Federal contract award

NNG10AZ01D

THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GODDARD SPACE FLIGHT CENTER
NAICS541690 — Other Scientific and Technical Consulting Services
PSCZ249 — Maintenance, Repair or Alteration of Other Utilities
Parent award / vehicleDEAM3699EE73682
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$44.2M
Current contract value$57.4M
Potential contract value / ceiling$57.4M
Start dateDec 22, 2009
Current end dateNov 1, 2029
Potential end dateNov 1, 2029
Latest award activitySep 22, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 34 of 34 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 22, 2025P000033$3.8MEO14042 THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Sep 10, 202432$3.6MEO14042 THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Sep 29, 202331$0EO14042 THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Sep 13, 202330$3.5MEO14042 THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Sep 14, 202229$3.3MEO14042 THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Nov 2, 202128$0EO14042 THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Oct 21, 202127$860.6KTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Sep 21, 202126$2.3MTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Oct 28, 202025$3.0MTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Jan 13, 202024$363.1KTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Nov 20, 201923$0THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Sep 24, 201922$0THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Aug 19, 201920$0THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Aug 19, 201921$2.4MTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Feb 22, 201919$0THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Feb 15, 201918$0THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Feb 6, 201917$0THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Sep 13, 201816$2.3MTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Jun 11, 201815$0THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Sep 7, 201714$2.2MTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Sep 14, 201613$2.1MTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Oct 14, 201412$0THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Sep 30, 201411$2.0MTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Jan 21, 201410$50.8KTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Aug 15, 20139$1.9MTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Sep 28, 20128$1.7MTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Aug 16, 20127$1.5MTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Jul 24, 20126$0THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
May 30, 20125$0THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Sep 12, 20114$5.5MTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Aug 4, 20113$1.4MTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Aug 16, 20102$0THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Mar 23, 20101$0THIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE
Dec 22, 20090$412.5KTHIS CONTRACT IS FOR THE SUPPLY AND INSTALLATION OF ENERGY CONSERVATION MEASURES (ECMS) TO THE FOLLOWING: ECM 1, HIGH EFFICIENCY LIGHTING RETROFITS ECM 2, BOILER DECENTRALIZATION ECM-3, WIND TURBINES ECM-4, BUILDING AUTOMATION SYSTEM/DIRECT DIGITAL CONTROL (BAS/DDC) UPGRADE

Estimated positioning window

Nov 1, 2028 – May 1, 2029

Recompete signal:
25/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 25/100. Available recorded signals: 20 points.

Contract end 2029-11-01 (1103 days from calculation)
+5 points
0 historical awards in this buyer and category group
+0 points
34 recorded award transactions
+10 points
Latest award action: 2025-09-22
+0 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.