Federal contract award

NNG09EK06C

DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GODDARD SPACE FLIGHT CENTER
NAICS336414 — Guided Missile and Space Vehicle Manufacturing
PSC1820 — Space Vehicle Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST NO FEE
Obligations$33.5M
Current contract value$37.3M
Potential contract value / ceiling$37.3M
Start dateJan 1, 2009
Current end dateSep 30, 2028
Potential end dateSep 30, 2028
Latest award activityAug 26, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 84 of 84 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 26, 202683$895.9KTHE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL FUNDING LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION
Jun 26, 202682$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE 52.222-90 LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION
Jun 3, 202681$585.0KTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS. LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION
Jan 20, 202680$500.0KTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS. LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION
Sep 23, 202579$850.0KTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS. LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION
Jul 31, 202578$300.0KTHE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDS. LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION
Apr 25, 202577$75.0KTHE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH EXECUTIVE ORDER (E.O.) 14168, E.O. 14173, E.O. 14148, AND E.O. 14208 BY REMOVING SPECIFIC CONTRACT CLAUSES OR REPLACING THEM WITH THEIR DEVIATED VERSION. IT ALSO ADDS FUNDING AND UPDATES THE CO INFORMATION LISTED IN GSFC CLAUSE 52.242-90. LUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION
Feb 24, 202576$1.0MLUNAR RECONNAISSANCE ORBITER (LRO) DIVINER RADIOMETER SCIENCE MISSION
Jan 24, 202575$0REMOVAL OF CLAUSES/DRDS IAW EO 14035--DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jan 22, 202574$500.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Dec 13, 202473$600.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Sep 27, 202472$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Sep 5, 202471$83.1KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jul 17, 202470$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jun 26, 202469$700.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jan 12, 202468$600.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Nov 17, 202367$500.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Aug 26, 202366$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Aug 1, 202365$500.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jul 27, 202364$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
May 31, 202363$500.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Apr 14, 202362$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Mar 2, 202361$500.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
May 6, 202260$2.0MDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jan 13, 202259$500.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jan 10, 202258$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Oct 29, 202157$0EO14042 DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Sep 1, 202156$927.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Apr 23, 202155$1.5MDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jan 6, 202154$100.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Sep 21, 202053$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jul 22, 202052$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
May 28, 202051$796.4KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Apr 16, 202050$1.0MDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Mar 13, 202049$150.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Dec 26, 201948$250.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Oct 24, 201947$303.6KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Sep 30, 201946$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Apr 30, 201945$1.5MDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Apr 10, 201944$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Apr 2, 201943$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Mar 29, 201942$90.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Mar 12, 201941$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jan 30, 201940$300.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Nov 30, 201839$82.4KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Oct 16, 201838$500.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Aug 15, 201837$340.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
May 16, 201836$250.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Mar 28, 201835$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Mar 22, 201834$300.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Oct 26, 201733$500.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Sep 13, 201732$325.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jun 15, 201731$600.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jan 30, 201730$750.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Dec 5, 201629$500.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jun 27, 201628$415.2KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jun 16, 201627$130.7KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
May 3, 201626$779.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Oct 20, 201525$600.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Sep 29, 201524$410.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jul 6, 201523$643.7KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Apr 7, 201522$600.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Mar 31, 201521$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Mar 16, 201520$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jan 13, 201519$374.3KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Nov 21, 201418$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Oct 22, 201417$331.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Aug 22, 201416$300.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jul 30, 201415$100.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jun 10, 201414$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Apr 15, 201413$571.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Sep 24, 201212$1.6MDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Apr 25, 201211$757.3KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Apr 12, 201210$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Apr 11, 20129$836.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
May 12, 20118$950.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Apr 8, 20117$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Mar 9, 20116$345.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Nov 2, 20105$375.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jan 4, 20104$62.9KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Dec 8, 20093$0DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Sep 11, 20092$594.7KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jan 22, 20091$335.9KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT
Jan 1, 20090$200.0KDIVINER LUNAR RADIOMETER EXPERIMENT (DLRE), UNIVERSITY OF CALIFORNIA-LOS ANGELES (UCLA) SEGMENT, PHASE D/E EFFORT UNDER THE LRO PROJECT

Estimated positioning window

Sep 30, 2027 – Mar 30, 2028

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2028-09-30 (706 days from calculation)
+25 points
1 historical awards in this buyer and category group
+0 points
84 recorded award transactions
+10 points
Latest award action: 2026-08-26
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.