Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM SOUTHEAST
NAICS236220 — Commercial and Institutional Building Construction
PSCZ1AZ — MAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Parent award / vehicleN6945021D0061
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$19.1M
Current contract value$19.1M
Potential contract value / ceiling$19.1M
Start dateSep 23, 2022
Current end dateFeb 27, 2026
Potential end dateFeb 27, 2026
Latest award activityApr 7, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 7, 2026P00031$-59.8KREDUCE CLIN 001 BY $43,804.00 AND CLIN 002 BY $15,993.00
Nov 24, 2025P00030$-57.4KPC 057 RFP 057 - AREA C CABLE TRAY AND PC 075 RFP 075 - ACCESS PANEL AND CLEANOUT
Sep 29, 2025P00029$89.2KPC 057 RFP 057 - AREA C CABLE TRAY AND PC 075 RFP 075 - ACCESS PANEL AND CLEANOUT
Jul 31, 2025P00028$43.0KPC 057 RFP 057 - AREA C CABLE TRAY AND PC 075 RFP 075 - ACCESS PANEL AND CLEANOUT
Jul 10, 2025P00027$131.2KTHIS MODIFICATION IS FOR PC 054 RFP 054 REPLACE MEN'S SHOWER, PC063 RFP 063 - 2ND FLOOR MECHANICAL MODS, PC068 RFP 068 2ND FLOOR WALL CHANGES, PC071 RFP 071 VAV POWER ISSUE, AND PC074 RFP 074 2ND FLOOR RR DUCTWORK
May 20, 2025P00026$63.9KPC 053 RFP 053 WALL TILE DEMO, PC 060 RFP 060 2ND FLOOR SELECTIVE DEMO, PC 061 RFP 061 M201 METAL TRACKS, PC 066 RFP 066 HALLWAY CHANGES, PC 070 RFP 070 SCS PIER PIPE SUPPORT WELD RUST CLEANING, PC 072 RFP 072 - 2ND FLOOR FURNITURE AND POWER CONFLICT
May 7, 2025P00025$0181 DAY TIME EXTENSION
May 6, 2025P00024$83.7KMOD FOR TELECOMMS, TRANSITION STRIP #2, BATHROOM STUDS 2,BATHROOM FLOORING,2ND FLOOR RESTROOM DUCT WORK ABOVE CEILING, 2ND FLOOR LIGHTING, WATER VALVE REPAIR, MOLD REMEDIATION, AND 2ND FLOOR LIGHTING 2