Federal contract award
N6274223F4007
FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | NAVFACSYSCOM PACIFIC |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1ED — CONSTRUCTION OF SHIP CONSTRUCTION AND REPAIR FACILITIES |
| Parent award / vehicle | N6274222D1311 |
| Set-aside | Not reported |
| Pricing type | FIXED PRICE AWARD FEE |
| Obligations | $3.1B |
| Current contract value | $3.3B |
| Potential contract value / ceiling | $3.3B |
| Start date | Mar 31, 2023 |
| Current end date | Sep 30, 2027 |
| Potential end date | Sep 30, 2027 |
| Latest award activity | May 15, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 40 of 40 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 15, 2026 | P00038 | $884.8K | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PACIFIC. CTO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. HOOH AND FOOH SETTLEMENT. |
| Mar 27, 2026 | P00037 | $300.0M | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PACIFIC. CTO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. INCREMENTAL FUNDING. |
| Mar 12, 2026 | P00036 | $124.9K | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PACIFIC. CTO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. PCS 116, 117, 126, 127. |
| Mar 6, 2026 | P00035 | $68.9K | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. FUNDING ADMINISTRATIVE MODIFICATION. |
| Feb 20, 2026 | P00034 | $42.1K | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. INCORPORATE PCS 113, 115. |
| Feb 9, 2026 | P00033 | $-439.3K | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. |
| Jan 2, 2026 | P00032 | $918.7K | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. PCS 59, 81, 90, 109, 122. |
| Dec 9, 2025 | P00031 | $0 | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. PC 130. |
| Nov 28, 2025 | P00030 | $257.9K | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. PCS 32 AND 78. |
| Oct 30, 2025 | P00029 | $-2.6M | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. PCS 46, 49, 80, 87, 108, 125. |
| Oct 28, 2025 | P00028 | $5.6M | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. PC 00001 AND 00055 GOVERNMENT POSITION |
| Oct 8, 2025 | P00027 | $50.0M | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. INCREMENTAL FUNDING. |
| Sep 23, 2025 | P00026 | $326.9K | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. INCORPORATE PCS 82, 94, 100. |
| Sep 9, 2025 | P00025 | $139.0K | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. INCORPORATE NO-COST AND FUNDED PCS. |
| Jul 31, 2025 | P00024 | $2.0M | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. INCORPORATE NO-COST AND FUNDED PCS. |
| Jul 24, 2025 | P00023 | $11.2M | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. INCORPORATE PC 00047 MARINE RAILWAY. |
| Jul 10, 2025 | P00022 | $850.0M | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR THE SHIPYARD INFRASTRUCTURE TO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HAWAII. MOD P00022 FY25 INCREMENTAL FUNDING. |
| Apr 25, 2025 | P00021 | $272.1K | CONTRACT NO. N62742-22-D-1311, FOR THE SIOP AT HAWAII, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PACIFIC CTO N6274223F4007, FY23 MCON PROJECT P-209, DD3 REPLACEMENT, JBPHH INCORPORATE EPA AND PC41,45,51,67,69,72,73,84,86 |
| Apr 18, 2025 | P00020 | $0 | CONTRACT NO. N62742-22-D-1311, FOR THE SIOP AT HAWAII, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PACIFIC CTO N6274223F4007, FY23 MCON PROJECT P-209, DD3 REPLACEMENT, JBPHH INCORPORATE PC 00075 |
| Apr 1, 2025 | P00019 | $300.0M | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR THE SIOP AT HI, WA, AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC INCREMENTAL FUNDING MOD $300,000,000.00 |
| Mar 18, 2025 | P00018 | $300.0M | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR THE SIOP AT HI, WA, AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC CTO N6274223F4007, FY23 MCON PROJECT P-209, DD3 REPLACEMENT, JBPHH INCREMENTAL FUNDING $300,000,000.00 |
