AgencyDepartment of Defense
OfficeNIWC PACIFIC
NAICS541330 — Engineering Services
PSC7G21 — Digital network communications hardware, software, and other equipment used within the core data centers and work areas, connecting end users to the organization's Local Area Network (LAN). Wide Area Network (WAN) digital transmission equipment, supporting hardware and software directly connecting data centers, offices and third parties. Includes 1) external digital network transport equipment (Outside Plant) physical communications infrastructure connecting to LAN/WAN end points 2) copper and fiber communications systems, and 3) cellular infrastructure such as towers, repeaters, switching systems dedicated for cellular communication. Products and tools that enable or distribute voice services through on-premise digital equipment including PBX, VoIP, voicemail and handsets.
Parent award / vehicleN6600118D0075
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$22.1K
Current contract value$22.1K
Potential contract value / ceiling$22.1K
Start dateNov 25, 2022
Current end dateOct 30, 2023
Potential end dateOct 30, 2023
Latest award activityAug 2, 2023
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 2, 2023P00004$0PWS REV 4, EXTEND THE POP
May 22, 2023P00003$0PRODUCTION SUPPORT, POST-PRODUCTION MODIFICATIONS (PPMS) FOR THE END OF LIFE SWITCH MODULE REPLACEMENT FOR CVN-80
Apr 26, 2023P00002$0PRODUCTION SUPPORT, POST-PRODUCTION MODIFICATIONS (PPMS) FOR THE END OF LIFE SWITCH MODULE REPLACEMENT FOR CVN-80
Dec 22, 2022P00001$0PWS REV 1, POP EXTENSION
Nov 23, 20220$22.1KPRODUCTION SUPPORT, POST-PRODUCTION MODIFICATIONS (PPMS) FOR THE END OF LIFE SWITCH MODULE REPLACEMENT FOR CVN-80