MCBH |
| Sep 18, 2014 | A00008 | $123.7K | N62742-14-C-1327, P904 MV-22 HANGAR&INFRASTRUCTURE, PCM X-07, CRITERIA LOADING CHANGES TO STORM DRAIN MANHOLES, MCBH |
| Sep 15, 2014 | A00007 | $0 | IGF::OT::IGF CONTRACT N62742-14-C-1327, P-904/905, MV22 HANGAR, TIME EXTENSION DUE TO WEATHER DELAYS IN JULY 2014, MCBH |
| Aug 27, 2014 | A00006 | $0 | IGF::OT::IGF CONTRACT N62742-14-C-1327, P-904/905, MV22 HANGAR, ADMIN MOD TO CORRECT CONTRACT NAME AND CAGE CODE, MCBH |
| Jul 30, 2014 | A00005 | $242.8K | IGF::OT::IGF CONTRACT N62478-14-C-1327, P-904/905, MV22 HANGAR, PCM X-02, DESIGN REVISIONS FOR FIRE WATERLINE SIZES, STRUCTURAL DETAILS, ELECTRICAL DEMOLITION SITE PLAN AND COMMUNICATION DRAWINGS |
| Jul 22, 2014 | A00004 | $223.1K | IGF::OT::IGF CONTRACT N62478-14-C-1327, MV22 HANGAR, PCM X-03, REVISE LOAD CRITERIA FOR BOX CULVERTS, MCBH |
| Jul 16, 2014 | A00003 | $7.5K | IGF::OT::IGF N62742-14-C-1327, MV22 HANGAR AND INFRASTRUCTURE AND AIRCRAFT STAGING AREA, PCM X-08 EYEWASH ROUGHINS, MCBH |
| May 22, 2014 | A00002 | $28.3K | IGF::OT::IGF N62742-14-C-1327, P904 MV-22 HANGAR&INFRASTRUCTURE, PCM X-04, REMOVE HISTORIC WELL, MCBH |
| Apr 8, 2014 | A00001 | $141.0K | IGF::OT::IGF N62742-14-C-1327, FY13 P-904/P-905, AIRCRAFT HANGAR AND INFRASTRUCTURE AND AIRCRAFT STAGING AREA, PCM X-01, MOA/NPDES/SPRIGGING/LEED CHANGES, MCBH |
| Dec 27, 2013 | P00001 | $0 | IGF::OT::IGF P904 MV-22 HANGAR&INFRASTRUCTURE AND P905 AIRCRAFT STAGING AREA, MCBH, HI, MOD TO INCOPORATE THE LATEST DBA WD AT NO COST TO THE GOVERNMENT |
| Dec 17, 2013 | 0 | $57.1M | IGF::OT::IGF FY13 P904 MV-22 HANGAR&INFRASTRUCTURE AND FY 13 P905 AIRCRAFT STAGING AREA |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.