Federal contract award

N6945008C0052

NAS CORPUS CHRISTI/NAS KINGSVILLE ELECTRIC UTILITIES PRIVATIZATION CONTRACT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM SOUTHEAST
NAICS561210 — Facilities Support Services
PSCS112 — Electric Services
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE REDETERMINATION
Obligations$1.5M
Current contract value$165.4M
Potential contract value / ceiling$165.4M
Start dateMar 17, 2008
Current end dateMar 16, 2058
Potential end dateMar 16, 2058
Latest award activityApr 15, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 34 of 34 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 15, 2026P00033$131.7KTHE PURPOSE OF THIS MODIFICATION IS TO INSTALL A NEW TRANSFORMER IN BUILDING 3788 AT NAS KINGSVILLE, TX.
Feb 4, 2026P00032$0DUE TO A CONTRACT WRITING SYSTEM MIGRATION ERROR, SECTION C HAS BEEN INCLUDED IN FULL TEXT.
Jun 12, 2025P00031$16.8KINSTALL CROSSWALK LIGHTS B1734
May 13, 2025P00030$0CORRECT ADDRESS ON CAR
Mar 10, 2025P00029$0THE PURPOSE OF THE MODIFICATION IS TO ACCEPT NUECES PROPOSAL SUBMITTED TO THE GOVERNMENT ON JANUARY 30, 2020 TO FORGO PAYMENT OF ANY PRIOR BILLING ISSUES FOR YEARS 2016, 2017, 2018, 2019, 2020 OF THE NAS CORPUS AND NAS KINGSVILLE UP CONTRACT. ALL OTHER TERMS AND CONDITIONS DETERMINATION
Sep 14, 2023P00028$26.8K53.243THE PURPOSE FOR THE MODIFICATION IS FOR CONTRACTOR TO REMOVE EXISTING MAIN ELECTRICAL SERVICE THAT PROVIDES SERVICES TO B-5703.
Feb 9, 2023P00027$0PRICE SUMMARY FOR CLINS 0002/0005/0006
May 25, 2021P00026$1.8KPRICE SUMMARY FOR CLINS 0002/0005/0006
Sep 30, 2020P00025$6.7KPRICE SUMMARY FOR CLINS 0008
Jul 3, 2018P00024$51.2KADD CCAD TO BUILDING 1808
Dec 11, 2015P00023$378.3KFACILITIES CHARGE - REALIGN INCOMING AEP 15KV ELECTRICA FEEDER NAS CORPUS CHRISTI TX.
Aug 20, 2015P00022$159.5KFACILITIES CHARGE - CONVERT EXISTING STREET LIGHT CIRCUIT
Feb 25, 2014P00020$102.5KIGF::OT::OGF FACILITIES CHARGE - INSTALL 7 AMI METERS AT BUILDING 33
Feb 25, 2014P00021$72.9KIGF::OT:IGF FACILITIES CHARGE - INSTALL 5 AMI METERS AT BUILDING 33
Jan 31, 2014P00019$0ELECTRIC UTILITY PRIVATIZATION FOR CORPUS CHRISTI AND KINGSVILLE TX FIRST PRICE REDETERMINATION
Sep 30, 2013P00018$37.0KFACILITIES CHARGE; REPLACEMENT OF TRANSFORMER AT BUILDING 8
Sep 16, 2013P00017$98.5KREPLACEMENT OF TRANSFORMER AT BUILDING 10, NAS CORPUS CHRISTI
Aug 8, 2012P00016$36.1KREPLACE BLDG 127 TRANSFORMER
Aug 6, 2012P00015$15.1KPROVIDE ELECTRICAL POWER TO CONSOLIDATED CLUB FACILITY AT NAS CORPUS CHRISTI, TEXAS
Jun 6, 2012P00014$-0THE PURPOSE OF THIS MODIFICATION IS TO DEDUCT $0.04 IN UNUSED FUNDS FROM P00005 WHICH REDIRECTEDD POWER TO BLDG 4777 AND ISOLATE FROM BLDG 760 TRANSFORMER.
Feb 16, 2012P00013$0ADMINISTRATIVE MODIFICATION
Feb 6, 2012P00012$8.2KNON-ROUTINE SERVICE CHARGE: SCOPE OF WORK FOR AVIAN RADER THE FOLLOWING WORK IS TO BE PERFORMED BY NUECES ELECTRIC COOPERATIVE. INSTALL OIL-FILLED, SINGLE PHASE 7200 V PRIMARY, 120/240 V SECONDARY, 50 KVA, PAD MOUNTED TRANSFORMER AND HIGH VOLTAGE SELECTION SWITCH AT SITE A. POWER SOURCE SHALL BE FROM SITE A TO AIRFIELD LIGHT VAULT LOCATED AT BUILDING 2738. INSTALLATION SHALL INCLUDE NECESSARY CONDUIT, FITTINGS, AND CABLE. INSTALLATION SHALL BE IN ACCORDANCE WITH NATIONAL ELECTRIC CODE AND SAFETY REGULATIONS. TRENCHING AND BACKFILLING SHALL BE CONTRACTOR¿S RESPONSIBILITY.
Jan 12, 2012P00011$11.1KNON-ROUTINE SERVICE CHARGE: UPGRAD BLDG. 130 PAD MOUNTED TRANSFORMER AND FEEDER CABLE.
Sep 29, 2011P00010$184.7KREPAIR ELECTRICAL FEEDERS
Sep 26, 2011P00009$24.4KNON-ROUTINE SERVICE CHARGES
Apr 4, 2011P00008$45.0KTHE PURPOSE OF THIS MODIFICATION IS THE INSTALLATION OF SOLAR PANEL ARRAY TO THE ELECTRICAL DISTRIBUTUION SYSTEM AT NAS KINGSVILLE, TX.
Aug 3, 2010P00007$28.0KFACILITIES CHARGE
Jan 11, 2010P00006$0MODIFICATION TO INITIAL SYSTEM MODIFICATION CONTRACT ATTACHMENT - SECTION J, CORPUS CHRISTI/KINGSVILLE, TX ELECTRIC UP CONTRACT
Jun 10, 2009P00005$26.4KREDIRECT POWER TO BUILDING 4777 TO ISOLATE FROM THE TRANSFORMER FEEDING BUILDING 760, NAS KINGSVILLE, TX
May 26, 2009P00002$0MOD TO CONFIRM THE VERBAL NOTICE GIVEN ON 8/13/08 TO PROVIDE HIGH VOLTAGE TO A TRANSFORMER TO POWER TEMPORARY TRAILERS FOR VT28.
May 26, 2009P00003$0EXTEND PRIMARY ELECTRICAL DISTRIBUTION SYSTEM NAS CORPUS CHRISTI TX
May 26, 2009P00004$14.6KTHE PURPOSE OF THIS MODIFICATION IS TO REDIRECT POWER TO BUILDING 4777 SO THAT IT IS ISOLATED FROM THE TRANFORMER FEEDING THE UNDER-RENOVATION BUILDING 760
Oct 6, 2008P00001$0ADM MOD TO EDIT SCOPE & INVOICE INSTRUCTIONS
Mar 17, 20080$0NAS CORPUS CHRISTI/NAS KINGSVILLE ELECTRIC UTILITIES PRIVATIZATION CONTRACT

Estimated positioning window

Mar 16, 2057 – Sep 16, 2057

Recompete signal:
35/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 35/100. Available recorded signals: 30 points.

Contract end 2058-03-16 (11458 days from calculation)
+5 points
0 historical awards in this buyer and category group
+0 points
34 recorded award transactions
+10 points
Latest award action: 2026-04-15
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.