Federal contract award
NNG08HZ00C
TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GODDARD SPACE FLIGHT CENTER |
| NAICS | 541330 — Engineering Services |
| PSC | 6650 — Optical Instruments, Test Equipment, Components and Accessories |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS AWARD FEE |
| Obligations | $486.6M |
| Current contract value | $509.5M |
| Potential contract value / ceiling | $509.5M |
| Start date | Dec 13, 2007 |
| Current end date | Jun 25, 2039 |
| Potential end date | Jun 25, 2039 |
| Latest award activity | Aug 31, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 195 of 195 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 31, 2026 | 195 | $150.0K | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jul 27, 2026 | 194 | $216.0K | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| May 24, 2026 | 193 | $0 | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jan 16, 2026 | 192 | $125.0K | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Dec 22, 2025 | 191 | $50.0K | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 29, 2025 | 190 | $150.0K | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jun 27, 2025 | 187 | $0 | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jun 27, 2025 | 188 | $100.0K | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jun 27, 2025 | 189 | $0 | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Apr 14, 2025 | 186 | $0 | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jan 30, 2025 | 185 | $0 | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jan 23, 2025 | 184 | $0 | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 20, 2024 | 183 | $850.0K | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jul 29, 2024 | 182 | $0 | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| May 21, 2024 | 180 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jan 21, 2024 | 179 | $3.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Oct 30, 2023 | 178 | $100.0K | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Oct 3, 2023 | 177 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jul 14, 2023 | 176 | $1.2M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jun 26, 2023 | 175 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jun 8, 2023 | 174 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 27, 2022 | 173 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jul 1, 2022 | 172 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Apr 5, 2022 | 171 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Feb 18, 2022 | 170 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Dec 9, 2021 | 169 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Oct 19, 2021 | 168 | $0 | EO14042 GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 10, 2021 | 167 | $0 | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jun 8, 2021 | 166 | $5.2M | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Apr 19, 2021 | 165 | $0 | COVID-19 MOD TO INCORPORATE ADVANCE AGREEMENT GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 6, 2021 | 164 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Mar 25, 2021 | 162 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Mar 25, 2021 | 163 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Feb 16, 2021 | 161 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Dec 21, 2020 | 160 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Oct 27, 2020 | 158 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Oct 27, 2020 | 159 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Sep 2, 2020 | 157 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Aug 25, 2020 | 156 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Jul 1, 2020 | 155 | $21.1M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Feb 26, 2020 | 154 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Jan 23, 2020 | 153 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Dec 3, 2019 | 152 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Sep 4, 2019 | 151 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Aug 27, 2019 | 150 | $20.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| May 20, 2019 | 149 | $2.5M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 24, 2019 | 148 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 8, 2019 | 147 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 3, 2019 | 146 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Feb 28, 2019 | 145 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Feb 20, 2019 | 144 | $2.5M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Oct 1, 2018 | 142 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Sep 24, 2018 | 143 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Sep 4, 2018 | 141 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Aug 9, 2018 | 140 | $13.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Jul 23, 2018 | 139 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Jun 20, 2018 | 138 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| May 14, 2018 | 137 | $7.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 24, 2018 | 136 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 9, 2018 | 135 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 4, 2018 | 134 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Mar 29, 2018 | 133 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Mar 14, 2018 | 132 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Feb 2, 2018 | 131 | $5.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Sep 21, 2017 | 130 | $12.5M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Aug 30, 2017 | 129 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Aug 23, 2017 | 128 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Jul 19, 2017 | 127 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Jun 14, 2017 | 126 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| May 23, 2017 | 125 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 28, 2017 | 124 | $15.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 13, 2017 | 123 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Feb 28, 2017 | 122 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Feb 17, 2017 | 121 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Feb 9, 2017 | 120 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Feb 2, 2017 | 119 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Dec 12, 2016 | 118 | $8.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Sep 20, 2016 | 117 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Sep 12, 2016 | 116 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Aug 3, 2016 | 115 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| May 31, 2016 | 114 | $32.9M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 14, 2016 | 113 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Mar 7, 2016 | 112 | $10.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Jan 13, 2016 | 111 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Jan 4, 2016 | 110 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Nov 20, 2015 | 109 | $6.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Nov 19, 2015 | 108 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Oct 6, 2015 | 107 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Sep 25, 2015 | 106 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Sep 22, 2015 | 105 | $3.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Sep 1, 2015 | 104 | $13.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Aug 4, 2015 | 103 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Jul 21, 2015 | 102 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 28, 2015 | 101 | $17.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Mar 31, 2015 | 100 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Mar 18, 2015 | 99 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Jan 21, 2015 | 98 | $10.