Federal contract award

N6339422C0003

MK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeCOMMANDING OFFICER
NAICS334519 — Other Measuring and Controlling Device Manufacturing
PSC5999 — Miscellaneous Electrical and Electronic Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$47.2M
Current contract value$47.2M
Potential contract value / ceiling$47.2M
Start dateJun 3, 2022
Current end dateMar 19, 2027
Potential end dateMar 17, 2028
Latest award activityJun 11, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 52 of 52 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 11, 2026P00025$0MK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Jun 11, 2026P00025$0MK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Mar 18, 2026P00024$0MK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Mar 18, 2026P00024$0MK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Jan 9, 2026P00023$0MK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Jan 9, 2026P00023$0MK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Sep 30, 2025P00022$10.8MMK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Sep 30, 2025P00022$8.6MMK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Jul 3, 2025P00021$0MK 41 VERTICAL LAUNCHING SYSTEM LAUNCH CONTROL UNIT (LCU)MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE, ONBOARD REPAIR PART, INSTALLATION & CHECKOUT COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 & MOD 11.
Jul 3, 2025P00021$0MK 41 VERTICAL LAUNCHING SYSTEM LAUNCH CONTROL UNIT (LCU)MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE, ONBOARD REPAIR PART, INSTALLATION & CHECKOUT COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 & MOD 11.
Jun 23, 2025P00020$0MK 41 VERTICAL LAUNCHING SYSTEM LAUNCH CONTROL UNIT (LCU)MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE, ONBOARD REPAIR PART, INSTALLATION & CHECKOUT COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 & MOD 11.
Jun 23, 2025P00020$0MK 41 VERTICAL LAUNCHING SYSTEM LAUNCH CONTROL UNIT (LCU)MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE, ONBOARD REPAIR PART, INSTALLATION & CHECKOUT COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 & MOD 11.
Mar 27, 2025P00019$0MK 41 VERTICAL LAUNCHING SYSTEM LAUNCH CONTROL UNIT (LCU)MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE, ONBOARD REPAIR PART, INSTALLATION & CHECKOUT COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 & MOD 11.
Mar 27, 2025P00019$0MK 41 VERTICAL LAUNCHING SYSTEM LAUNCH CONTROL UNIT (LCU)MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE, ONBOARD REPAIR PART, INSTALLATION & CHECKOUT COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 & MOD 11.
Feb 12, 2025P00018$0MK 41 VERTICAL LAUNCHING SYSTEM LAUNCH CONTROL UNIT (LCU)MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE, ONBOARD REPAIR PART, INSTALLATION & CHECKOUT COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 & MOD 11.
Feb 12, 2025P00018$0MK 41 VERTICAL LAUNCHING SYSTEM LAUNCH CONTROL UNIT (LCU)MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE, ONBOARD REPAIR PART, INSTALLATION & CHECKOUT COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 & MOD 11.
Dec 17, 2024P00017$0MK 41 VERTICAL LAUNCHING SYSTEM LAUNCH CONTROL UNIT (LCU)MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE, ONBOARD REPAIR PART, INSTALLATION & CHECKOUT COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 & MOD 11.
Dec 17, 2024P00017$0MK 41 VERTICAL LAUNCHING SYSTEM LAUNCH CONTROL UNIT (LCU)MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE, ONBOARD REPAIR PART, INSTALLATION & CHECKOUT COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 & MOD 11.
Nov 14, 2024P00016$0MK 41 VLS LAUNCH CONTROL UNIT (LCU) MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP),INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235.
Nov 14, 2024P00016$0MK 41 VLS LAUNCH CONTROL UNIT (LCU) MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP),INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235.
Oct 10, 2024P00015$0VERTICAL LAUNCHING SYSTEM LAUNCH CONTROL UNIT (LCU). REMOVING AIRFLOW SENSOR FROM J-1 SOW ENCLOSURE.
Oct 10, 2024P00015$0VERTICAL LAUNCHING SYSTEM LAUNCH CONTROL UNIT (LCU). REMOVING AIRFLOW SENSOR FROM J-1 SOW ENCLOSURE.
Sep 6, 2024P00014$1.5MVERTICAL LAUNCHING SYSTEM (VLS) LAUNCH CONTROL UNIT (LCU)-CLINS 7100, 7200, 7300, & 7400 HAVE BEEN ADDED TO SETTLE REA 16050.
Sep 6, 2024P00014$0VERTICAL LAUNCHING SYSTEM (VLS)LAUNCH CONTROL UNIT (LCU)-CLINS 7100, 7200, 7300, & 7400 HAVE BEEN ADDED TO SETTLE REA 16050.
