Federal contract award

N6449825P2023

NSWCPD LBES REQUIRES REPLACEMENT OF TWENTY-FOUR (24) SEALED-LEAD ACID BATTERIES IN EACH OF FOUR (4) EXCELITAS BATTERY ASSEMBLIES (63A16026P2) WITH NEW BATTERIES (HAWK 0820-004 CYCLON BC CELLS).

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNSWC PHILADELPHIA DIV
NAICS811210 — Electronic and Precision Equipment Repair and Maintenance
PSCJ061 — Maintenance, Repair and Rebuilding of Equipment: Electric Wire, and Power and Distribution Equipment
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$22.4K
Current contract value$22.4K
Potential contract value / ceiling$22.4K
Start dateMay 8, 2025
Current end dateMay 12, 2026
Potential end dateMay 12, 2026
Latest award activityApr 13, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 13, 2026P00003$0NSWCPD LBES REQUIRES REPLACEMENT OF TWENTY-FOUR (24) SEALED-LEAD ACID BATTERIES IN EACH OF FOUR (4) EXCELITAS BATTERY ASSEMBLIES (63A16026P2) WITH NEW BATTERIES (HAWK 0820-004 CYCLON BC CELLS).
Feb 12, 2026P00002$1.4KNSWCPD LBES REQUIRES REPLACEMENT OF TWENTY-FOUR (24) SEALED-LEAD ACID BATTERIES IN EACH OF FOUR (4) EXCELITAS BATTERY ASSEMBLIES (63A16026P2) WITH NEW BATTERIES (HAWK 0820-004 CYCLON BC CELLS).
Dec 23, 2025P00001$-7.0KNSWCPD LBES REQUIRES REPLACEMENT OF TWENTY-FOUR (24) SEALED-LEAD ACID BATTERIES IN EACH OF FOUR (4) EXCELITAS BATTERY ASSEMBLIES (63A16026P2) WITH NEW BATTERIES (HAWK 0820-004 CYCLON BC CELLS).
May 8, 20250$28.0KNSWCPD LBES REQUIRES REPLACEMENT OF TWENTY-FOUR (24) SEALED-LEAD ACID BATTERIES IN EACH OF FOUR (4) EXCELITAS BATTERY ASSEMBLIES (63A16026P2) WITH NEW BATTERIES (HAWK 0820-004 CYCLON BC CELLS).

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.