Federal contract award

N6523624F3027

VEHICULAR TECHNOLOGY TRANSITION (VTT) INTEGRATED PRODUCT TEAM (IPT) SYSTEMS ENGINEERING, INTEGRATION, & LIMITED PRODUCTION

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNIWC ATLANTIC
NAICS541330 — Engineering Services
PSCR425 — Engineering and Technical Services
Parent award / vehicleN0017819D7699
Set-asideSERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Pricing typeCOST PLUS FIXED FEE
Obligations$31.9M
Current contract value$48.1M
Potential contract value / ceiling$79.7M
Start dateJun 25, 2024
Current end dateJun 24, 2026
Potential end dateJun 24, 2029
Latest award activityApr 29, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 12 of 12 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 29, 2026P00014$496.9KVEHICULAR TECHNOLOGY TRANSITION (VTT) INTEGRATED PRODUCT TEAM (IPT) SYSTEMS ENGINEERING, INTEGRATION, AND LIMITED PRODUCTION
Mar 23, 2026P00013$0THIS MODIFICATION IS ISSUED TO MAKE ADMINISTRATIVE CORRECTIONS IN ORDER TO FACILITATE MIGRATION OF THIS DOCUMENT FROM SEAPORT TO THE EPS WRITING SYSTEM.
Jan 23, 2026P00012$0VEHICULAR TECHNOLOGY TRANSITION (VTT) INTEGRATED PRODUCT TEAM (IPT) SYSTEMS ENGINEERING, INTEGRATION, & LIMITED PRODUCTION
Jan 22, 2026P00011$3.1MVEHICULAR TECHNOLOGY TRANSITION (VTT) INTEGRATED PRODUCT TEAM (IPT) SYSTEMS ENGINEERING, INTEGRATION, & LIMITED PRODUCTION
Dec 3, 2025P00010$604.4KVEHICULAR TECHNOLOGY TRANSITION (VTT) INTEGRATED PRODUCT TEAM (IPT) SYSTEMS ENGINEERING, INTEGRATION, & LIMITED PRODUCTION
Sep 11, 2025P00009$4.6MVEHICULAR TECHNOLOGY TRANSITION (VTT) INTEGRATED PRODUCT TEAM (IPT) SYSTEMS ENGINEERING, INTEGRATION, & LIMITED PRODUCTION
Jul 21, 2025P00008$0VEHICULAR TECHNOLOGY TRANSITION (VTT) INTEGRATED PRODUCT TEAM (IPT) SYSTEMS ENGINEERING, INTEGRATION, & LIMITED PRODUCTION
Jun 24, 2025P00007$3.4MVTT IPT SYSTEMS ENGINEERING, INTEGRATION, & LIMITED PRODUCTION EXERCISE OPTION YEAR 1
May 15, 2025P00006$967.3KVEHICULAR TECHNOLOGY TRANSITION (VTT) INTEGRATED PRODUCT TEAM (IPT) SYSTEMS ENGINEERING, INTEGRATION, & LIMITED PRODUCTION
Apr 1, 2025P00005$1.5MVEHICULAR TECHNOLOGY TRANSITION (VTT) INTEGRATED PRODUCT TEAM (IPT) SYSTEMS ENGINEERING, INTEGRATION, & LIMITED PRODUCTION
Nov 27, 2024P00004$2.1MVEHICULAR TECHNOLOGY TRANSITION (VTT) INTEGRATED PRODUCT TEAM (IPT) SYSTEMS ENGINEERING, INTEGRATION, & LIMITED PRODUCTION
Oct 4, 2024P00003$0THIS MODIFICATION IS TO ADD AN APPROVED SUBCONTRACTOR TO THE TASK ORDER.

Estimated positioning window

Jun 24, 2028 – Dec 24, 2028

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2029-06-24 (973 days from calculation)
+15 points
330 historical awards in this buyer and category group
+15 points
12 recorded award transactions
+10 points
Latest award action: 2026-04-29
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  4. Check the stated set-aside against the solicitation and current certifications.
  5. Review the award scope and buyer evidence before making a bid/no-bid decision.