Jun 28, 2024P00013$10.9MMANUFACTURE, ASSEMBLY, TEST, AND DELIVERY OF VERTICAL LAUNCHING SYSTEM LAUNCH CONTROL UNIT (LCU) MK 235 MOD 17, MOD 18, AND THE MANUFACTURE OF ASSOCIATED COMPONENTS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12, AND MOD 11.
Jun 28, 2024P00013$8.1MMANUFACTURE, ASSEMBLY, TEST, AND DELIVERY OF VERTICAL LAUNCHING SYSTEM LAUNCH CONTROL UNIT (LCU) MK 235 MOD 17, MOD 18, AND THE MANUFACTURE OF ASSOCIATED COMPONENTS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12, AND MOD 11.
Jun 21, 2024P00012$0MANUFACTURING OF MK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE, ONBOARD REPAIR PART, INSTALLATION AND CHECKOUT COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Jun 21, 2024P00012$0MANUFACTURING OF MK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE, ONBOARD REPAIR PART, INSTALLATION AND CHECKOUT COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Feb 2, 2024P00011$0UPDATE THE DELIVERY SCHEDULE FOR CLINS/SLINS 3000AA, 3000AB, 3000AC, 3000AD, 3000AE, 3000AF, 3000AG, & 3000AH.
Feb 2, 2024P00011$0UPDATE THE DELIVERY SCHEDULE FOR CLINS/SLINS 3000AA, 3000AB, 3000AC, 3000AD, 3000AE, 3000AF, 3000AG, & 3000AH.
Jan 10, 2024P00010$0CHANGE OF CONTRACTS SPECIALIST.
Jan 10, 2024P00010$0CHANGE OF CONTRACTS SPECIALIST.
Dec 14, 2023P00009$0UPDATE THE J-1 SOW ENCLOSURE TO INCLUDE ALTERNATIVE CARD CAGE ASSEMBLY PART NUMBER 7572004-19. THE UPDATED SOW ENCLOSURE IS DATED 5 DECEMBER 2023. UPDATE THE CONTRACT SPECIALIST.
Dec 14, 2023P00009$0UPDATE THE J-1 SOW ENCLOSURE TO INCLUDE ALTERNATIVE CARD CAGE ASSEMBLY PART NUMBER 7572004-19. THE UPDATED SOW ENCLOSURE IS DATED 5 DECEMBER 2023. UPDATE THE CONTRACT SPECIALIST.
Nov 8, 2023P00008$0AUTHORIZE SHIP IN PLACE AND EXTEND DELIVERY SCHEDULE FOR SLINS CLINS 1000AA-1000AE, 3000AA-3000AE, 4000AA-4000AH, AND 5000AA-5000AG. UPDATE ATTACHMENT J-1. UPDATE CONTRACTOR POC.
Nov 8, 2023P00008$0AUTHORIZE SHIP IN PLACE AND EXTEND DELIVERY SCHEDULE FOR SLINS CLINS 1000AA-1000AE, 3000AA-3000AE, 4000AA-4000AH, AND 5000AA-5000AG. UPDATE ATTACHMENT J-1. UPDATE CONTRACTOR POC.
Oct 16, 2023P00007$0UPDATE THE SURVEILLANCE CRITICALITY DESIGNATION (SCD) FROM C TO A.UPDATE THE CONTRACT SPECIALIST AND ADMINISTRATIVE CONTRACTING OFFICER (ACO).
Oct 16, 2023P00007$0UPDATE THE SURVEILLANCE CRITICALITY DESIGNATION (SCD) FROM C TO A. UPDATE THE CONTRACT SPECIALIST AND ADMINISTRATIVE CONTRACTING OFFICER (ACO).
Sep 29, 2023P00006$0ADD CLAUSE D-247-H002 PACKAGING OF SUPPLIES-BASIC (NAVSEA) (DEC 2020) AND UPDATE THE ITEM NUMBER UNDER D-247-H003 PACKAGING OF SUPPLIES-ALTERNATIVE I (NAVSEA) (AUG 2019).
Sep 29, 2023P00006$0ADD CLAUSE D-247-H002 PACKAGING OF SUPPLIES-BASIC (NAVSEA) (DEC 2020) AND UPDATE THE ITEM NUMBER UNDER D-247-H003 PACKAGING OF SUPPLIES-ALTERNATIVE I (NAVSEA) (AUG 2019).
Sep 20, 2023P00005$13.6MEXERCISE OPTION CLINS 1100, 2100, 3100, 4100, 5100, AND 6100 IN ACCORDANCE WITH SECTION I CLAUSE 52.217-7 VAR I.
Sep 20, 2023P00005$4.7MEXERCISE OPTION CLINS 1100, 2100, 3100, 4100, 5100, AND 6100 IN ACCORDANCE WITH SECTION I CLAUSE 52.217-7 VAR I.
Sep 8, 2023P00004$0MK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Sep 8, 2023P00004$0MK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Jun 9, 2023P00003$0MK 41 VLS LCU MK 235 MOD 17, MOD 18, AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12, AND MOD 11
Jun 9, 2023P00003$0MK 41 VLS LCU MK 235 MOD 17, MOD 18, AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12, AND MOD 11.
Aug 16, 2022P00002$0MK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Aug 16, 2022P00002$0MK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Jul 15, 2022P00001$395.4KMK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Jul 15, 2022P00001$0MK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Jun 3, 20220$7.2MMK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.
Jun 3, 20220$4.8MMK 41 VLS LCU MK 235 MOD 17, MOD 18 AND ASSOCIATED MAINTENANCE ASSISTANCE MODULE (MAM), ONBOARD REPAIR PART (OBRP), INSTALLATION AND CHECKOUT (INCO) COMPONENTS KITS FOR LCU MK 235 MOD 17, MOD 18, MOD 15, MOD 12 AND MOD 11.

Estimated positioning window

Mar 17, 2027 – Sep 17, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2028-03-17 (509 days from calculation)
+25 points
9 historical awards in this buyer and category group
+15 points
52 recorded award transactions
+10 points
Latest award action: 2026-06-11
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.