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Nov 24, 2014 | 97 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Oct 29, 2014 | 96 | $12.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Sep 2, 2014 | 95 | $5.3M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Jun 9, 2014 | 94 | $5.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 22, 2014 | 93 | $8.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 1, 2014 | 91 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 1, 2014 | 92 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Feb 18, 2014 | 90 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Jan 16, 2014 | 89 | $16.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Dec 19, 2013 | 88 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Dec 18, 2013 | 87 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Dec 6, 2013 | 86 | $4.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Nov 15, 2013 | 85 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Oct 31, 2013 | 84 | $11.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Aug 5, 2013 | 83 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Jul 15, 2013 | 82 | $3.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| May 21, 2013 | 81 | $11.7M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| May 16, 2013 | 80 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| May 1, 2013 | 79 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Apr 11, 2013 | 78 | $15.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Mar 7, 2013 | 77 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Jan 29, 2013 | 76 | $7.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS. |
| Dec 18, 2012 | 75 | $2.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Nov 15, 2012 | 74 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Oct 25, 2012 | 72 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Oct 25, 2012 | 73 | $5.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Oct 9, 2012 | 71 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 19, 2012 | 70 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Aug 16, 2012 | 69 | $5.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jul 19, 2012 | 68 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jul 17, 2012 | 67 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jun 12, 2012 | 66 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| May 9, 2012 | 65 | $2.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Apr 16, 2012 | 64 | $5.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Mar 26, 2012 | 63 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Mar 20, 2012 | 62 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Mar 1, 2012 | 61 | $8.5M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Feb 24, 2012 | 60 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jan 12, 2012 | 59 | $6.5M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Dec 12, 2011 | 58 | $2.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Oct 31, 2011 | 57 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Oct 19, 2011 | 56 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 23, 2011 | 55 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 12, 2011 | 53 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 12, 2011 | 54 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jul 21, 2011 | 52 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jun 8, 2011 | 51 | $3.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Apr 18, 2011 | 50 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Apr 8, 2011 | 49 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Apr 7, 2011 | 48 | $10.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Mar 15, 2011 | 47 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Feb 8, 2011 | 46 | $10.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jan 25, 2011 | 45 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Nov 10, 2010 | 44 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Oct 5, 2010 | 43 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 17, 2010 | 42 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 2, 2010 | 40 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 2, 2010 | 41 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Aug 13, 2010 | 39 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jul 29, 2010 | 38 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jul 19, 2010 | 37 | $3.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jul 13, 2010 | 36 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jun 17, 2010 | 35 | $20.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jun 16, 2010 | 33 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jun 16, 2010 | 34 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Apr 20, 2010 | 32 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Apr 7, 2010 | 30 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Apr 7, 2010 | 31 | $30.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Mar 10, 2010 | 29 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Mar 9, 2010 | 28 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jan 27, 2010 | 27 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jan 20, 2010 | 26 | $7.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jan 12, 2010 | 25 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Oct 29, 2009 | 24 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 29, 2009 | 23 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 3, 2009 | 22 | $20.5M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Aug 31, 2009 | 21 | $7.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jul 22, 2009 | 20 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jun 22, 2009 | 18 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jun 22, 2009 | 19 | $3.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jun 9, 2009 | 17 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| May 1, 2009 | 15 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Apr 27, 2009 | 16 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Apr 7, 2009 | 14 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Mar 30, 2009 | 13 | $13.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Mar 4, 2009 | 11 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Mar 4, 2009 | 12 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jan 13, 2009 | 10 | $2.5M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Dec 22, 2008 | 9 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Dec 18, 2008 | 8 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 17, 2008 | 7 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Sep 8, 2008 | 6 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Jul 17, 2008 | 5 | $6.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| May 30, 2008 | 1 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| May 30, 2008 | 4 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Mar 28, 2008 | 3 | $5.0M | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Mar 7, 2008 | 2 | $0 | GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
| Oct 31, 2007 | 0 | $3.0M | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS |
Estimated positioning window
Jun 25, 2038 – Dec 25, 2038
Modeled likelihood: 35%. These are AcornBids estimates, not confirmed solicitation dates.
{
"psc": "6650",
"naics": "541330",
"agency": "National Aeronautics and Space Administration",
"office": "NASA GODDARD SPACE FLIGHT CENTER",
"incumbent": "LOCKHEED MARTIN CORPORATION",
"known_forecast": false,
"option_end_date": "2039-06-25",
"contract_end_date": "2039-06-25",
"latest_action_date": "2026-08-31",
"modification_count": 195,
"previous_solicitation": "NNG07184919R"
}Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.