N6274223C1329
CONTRACT N62742-23-C-1329, FY23 FHCON H-366, H-283, & H-375 REPLACE ANDERSEN HOUSING PHASE IV, V, & VI, NAVAL SUPPORT ACTIVITY ANDERSEN,GUAM
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | NAVFACSYSCOM MARIANAS |
| NAICS | 236116 — New Multifamily Housing Construction (except For-Sale Builders) |
| PSC | Y1FA — CONSTRUCTION OF FAMILY HOUSING FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $227.2M |
| Current contract value | $227.2M |
| Potential contract value / ceiling | $227.2M |
| Start date | Jul 28, 2023 |
| Current end date | Apr 14, 2027 |
| Potential end date | Apr 14, 2027 |
| Latest award activity | Jun 1, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 12 of 12 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 1, 2026 | P00011 | $8.9M | N62742-23-C-1329 H366, H283 AND H375 FY23 MCON REPLACE ANDERSEN HOUSING PHASE IV, V, AND VI NAVAL SUPPORT ACTIVITY ANDERSEN, GUAMPC 11 - ADDITIONAL DUPLEXESPC 13 - REPLACE SINKRFI 0185A.01 REPLACEMENT OF CLOSET 2 BI-FOLD DOOR D206 AND SINGLE LEAF |
| Jan 7, 2026 | P00010 | $96.2K | N62742-23-C-1329 H366, H283 AND H375 FY23 MCON REPLACE ANDERSEN HOUSING PHASE IV, V, AND VI NAVAL SUPPORT ACTIVITY ANDERSEN, GUAMP00010 -THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE PC12 SWITCHGEAR PROVISIONS |
| Dec 29, 2025 | P00009 | $0 | N62742-23-C-1329 H366, H283 AND H375 FY23 MCON REPLACE ANDERSEN HOUSING PHASE IV, V, AND VI NAVAL SUPPORT ACTIVITY ANDERSEN, GUAM P00009 -THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE PC09 PHASING PLAN REVISION AND PC10 EXTEND TURNOVER OF PH 1. |
| Jul 10, 2025 | A00008 | $31.3K | N62742-23-C-1329 H366, H283 AND H375 FY23 MCON REPLACE ANDERSEN HOUSING PHASE IV, V, AND VI NAVAL SUPPORT ACTIVITY ANDERSEN, GUAM P00008 -THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE PC08 GOVERNMENT FIBER OPTIC LINES |
| Mar 18, 2025 | P00007 | $0 | P00007: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FINAL DESIGN DRAWINGS AND SPECIFICATIONS. |
| Mar 10, 2025 | P00006 | $197.3K | PC06 PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY TO INSTALL AN ACCESS HOLE FOR INTERIOR TO EXTERIOR CABLE CONNECTION. |
| Feb 3, 2025 | P00005 | $254.6K | PROPOSED CHANGE (PC) 05: PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY TO RELOCATE RADON RISER AND FAN ASSEMBLY FROM ORIGINAL LOCATION AT THE MECHANICAL ROOMS TO THE EXTERIOR OF THE HOUSING UNITS. |
| Aug 6, 2024 | P00004 | $609.5K | P00004/PROPOSED CHANGE (PC) 04: PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY TO TRANSFER COMMISSIONING AGENT AND COMMISSIONING RESPONSIBILITY TO CONTRACTOR. |
| Aug 5, 2024 | P00003 | $228.3K | P00003/PROPOSED CHANGE (PC) 03: PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY TO CONDUCT SOIL SAMPLING AND ANALYSIS FROM 2-10 FT AT 0-0.5 FT BELOW GROUND SURFACE FOR THE REMAINING 62 FORMER HOUSING LOCATIONS. |
| Jul 18, 2024 | P00002 | $80.2K | P00002/PROPOSED CHANGE (PC) 01: PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY FOR TEN (10) VARIOUS DESIGN CHANGES |
| Jun 28, 2024 | P00001 | $9.4K | P00001/PROPOSED CHANGE (PC) 02: PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT NECESSARY FOR A BUILDING UNIT LOCATION SWAP. NOTE THAT THE UNIT QUANTITIES AND TYPE REMAINS THE SAME. |
| Jul 28, 2023 | 0 | $216.9M | CONTRACT N62742-23-C-1329, FY23 FHCON H-366, H-283, & H-375 REPLACE ANDERSEN HOUSING PHASE IV, V, & VI, NAVAL SUPPORT ACTIVITY ANDERSEN,GUAM |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2027-04-14 (171 days from calculation)
- +35 points
- 3 historical awards in this buyer and category group
- +10 points
- 12 recorded award transactions
- +10 points
- Latest award action: 2026-06-01
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.