Federal contract award

N6339422C0008

THE GOVERNMENT REQUIRES MANUFACTURE, ASSEMBLY, TEST AND DELIVERY OF VLS MCP, STATUS PANEL, ASSOCIATED MAM KIT, OBRP KIT, INCO SPARES KIT, DEPOT SPARES KIT, AND LRU KIT.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeCOMMANDING OFFICER
NAICS334519 — Other Measuring and Controlling Device Manufacturing
PSC5999 — Miscellaneous Electrical and Electronic Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$82.0M
Current contract value$82.0M
Potential contract value / ceiling$86.7M
Start dateSep 30, 2022
Current end dateDec 31, 2029
Potential end dateDec 31, 2030
Latest award activityMay 22, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 40 of 40 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 9, 2026P00019$5.3MFABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Jun 9, 2026P00019$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
May 22, 2026P00018$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
May 22, 2026P00018$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Apr 30, 2026P00017$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Apr 30, 2026P00017$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Apr 6, 2026P00016$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Apr 6, 2026P00016$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Jan 5, 2026P00015$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Jan 5, 2026P00015$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Dec 15, 2025P00014$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Dec 15, 2025P00014$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Sep 30, 2025P00013$3.6MFABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Sep 30, 2025P00013$13.2MFABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Aug 21, 2025P00012$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Aug 21, 2025P00012$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
May 29, 2025P00011$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
May 29, 2025P00011$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
May 8, 2025P00010$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
May 8, 2025P00010$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Apr 16, 2025P00009$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Apr 16, 2025P00009$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Feb 25, 2025P00008$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Feb 25, 2025P00008$0FABRICATE, ASSEMBLE AND DELIVER MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) AND ASSOCIATED COMPONENTS.
Oct 1, 2024P00007$0MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) - OY1, ACCEPTANCE UPDATE IN SECTION E.
Oct 1, 2024P00007$0MK 448 VERTICAL LAUNCH SYSTEM MOTOR CONTROL PANEL (VLS MCP) - OY1, ACCEPTANCE UPDATE IN SECTION E.
Aug 16, 2024P00006$7.4MVERTICAL LAUNCHING SYSTEM (VLS) MOTOR CONTROL PANEL (MCP) OPTION YEAR 2 EXERCISE.
Aug 16, 2024P00006$18.3MVERTICAL LAUNCHING SYSTEM (VLS) MOTOR CONTROL PANEL (MCP) OPTION YEAR 2 EXERCISE.
Jul 30, 2024P00005$0VERTICAL LAUNCHING SYSTEM (VLS) MOTOR CONTROL PANEL (MCP) SECTION E INSPECTION/ACCEPTANCE UPDATED TO ORIGIN FROM DESTINATION.
Jul 30, 2024P00005$0VERTICAL LAUNCHING SYSTEM (VLS) MOTOR CONTROL PANEL (MCP) SECTION E INSPECTION/ACCEPTANCE UPDATED TO ORIGIN FROM DESTINATION.
Apr 23, 2024P00004$8.3MVERTICAL LAUNCHING SYSTEMS (VLS) MOTOR CONTROL PANEL (MCP) MANUFACTURE, ASSEMBLY AND TESTING.
Apr 23, 2024P00004$9.5MVERTICAL LAUNCHING SYSTEMS (VLS) MOTOR CONTROL PANEL (MCP) MANUFACTURE, ASSEMBLY AND TESTING.
Oct 31, 2023P00003$0SPAIN MCP-SP DEPOT SPARES - OY1
Oct 31, 2023P00003$0USN DDG SHIPSET MCP - BY
Sep 27, 2023P00002$888.6KSPAIN MCP-SP DEPOT SPARES - OY1
Sep 27, 2023P00002$0USN DDG SHIPSET MCP - OY1
Sep 25, 2023P00001$0SPAIN MCP-SP DEPOT SPARES - BY
Sep 25, 2023P00001$0USN DDG SHIPSET MCP - BY
Sep 29, 20220$4.1MTHE GOVERNMENT REQUIRES MANUFACTURE, ASSEMBLY, TEST AND DELIVERY OF VLS MCP, STATUS PANEL, ASSOCIATED MAM KIT, OBRP KIT, INCO SPARES KIT, DEPOT SPARES KIT, AND LRU KIT.
Sep 29, 20220$11.8MTHE GOVERNMENT REQUIRES MANUFACTURE, ASSEMBLY, TEST AND DELIVERY OF VLS MCP, STATUS PANEL, ASSOCIATED MAM KIT, OBRP KIT, INCO SPARES KIT, DEPOT SPARES KIT, AND LRU KIT.

Estimated positioning window

Dec 31, 2029 – Jun 30, 2030

Recompete signal:
50/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 50/100. Available recorded signals: 45 points.

Contract end 2030-12-31 (1528 days from calculation)
+5 points
9 historical awards in this buyer and category group
+15 points
40 recorded award transactions
+10 points
Latest award action: 2026-05-22
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.