Federal contract award

N6945025F1005

TASK ORDER (TO) IS TO PERFORM A HOLISTIC EVALUATION OF THE STORMWATER MANAGEMENT OF THE INSTALLATION TO DEVELOP A NUMERICAL HYDROLOGY MODEL AND COMPREHENSIVE REPORT THAT WILL SUMMARIZE STUDY FINDINGS, MODELING RESULTS, AND PROJECTED FUTURE CONDITIONS

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM SOUTHEAST
NAICS541330 — Engineering Services
PSCC211 — Architect - Engineer Services (including landscaping, interior layout, and designing)
Parent award / vehicleN6945020D0031
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$0
Current contract value$517.0K
Potential contract value / ceiling$517.0K
Start dateJun 13, 2025
Current end dateSep 30, 2026
Potential end dateSep 30, 2026
Latest award activityAug 7, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 7, 2025P00001$-514.0KTASK ORDER (TO) IS TO PERFORM A HOLISTIC EVALUATION OF THE STORMWATER MANAGEMENT OF THE INSTALLATION TO DEVELOP A NUMERICAL HYDROLOGY MODEL AND COMPREHENSIVE REPORT THAT WILL SUMMARIZE STUDY FINDINGS, MODELING RESULTS, AND PROJECTED FUTURE CONDITIONS
Jun 13, 20250$514.0KTASK ORDER (TO) IS TO PERFORM A HOLISTIC EVALUATION OF THE STORMWATER MANAGEMENT OF THE INSTALLATION TO DEVELOP A NUMERICAL HYDROLOGY MODEL AND COMPREHENSIVE REPORT THAT WILL SUMMARIZE STUDY FINDINGS, MODELING RESULTS, AND PROJECTED FUTURE CONDITIONS

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.