Federal contract award
NNG09EK06C
DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GODDARD SPACE FLIGHT CENTER |
| NAICS | 336414 — Guided Missile and Space Vehicle Manufacturing |
| PSC | 1820 — Space Vehicle Components |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST NO FEE |
| Obligations | $33.5M |
| Current contract value | $37.3M |
| Potential contract value / ceiling | $37.3M |
| Start date | Jan 1, 2009 |
| Current end date | Sep 30, 2028 |
| Potential end date | Sep 30, 2028 |
| Latest award activity | Aug 26, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 84 of 84 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 26, 2026 | 83 | $895.9K | THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL FUNDING LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION |
| Jun 26, 2026 | 82 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE 52.222-90 LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION |
| Jun 3, 2026 | 81 | $585.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS. LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION |
| Jan 20, 2026 | 80 | $500.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS. LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION |
| Sep 23, 2025 | 79 | $850.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS. LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION |
| Jul 31, 2025 | 78 | $300.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS. LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION |
| Apr 25, 2025 | 77 | $75.0K | THE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH EXECUTIVE ORDER (E.O.) 14168, E.O. 14173, E.O. 14148, AND E.O. 14208 BY REMOVING SPECIFIC CONTRACT CLAUSES OR REPLACING THEM WITH THEIR DEVIATED VERSION. IT ALSO ADDS FUNDING AND UPDATES THE CO INFORMATION LISTED IN GSFC CLAUSE 52.242-90. LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION |
| Feb 24, 2025 | 76 | $1.0M | LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION |
| Jan 24, 2025 | 75 | $0 | REMOVAL OF CLAUSES/DRDS IAW EO 14035--DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jan 22, 2025 | 74 | $500.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Dec 13, 2024 | 73 | $600.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Sep 27, 2024 | 72 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Sep 5, 2024 | 71 | $83.1K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jul 17, 2024 | 70 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jun 26, 2024 | 69 | $700.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jan 12, 2024 | 68 | $600.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Nov 17, 2023 | 67 | $500.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Aug 26, 2023 | 66 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Aug 1, 2023 | 65 | $500.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jul 27, 2023 | 64 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| May 31, 2023 | 63 | $500.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Apr 14, 2023 | 62 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Mar 2, 2023 | 61 | $500.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| May 6, 2022 | 60 | $2.0M | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jan 13, 2022 | 59 | $500.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jan 10, 2022 | 58 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Oct 29, 2021 | 57 | $0 | EO14042 DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Sep 1, 2021 | 56 | $927.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Apr 23, 2021 | 55 | $1.5M | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jan 6, 2021 | 54 | $100.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Sep 21, 2020 | 53 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jul 22, 2020 | 52 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| May 28, 2020 | 51 | $796.4K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Apr 16, 2020 | 50 | $1.0M | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Mar 13, 2020 | 49 | $150.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Dec 26, 2019 | 48 | $250.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Oct 24, 2019 | 47 | $303.6K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Sep 30, 2019 | 46 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Apr 30, 2019 | 45 | $1.5M | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Apr 10, 2019 | 44 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Apr 2, 2019 | 43 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Mar 29, 2019 | 42 | $90.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Mar 12, 2019 | 41 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jan 30, 2019 | 40 | $300.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Nov 30, 2018 | 39 | $82.4K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Oct 16, 2018 | 38 | $500.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Aug 15, 2018 | 37 | $340.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| May 16, 2018 | 36 | $250.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Mar 28, 2018 | 35 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Mar 22, 2018 | 34 | $300.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Oct 26, 2017 | 33 | $500.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Sep 13, 2017 | 32 | $325.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jun 15, 2017 | 31 | $600.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jan 30, 2017 | 30 | $750.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Dec 5, 2016 | 29 | $500.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jun 27, 2016 | 28 | $415.2K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jun 16, 2016 | 27 | $130.7K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| May 3, 2016 | 26 | $779.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Oct 20, 2015 | 25 | $600.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Sep 29, 2015 | 24 | $410.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jul 6, 2015 | 23 | $643.7K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Apr 7, 2015 | 22 | $600.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Mar 31, 2015 | 21 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Mar 16, 2015 | 20 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jan 13, 2015 | 19 | $374.3K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Nov 21, 2014 | 18 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Oct 22, 2014 | 17 | $331.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Aug 22, 2014 | 16 | $300.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jul 30, 2014 | 15 | $100.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jun 10, 2014 | 14 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Apr 15, 2014 | 13 | $571.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Sep 24, 2012 | 12 | $1.6M | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Apr 25, 2012 | 11 | $757.3K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Apr 12, 2012 | 10 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Apr 11, 2012 | 9 | $836.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| May 12, 2011 | 8 | $950.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Apr 8, 2011 | 7 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Mar 9, 2011 | 6 | $345.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Nov 2, 2010 | 5 | $375.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jan 4, 2010 | 4 | $62.9K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Dec 8, 2009 | 3 | $0 | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Sep 11, 2009 | 2 | $594.7K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jan 22, 2009 | 1 | $335.9K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
| Jan 1, 2009 | 0 | $200.0K | DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT |
Estimated positioning window
Sep 30, 2027 – Mar 30, 2028
55/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 55/100. Available recorded signals: 50 points.
- Contract end 2028-09-30 (706 days from calculation)
- +25 points
- 1 historical awards in this buyer and category group
- +0 points
- 84 recorded award transactions
- +10 points
- Latest award action: 2026-08-26
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.