| Feb 28, 2025 | P00017 | $0 | CONTRACT NO. N62742-22-D-1311, FOR THE SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC CTO N6274223F4007, FY23 MCON PROJECT P-209, DD3 REPLACEMENT, JBPHH INCORPORATE PROPOSED CHANGES (PC) 00001, 00055, 00076 AND 00077 |
| Feb 20, 2025 | P00016 | $469.6K | CONTRACT NO. N62742-22-D-1311, FOR THE SIOP AT HAWAII, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC CTO N6274223F4007, FY23 MCON PROJECT P-209, DD3 REPLACEMENT, JBPHH INCORPORATE PCS 13 19 38 53 63 65 74 |
| Jan 7, 2025 | P00015 | $219.4K | CONTRACT NO. N62742-22-D-1311, FOR THE SIOP AT HAWAII, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC CTO N6274223F4007, FY23 MCON PROJECT P-209, DD3 REPLACEMENT, JBPHH INCORPORATE PC 024 AND 050 |
| Sep 30, 2024 | P00014 | $384.6K | CONTRACT NO. N62742-22-D-1311, FOR THE SIOP AT HAWAII, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC CTO N6274223F4007, FY23 MCON PROJECT P-209, DD3 REPLACEMENT, JBPHH INCORPORATE PROPOSED CHANGE (PC) 00020, 00040 AND 00044 |
| Sep 12, 2024 | P00013 | $43.8K | N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR THE SIOP AT HAWAII, WASHINGTON AND OTHER NAVFAC PAC AOR N6274223F4007, FY23 MCON PROJECT P-209, DD3 REPLACEMENT, JBPHH. EXECUTE PC 21, 43, AND 52 |
| Jul 29, 2024 | P00012 | $0 | FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM HAWAII - INCORPORATE AWARD FEE PLAN REVISION 5 DATED 23 JULY 2024, SUPERSEDING PREVIOUS REVISION 4 |
| Jul 10, 2024 | P00011 | $744.3K | CTO N6274223F4007 FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HAWAII THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE PROPOSED CHANGE (PC) 00002, 00010 PART A, 00014, 00017, 00018, AND 00037.  |
| Jun 13, 2024 | P00009 | $161.9K | CTO N6274223F4007, FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JBPHH, HI. EXECUTE PC00009 AND PC00027 REQUIREMENTS FOR SCADA LOGIC REVISIONS AND GREEN WASTE DISPOSAL EFFORTS. |
| Jun 13, 2024 | P00010 | $412.0M | CONTRACT NO. N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR THE SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PACIFIC N6274223F4007, FY23 MCON PROJECT P-209, DD3 REPLACEMENT, JBPHH, HAWAII. INCREMENTAL FUNDING MODIFICATION |
| Jun 10, 2024 | P00008 | $3.1M | CONTRACT N62742-22-D-1311, WATERFRONT MACC PRIMARILY FOR THE SIOP AT HI, WA AND OTHER AREAS UNDER THE COGNIZANCE OF NAVFAC PAC CTO N6274223F4007, FY23 MCON P-209, DD3, REPLACEMENT, JBPHH, HI AWARD FEE PHASE A FUNDING MODIFICATION. |
| May 7, 2024 | A00001 | $0 | FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII - INCORPORATE PCS 22, 28, 30, 33, 34. |
| Mar 12, 2024 | P00007 | $344.0M | FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII MOD P00007 - FY24 INCREMENTAL FUNDING |
| Mar 6, 2024 | P00006 | $30.0M | FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT,JBPHH, HI MOD P00006 - OPTION ITEM |
| Mar 5, 2024 | P00005 | $0 | FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII - AWARD FEE PLAN REV 3 REPLACEMENT TO REV 4 |
| Dec 13, 2023 | P00004 | $0 | FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII - INCORPORATE 4 NEW SLINS (BR, BS, BT, BU) |
| Nov 20, 2023 | P00003 | $0 | FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII - INCORPORATE PCS 4,6, 15, AND 16. |
| Oct 3, 2023 | P00002 | $0 | FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII - INCORPORATE KTR RELEASE FOR BENEFICIAL REUSE OF GOVERNMENT PROPERTY, UPDATE 52.222-8, ADD 52.216-4 AND 252.217-7027 |
| Jul 12, 2023 | P00001 | $0 | FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII - INCORPORATE PCS 5, 7, 8, 11, 12, EMPHASIZE FAR 52.211-15, AND UPDATE WAWF TABLE |
| Mar 10, 2023 | 0 | $463.0M | FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII |
Estimated positioning window
Nov 1, 2026 – Mar 30, 2027
85/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 85/100. Available recorded signals: 80 points.
- Contract end 2027-09-30 (333 days from calculation)
- +35 points
- 6 historical awards in this buyer and category group
- +15 points
- 40 recorded award transactions
- +10 points
- Latest award action: 2026-05-15
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.