Federal contract award

N6339423C0006

AUSTRALIA SHIPSET 2 PPS

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeCOMMANDING OFFICER
NAICS334519 — Other Measuring and Controlling Device Manufacturing
PSC5999 — Miscellaneous Electrical and Electronic Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$104.5M
Current contract value$104.5M
Potential contract value / ceiling$113.0M
Start dateMar 29, 2023
Current end dateJul 31, 2027
Potential end dateNov 17, 2029
Latest award activityApr 24, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 24 of 24 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 24, 2026P00011$0MANUFACTURE, ASSEMBLY, TEST AND DELIVERY OF MK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS).
Apr 24, 2026P00011$0MANUFACTURE, ASSEMBLY, TEST AND DELIVERY OF MK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS).
Dec 15, 2025P00010$0MANUFACTURE, ASSEMBLY, TEST AND DELIVERY OF MK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS).
Dec 15, 2025P00010$0MANUFACTURE, ASSEMBLY, TEST AND DELIVERY OF MK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS).
Nov 14, 2025P00009$0MK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS).
Nov 14, 2025P00009$0MK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS).
Jul 9, 2025P00008$1.3MMK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS).
Jul 9, 2025P00008$25.3MMK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS).
Jun 12, 2025P00007$0MK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS).
Jun 12, 2025P00007$0MK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS).
Mar 31, 2025P00006$0MANUFACTURE, ASSEMBLY, TEST AND DELIVERY MK 179 PROGRAMMABLE POWER SUPPLY
Mar 31, 2025P00006$0MANUFACTURE, ASSEMBLY, TEST AND DELIVERY MK 179 PROGRAMMABLE POWER SUPPLY
Nov 6, 2024P00005$0MK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS), UPDATING DELIVERY SCHEDULE
Nov 6, 2024P00005$0MK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS), UPDATING DELIVERY SCHEDULE
May 8, 2024P00004$0MK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS), UPDATING DELIVERY SCHEDULE
May 8, 2024P00004$0MK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS), UPDATING DELIVERY SCHEDULE
May 1, 2024P00003$7.5MMK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS), EXERCISING OPTION YEAR 1.
May 1, 2024P00003$11.4MMK 179 VERTICAL LAUNCHING SYSTEM (VLS) PROGRAMMABLE POWER SUPPLY (PPS), EXERCISING OPTION YEAR 1.
Mar 27, 2024P00002$0VLS PROGRAMMABLE POWER SUPPLY (PPS). THE PURPOSE OF THIS MOD IS ADMINISTRATIVE CHANGE.
Mar 27, 2024P00002$0VLS PROGRAMMABLE POWER SUPPLY (PPS). THE PURPOSE OF THIS MODIFICATION IS ADMINISTRATIVE CHANGE.
Sep 15, 2023P00001$0AUSTRALIA SHIPSET 2 PPS
Sep 15, 2023P00001$0MK 179 PPS USN DDG SHIPSET 1
Mar 29, 20230$1.3MAUSTRALIA SHIPSET 2 PPS
Mar 29, 20230$8.0MMK 179 PPS USN DDG SHIPSET 1

Estimated positioning window

Nov 17, 2028 – May 17, 2029

Recompete signal:
50/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 50/100. Available recorded signals: 45 points.

Contract end 2029-11-17 (1119 days from calculation)
+5 points
9 historical awards in this buyer and category group
+15 points
24 recorded award transactions
+10 points
Latest award action: 2026-04-24
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.